Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 l
December 11,1998 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 0
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for November,1998 l
In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of November is provided.-
Please contact Marcus H. Voth, Project Manager - Licensing at (612) 271-5116 if you require further information.
Marcus H. Voth Project Manager-Licensing lI Nuclear Energy Engineering Dept.
c:
Regional Administrator - 111, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota I f Attn: Kris Sanda J Silberg g
Y) 9812180121 981130 F
PDR ADOCK 05000263,
R PDR m
i-1
)
OPERATING DATA REPORT DOCKET NO.
50-263 i
DATE 12- ~1-98 COMPLSTED BY H. H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS TNotes j
- 1. Unit Name Monticello
]
]
- 2. Reporting period:
November
]
]
- 3. Licensed Thermal Power (RWt):
1775
]
]
- 4. 14ameplate Rating (Gross MWe) :
613.0
]
]
- 5. Desian Electrical Rating (Net MWe):
600.0
]
]
- 6. Maximum Dependable Capacity (Gross MWeTT 605.1
]
]
- 7. Maximum Dependable Capacity (Net MWe) :
578.1
]
]
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7T~Since Last 1
Report, Give Reasons: Monticello was rerated to a new licensed power of l
1775 MWt during October.
Final tested new electrical ratings are shown.~[
j 9.
Power Level To Which Restricted, If Any (Net MWe) :
N/A
- 10. Reasons For Restrictions, If Any: __N/A l
THIS MONTH YR.-TO-DATE CUMULATIVE i
- 11. Hours In Reporting Period 720 8016 240361
- 12. Number Of Hours Reactor Was Critical 720.0 6978.0 197022.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 720.0 6917.7 193851.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1271998 11216476 302072081
- 17. Gross Electrical Energy Generated (MWH) 443928 3837370 102318745 l
- 18. Net Electrical Energy Generated (tGC3) 429167 3678014 97939071
- 19. Unit Service Factor 100.0%
86.3%
80.7%
- 20. Unit Availability Factor 100.0%
86.3%
80.7%
- 21. Unit Capacity Factor (Using MDC Net) 103.1%
83.8%
75.9%
- 22. Unit Capacity Factor (Using DER Net) 99.3%
82.3%
74.6%
- 23. Unit Forced Outage Rate 0.0%
3.0%
4.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
- 26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello DATE 12-1-98
~~~
COMPLETED BY H. H. Paust.ian TELEPHONE 612/295-5151 MONTH OF November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 594.
17
- 599, 2:
597.
18 599.
3 521.
19 599.
4 595.
20 601.
5 598.
21 596.
'6 597.
22 601.
7 599.
23 597.
8 599.
24 600.
9 604.
25 600.
10 593.
26 600 11 598.
27 600.
12 601.
28 600-.
13 597.
29 599.
14 599.
30 602.
15 599.
16 598.
INSTRUCTIONS On'this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
.. _ -,....... ~ _. _., _..
..., _.. _ -. _. _ _, _.. _... -., ~.......... _.
j '.
- -/,
4 1
i I
I y
vn. '.-
- MARRATIVE'
SUMMARY
- OF' OPERATING EXPERIENCE c
v: ;;.8
',-(;: $ %
,, q v,
~
1
- ),
DOCKET NO.
50-263
- s i
DATE 12
'i-98.
L COMPLETED.BY H. H.
Paustian 1
TELEPHONE 612/295-5151 i'
' GMONTH
. NOV
,l T
r,:
$11-01-98'-
"9_"
... Power-operation.'
.to.
c r11-03,.
Power. reduction to 47*s for Recirculation System MG Set T11-03-98 n.-
brush' replacement;
.q.
~
.11-03-98
. to
. Power operation.
~
q~
?11-30,
f-f.
1
>1 U
t_ '
t T
Note: Power operation-defined ~as essentially 100% of rated power except for weekend load drops for
,,a specified surveillance testing.
)
.j i
(:
i
)
'iy
[
l o
p.
.. u
~. -
.~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 54263
\\
UNIT NAME Monticcito DATE 12-01-98 COMPLETED BY H. H. Paustian
~
REPORT MONTH November TELEPHONE 612-295-5151.
Method l
of
- System Comp Cause & Corrective l
Type Duration Reason Shutdown Code Code Action to No.
Date (i)
(hours)
(2)
(3)
LER No.
(4)
(5)
Prevent Recurrence 12 11-3-98 S
0.0 B
4 N/A Power reduction to 47% to perform brush exchange for Recirculation System Motor-Generator set.
I 4
l I
1 2
3 4
F Forced Reason:
Method:
Draft IEEE Standard S
Scheduled A
Equipmcat Failure (Explain) 1 Manual 805-1984 (P805-D5)
B Maintenance or Test 2
Refueling 3
D Regulator Restriction 4
Other(Explain) iEEE Standard 803A-1983 E
Operator Training & Licensing Examination F
Administrative G
Operationa! Error (Explain)
H Other(Explain)
-