Monthly Operating Rept for Sept 1996 for Monticello Nuclear Generating Plant
ML20128Q783
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/30/1996
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9610210168
Download: ML20128Q783 (5)


Text

5 Noethem States Power Company Monticello Nuclear Generating Plant 2007 West Hwy 75 Monticello, Minnesota 55362-9637 October 11,1996 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for September,1996 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of September is provided.

Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.

-hr%Db Roger O Anderson Director Licensing and Manag? ment issues c:

Regional Administrator-lil, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg l

i 9610210168 960930 l

PDR ADOCK 05000263 f

R PDR 210033

OPERATIWG DATA REPORT DOCKET NO.

50-263 DATE 10- 1-96 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 1

OPERATING STATUS

-] Notes J

Monticello

]

]

1. Unit Name
2. Reporting period:

September

]

]

3. Licensed Thermal Power (MWt) :

1670

]

]

4. Nameplate Rating-(Gross MWe):

576.5

]

]

5. Design Electrical Rating (Net MWe) :

552.9

]

]

6. Maximum Dependable Capacity (Gross MWe): 571.5

]

]

7. Maximum Dependable Capacity (Net MWc) :

543.5

]

]

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe) :

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 720 6575 221376
12. Number Of Hours Reactor Was Critical 720.0 5488.4 181248.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 720.0 5336.1 178206.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1201776 8326233 276379022
17. Gross Electrical Energy Generated (MWH) 413320 2828998 93459029
18. Net Electrical Energy Generated (PGGI) 396953 2701856 89433228
19. Unit Service Factor 100.0%

81.2%

80.5%

30. Unit Availability Factor 100.0%

81.2%

80.5%

21. Unit Capacity Factor (Using MDC Net) 101.4%

76.2%

75.4%

22. Unit Capacity Factor (Using DER Net) 99.7%

74.9%

74.1%

23. Unit Forced Outage Rate 0.0%

3.8%

3.4%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

_None

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT Monticello-DATE

.10-1-96 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH OF September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 544.

17 551.

2 544.

18 563.

3 552.

19 548.

4 535.

20 556.

5 540.

21 558.

6

539, 22 559.

7

542, 23 557.

8 546.

24 556.

9

545, 25 558.

10 545.

26 558.

11 546.

27 559.

12 549.

28 559.

13 548.

29 559.

14 555.

30 558.

15 554.

16 559.

INSTRUCTIONS On this format, list the average daily unit power level in MWc-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUIDOVNS AND POVER REDUCTIONS DOCKET NO. 50-263

(

UNIT NAME l onticE11F

DATE ~10-01-%

COMPLETED BY ~H. B. Paustian REPORT MONTH September TELEPHotE _612/295-5151 -

Duration Reason Method LER S* stem Comp.

Cause & Corrective No.

Date Ty(pe (hours)

(2) of No.

e Code Action to 1)

Shutdown (4)

(5)

Prevent Recurrence (3)

None 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-0 rator Training & License Examination F-A inistrative G-Operational Error (Explain)

H-Other (Explain) m

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 10- 1-96 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH SEP 09-01-96 to Power operation 09-30-96 1

Note: Power operation defined as essentially 100% of rated power except for weekend load drops for i

specified surveillance testing.

0

.