Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 January 12,1996 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operatina Report for December 1995 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of December is provided.
Please contact Marv Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.
)
he ?.Oh Roger O An n
Director Licensing and Management Issues j
c:
Reg;onal Administrator-Ill, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg
$80075
/ {$
9601180295 951231 7
A PDR ADOCK 05000263 R
/
OPERATING DATA REPORT DOCKET NO.
50-263 DATE 1-1-96 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
- 1. Unit Name Monticello
]
]
- 2. Reporting period:
December
]
]
- 3. Licensed-Thermal Power (MWt):
1670
]
]
- 4. Nameplate Rating (Gross MWe) :
569
]
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
- 6. Maximum Dependable Capacity (Gross MWe) :
- 7. Maximum Dependable Capacity (Net MWe):
--564
]
]
536
]
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744 8760 214801
- 12. Number Of Hours Reactor Was Critical 744.0 8760.0 175759.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 744.0 8760.0 172870.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1230223 14566337 268052789
- 17. Gross Electrical Energy Generated ()MWH) 422596 4946553 90630031
- 18. Net Electrical Energy Generated (1661) 407073 4756262 86731372
- 19. Unit Service Factor 100.0%
100.0%
80.5%
- 20. Unit Availability Factor 100.0%
100.0%
80.5%
- 31. Unit Capacity Factor (Using MDC Net) 102.1%
101.3%
75.3%
- 22. Unit Capacity Factor (Using DER Net) 100.3%
99.6%
74.0%
- 23. Unit Forced Outage Rate 0.0%
0.0%
3.4%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_ Refueling - 4/10/96 - 38 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
6 AVERAGE-DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello
- i DATE 1-1-96 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 MONTH OF December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 552.
17
- 546, 2
552.
18 552.
j 3
488.
19 553.
4 553.,
20 552.
5 552.
21 552.
6 552.
22 553.
7 543.
23 552.
8 551.
24 553.
9 549.
25 552.
10 555.
26 552.
i 11 551.
27 552.
12 553.
28 551.
13
- 551, 29 549.
14 551.
30 550.
15 551.
31 487.
16 552.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I'~
e NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 1-1-96 COMPLETED BY H. H.
Paustian TELEPHONE-612/295-5151 MONTH DEC 12-01-95 to-Power operation.
12-31-95 i
Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
i
,_._.a,.
I UNIT SHITrD0VNS AND POWER REDUCTIONS DOCKET NO.
50-263 i
UNIT NAME lonticello 4
i d
DATE 01-02-96 COMPLETED BY H. H. Paustian REPORT MONTH December TELEPHONE _612/295-5151 -
4 Duration Reason Method LER System Comp.
Cause & Corrective No.
Date Ty(pe 1)
(hours)
(2) of No.
Code Code Action to Shutdown (4)
(5)
Prevent Recurrence (3)
None i
l.
L i
i o
i r
i I
1 2
-3 4
F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Milntenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination i