ML23255A287

From kanterella
Revision as of 12:07, 13 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A
ML23255A287
Person / Time
Site: Nine Mile Point, Limerick  Constellation icon.png
Issue date: 09/12/2023
From: Scott Wall
NRC/NRR/DORL/LPL3
To: Tom Loomis
Constellation Energy Generation
Wall S
References
L-2023-LLR-0046
Download: ML23255A287 (3)


Text

From: Scott Wall Sent: Tuesday, September 12, 2023 2:35 PM To: Loomis, Thomas R:(Constellation)

Cc: Steinman, Rebecca L:(Exelon Nuclear); Helker, David P:(Constellation Nuclear); Gudger, David T:(Constellation)

Subject:

Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A (EPID: L-2023-LLR-0046)

Dear Mr. Loomis:

By letter dated August 25, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23237A737), Constellation Energy Generation, LLC (CEG, the licensee) requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, at the following units:

  • Limerick Generating Station, Units 1 and 2
  • Nine Mile Point Nuclear Station, Units 1 and 2

Specifically, CEG requests relief from the successive inspection requirements of ASME Section XI, IWB-2420 (Successive Inspection) for the remainder of the current fourth interval and until the next required inspection is performed per the requirements of BWRVIP-75-A in the fifth interval.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR),

the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this review will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review by February 1, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-2855 or e-mail at Scott.Wall@nrc.gov.

Scott P. Wall, LSS BB, BSP Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 2233

Mail Envelope Properties (SA1PR09MB9605BAD2D6D28A4E35F8576B92F1A)

Subject:

Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A (EPID L-2023-LLR-0046)

Sent Date: 9/12/2023 2:35:11 PM Received Date: 9/12/2023 2:35:15 PM From: Scott Wall

Created By: Scott.Wall@nrc.gov

Recipients:

"Steinman, Rebecca L:(Exelon Nuclear)" <Rebecca.Steinman@constellation.com>

Tracking Status: None "Helker, David P:(Constellation Nuclear)" <david.helker@constellation.com>

Tracking Status: None "Gudger, David T:(Constellation)" <david.gudger@constellation.com>

Tracking Status: None "Loomis, Thomas R:(Constellation)" <thomas.loomis@constellation.com>

Tracking Status: None

Post Office: SA1PR09MB9605.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 3821 9/12/2023 2:35:15 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: