ML24250A018
ML24250A018 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 08/02/2024 |
From: | Heather Gepford NRC/RGN-IV/DORS/OB |
To: | Pacific Gas & Electric Co |
References | |
Download: ML24250A018 (1) | |
Text
EXAM ASSIGNMENT TICKLER
Chief: Kelly Clayton Facility: DC 8/2/2024Date of Written Exam:
App count 6 / 9 / 1 Start of Op Test: 7/15/2024 7/22/2024End of Op Test:
Written Exam Developed By: Facility Operating Test Developed By: Facility Due Date Description Date Complete Initials Notes
Examination administration date confirmed (A.1-5). For NRC 11/13/2023 7/27/2023 KCprepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
12/18/2023 7/27/2023 KCNRC examiners and facility licensee contact assigned (B.1 and C.1-3)
Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee 12/18/2023 7/27/2023 KCcontact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
12/18/2023 N/A KCReference material due for NRC prepared examinations (F)
12/18/2023 7/27/2023 KCExamination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5) Letter 2.1-1 produced by CE
Written examination outline developed by the NRC and sent to 1/1/2024 7/27/2023 KCthe facility licensee contact (must be on the examination security Form ES-4.1 agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 2/12/2024 2/12/2024 KC3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
2/26/2024 2/26/2024 KCOperating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3). Form 2.3-1 signed by CE & BC 7/8/24
4/1/2024 NA KCNRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3). Licensee prepared
Proposed examinations (written, JPMs, and scenarios, as 5/8/2024 5/8/2024 KCapplicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
5/16/2024 5/8/2024 KCPreliminary waiver/excusal requests due (ES-2.2 E.1). NONE Written examination and operating test reviews completed (ES-5/26/2024 5/26/2024 KC2.3). The NRC supervisors authorization to proceed with the Document review on Form 2.3-5 facility review granted (ES-2.3 D).
5/26/2024 5/26/2024 KCExamination review results discussed between the NRC and the facility licensee (B.14).
6/17/2024 6/17/2024 KCPreliminary license applications & waiver/excusal requests dueNRC Forms 398/396-
6/17/2024 6/17/2024 KCOn-site validation & 10% audit of license applications (I)
7/1/2024 7/1/2024 KCFinal license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E). Form 2.2-1 prepared
7/8/2024 7/8/2024 KCWritten examinations and operating tests approved by the NRC supervisor (C.9) 7/8/2024 7/8/2024 KCFacility licensee management feedback on the examination requested by the NRC supervisor (C.10).
Final applications reviewed; 10% of applications audited to produced and BC signs Exam Approval Letter 7/8/2024 7/8/2024 KCconfirm qualifications/eligibility (ES-2.2 G); and examination Form 2.3-1 approval letter (Letter 2.3-1) and waiver/excusal letters sent.
7/8/2024 7/8/2024 KCWritten examination administration guidelines reviewed with the facility licensee (D.14).
7/8/2024 7/8/2024 KCApproved scenarios and job performance measures distributed to NRC examiners (D.12).
7/15/2024 7/15/2024 KCAdminister Operating Test
7/29/2024 7/31/2024 KCExaminer's document op test results on ES 303's
Received post examination package from facility licensee and Forms to BC (20 days from date of last exam 8/22/2024 8/6/2024 KCverified complete. (ES-4.4)activity-if written is last activity, this is when clock starts)
Reviewed and incorporated any necessary facility and applicant 8/30/2024 8/9/2024 KCwritten examination comments. NRC grading of written examination completed. (ES-4.4)
Reviewed and incorporated any necessary facility and applicant 8/30/2024 8/9/2024 KCoperating test comments. NRC grading of operating test completed. (ES-3.6) 9/6/2024 8/11/2024 KCCompleted NRC chief examiner review of operating test and Forms 5.1-2 complete for all applicants written examination grading. (ES-3.6 and ES-4.4)
9/1/2024 8/15/2024 KCCompleted licensing official review. (BC signs licenses)
9/1/2024 NA KCWaivers/deferrals reviewed for impact on licensing decision
9/1/2024 8/21/2024 KCMailed licenses, preliminary results, and pass letters.
9/1/2024 8/13/2024 KCNotified facility licensee of results. RPS/IP number of examinees updated print Report-21
9/22/2024 NA KCFinal Denial Letters mailed (if no request for informal review)21 days after proposed denial letters mailed.
Issued the examination report (refer to Operator Licensing 10/18/2024 8/28/2024 KCManual Chapter (OLMC) 510, Operator Licensing Examination produced by CE Reports).
10/25/2024 8/28/2024 KCReturned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both. USED BOX
Performed examination recordkeeping activities (refer to OLMC 11/22/2024 8/28/2024 KC520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
Replaces NUREG-1021, Revision 12, Forms ES-2.1-1 and ES-5.1-1
Rev. 12
ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 1 (SRO-I1, SRO-I2, RO-1)
Facility: Diablo Canyon Date of Exam: 0 7/15/ 202 4 Operating Test Number: L 232
A E Scenarios P V Scenario S2 Scenario S4 - - T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I C L M A T S A B S A B S A B S A B U N Y R T O R T O R T O R T O M*
T P O C P O C P O C P O C P E RO I U
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I 1 I/C 1,2,3,4,6 1,2,3,7,8 10 4 4 2
MAJ 5 5,6 3 2 2 1 SRO-U MAN CTL 3,8 2 1 1 0
TS 1,3 2 0 2 2 RX 0 1 1 0 R O NOR 0 1 1 1 I/C 2,3,4,6 1,2,3,4,7, 10 4 4 2 SRO -I2 8 MAJ 5 5,6 3 2 2 1 SRO -U MAN CTL 2,3 2 1 1 0
TS 1,2 2 0 2 2
R X 0 1 1 0 RO -1 NOR 0 1 1 1 SRO -I I/C 1,2,3,4,6 2,4 7 4 4 2
MAJ 5 5,6 3 2 2 1 SRO -U M AN CTL 2 2 2 1 1 0
TS 0 0 2 2
RX 1 1 0 RO NOR 1 1 1 SRO -I I/C 4 4 2
MAJ 2 2 1 SRO -U MAN CTL 1 1 0
TS 0 2 2 Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1. Mark the applicant license level for each simulator operating test number.
- 2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Sc enario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instr ument/Component Failure; MAJ = Major Transient; Man. Ctrl =
Manual Control o f Automatic Function; TS = Technical Specification Evaluation ; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO -U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP
= Balance of Plan
Rev 1 ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 2 (SRO-I3, SRO-I4, RO-2)
Facility: Diablo Canyon Date of Exam: 0 7/15/ 202 4 Operating Test Number: L 232
A E Scenarios P V Scenario S2 Scenario S4 - - T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I C L M A T S A B S A B S A B S A B U N Y R T O R T O R T O R T O M*
T P O C P O C P O C P O C P E RO I U
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I 3 I/C 1,2,3,4,6 1,2,3,7,8 10 4 4 2
MAJ 5 5,6 3 2 2 1 SRO-U MAN CTL 3,8 2 1 1 0
TS 1,3 2 0 2 2 RX 0 1 1 0 R O NOR 0 1 1 1 I/C 2,3,4,6 1,2,3,4,7, 10 4 4 2 SRO -I4 8 MAJ 5 5,6 3 2 2 1 SRO -U MAN CTL 2,3 2 1 1 0
TS 1,2 2 0 2 2
R X 0 1 1 0 RO -2 NOR 0 1 1 1 SRO -I I/C 1,2,3,4,6 2,4 7 4 4 2
MAJ 5 5,6 3 2 2 1 SRO -U M AN CTL 2 2 2 1 1 0
TS 0 0 2 2
RX 1 1 0 RO NOR 1 1 1 SRO -I I/C 4 4 2
MAJ 2 2 1 SRO -U MAN CTL 1 1 0
TS 0 2 2 Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1. Mark the applicant license level for each simulator operating test number.
- 2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Sc enario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instr ument/Component Failure; MAJ = Major Transient; Man. Ctrl =
Manual Control o f Automatic Function; TS = Technical Specification Evaluation ; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO -U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP
= Balance of Plan
Rev 1 ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 3 (SRO-I5, SRO-I6, RO-3)
Facility: Diablo Canyon Date of Exam: 07/15/2024 Operating Test Number: L232 A E Scenarios P V Scenario S2 - Scenario S5 - T M P E O I L N CREW T N I T POSITION CREW POSITION CREW POSITION CREW POSITION A I C L M A T S A B S A B S A B S A B U N Y R T O R T O R T O R T O M*
T P O C P O C P O C P O C P E RO I U
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I5 I/C 1,2,3,4,6 1,3,4,6 9 4 4 2
MAJ 5 5 2 2 2 1 SRO-U MAN CTL 1 1 1 1 0 TS 1,3 2 0 2 2
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I6 I/C 2,3,4,6 1,2,3,4,6 9 4 4 2
MAJ 5 5 2 2 2 1 SRO-U MAN CTL 2,3 2 1 1 0 TS 1,3 2 0 2 2
RX 0 1 1 0 RO-3 NOR 0 1 1 1 SRO-I I/C 1,2,3,4,6 2,3,4,6 9 4 4 2
MAJ 5 5 2 2 2 1 SRO-U MAN CTL 2 2 2 1 1 0 TS 0 0 2 2
RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2
MAJ 2 2 1 SRO-U MAN CTL 1 1 0 TS 0 2 2 Form3.41InstructionsfortheEventsandEvolutionsChecklist
- 1. Marktheapplicantlicenselevelforeachsimulatoroperatingtestnumber.
- 2. Forthesetofscenariocolumns,fillintheassociatedeventnumberfromForm3.31,ScenarioOutline,toshowthespecificevent typesbeingusedfortheapplicantwhileintheassignedcrewpositionforthatscenario.
- MinimumsaresubjecttotheinstructionsinSectionC.2,LicenseLevelCriteria.
KEY:RX=ReactivityManipulation;NOR=NormalEvolution;I/C=Instrument/ComponentFailure;MAJ=MajorTransient;Man.Ctrl=
ManualControlofAutomaticFunction;TS=TechnicalSpecificationEvaluation;RO=ReactorOperator;SROIorI=InstantSenior ReactorOperator;SROUorU=UpgradeSeniorReactorOperator;SRO=SeniorReactorOperator;ATC=AttheControls;andBOP
=BalanceofPlan
Rev 2
ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 4 (SRO-I7, SRO-I8, RO-4)
Facility: Diablo Canyon Date of Exam: 07/15/2024 Operating Test Number: L232 A E Scenarios P V - Scenario S4 Scenario S5 - T M P E O I L N CREW T N I T POSITION CREW POSITION CREW POSITION CREW POSITION A I C L M A T S A B S A B S A B S A B U N Y R T O R T O R T O R T O M*
T P O C P O C P O C P O C P E RO I U
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I7 I/C 1,2,3,4,7,8 1,3,4,6 10 4 4 2
MAJ 5,6 5 3 2 2 1 SRO-U MAN CTL 1 1 1 1 0 TS 1,2 2 0 2 2
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I8 I/C 2,4 1,2,3,4,6 7 4 4 2
MAJ 5,6 5 3 2 2 1 SRO-U MAN CTL 2 1 1 1 0 TS 1,3 2 0 2 2
RX 0 1 1 0 RO-4 NOR 0 1 1 1 SRO-I I/C 1,2,3,7,8 2,3,4,6 9 4 4 2
MAJ 5,6 5 3 2 2 1 SRO-U MAN CTL 3,8 2 3 1 1 0 TS 0 0 2 2
RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2
MAJ 2 2 1 SRO-U MAN CTL 1 1 0 TS 0 2 2 Form3.41InstructionsfortheEventsandEvolutionsChecklist
- 1. Marktheapplicantlicenselevelforeachsimulatoroperatingtestnumber.
- 2. Forthesetofscenariocolumns,fillintheassociatedeventnumberfromForm3.31,ScenarioOutline,toshowthespecificevent typesbeingusedfortheapplicantwhileintheassignedcrewpositionforthatscenario.
- MinimumsaresubjecttotheinstructionsinSectionC.2,LicenseLevelCriteria.
KEY:RX=ReactivityManipulation;NOR=NormalEvolution;I/C=Instrument/ComponentFailure;MAJ=MajorTransient;Man.Ctrl=
ManualControlofAutomaticFunction;TS=TechnicalSpecificationEvaluation;RO=ReactorOperator;SROIorI=InstantSenior ReactorOperator;SROUorU=UpgradeSeniorReactorOperator;SRO=SeniorReactorOperator;ATC=AttheControls;andBOP
=BalanceofPlan
Rev 3
ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 5 (SRO-U1, SRO-I9, RO-5, RO-6)
Facility: Diablo Canyon Date of Exam: 07/15/2024 Operating Test Number: L232 A E Scenarios P V Scenario S2 Scenario S4 Scenario S5 - T M P E O I L N CREW T N I T POSITION CREW POSITION CREW POSITION CREW POSITION A I C L M A T S A B S A B S A B S A B U N Y R T O R T O R T O R T O M*
T P O C P O C P O C P O C P E RO I U
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I9 I/C 1,2,3,4,6 1,2,3,4,7,8 11 4 4 2
MAJ 5 5,6 3 2 2 1 SRO-U1 MAN CTL 0 1 1 0 TS 1,3 1,2 4 0 2 2
RX 0 1 1 0 RO NOR 0 1 1 1 SRO-I9 I/C 2,3,4,6 1,2,3,4,6 9 4 4 2
MAJ 5 5 2 2 2 1 SRO-U MAN CTL 2,3 2 1 1 0 TS 1,3 2 0 2 2
RX 0 1 1 0 RO-5 NOR 0 1 1 1 SRO-I I/C 1,2,4,6 2,4 1,3,4,6 10 4 4 2
MAJ 5 5,6 5 4 2 2 1 SRO-U MAN CTL 2 2 1 3 1 1 0 TS 0 0 2 2
RX 0 1 1 0 RO-6 NOR 0 1 1 1 SRO-I I/C 1,2,3,7,8 2,3,4,6 9 4 4 2
MAJ 5,6 5 3 2 2 1 SRO-U MAN CTL 3,8 2 3 1 1 0 TS 0 0 2 2 Form3.41InstructionsfortheEventsandEvolutionsChecklist
- 1. Marktheapplicantlicenselevelforeachsimulatoroperatingtestnumber.
- 2. Forthesetofscenariocolumns,fillintheassociatedeventnumberfromForm3.31,ScenarioOutline,toshowthespecificevent typesbeingusedfortheapplicantwhileintheassignedcrewpositionforthatscenario.
- MinimumsaresubjecttotheinstructionsinSectionC.2,LicenseLevelCriteria.
KEY:RX=ReactivityManipulation;NOR=NormalEvolution;I/C=Instrument/ComponentFailure;MAJ=MajorTransient;Man.Ctrl=
ManualControlofAutomaticFunction;TS=TechnicalSpecificationEvaluation;RO=ReactorOperator;SROIorI=InstantSenior ReactorOperator;SROUorU=UpgradeSeniorReactorOperator;SRO=SeniorReactorOperator;ATC=AttheControls;andBOP
=BalanceofPlan
Rev 3
ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group N (SRO-IN, SRO-IN, RO-N)
Facility: Diablo Canyon Date of Exam: 07/15/2024 Operating Test Number: L232 A E Scenarios P V Spare - S3 - - - T M P E O I L N CREW T N I T POSITION CREW POSITION CREW POSITION CREW POSITION A I C L M A T S A B S A B S A B S A B U N Y R T O R T O R T O R T O M*
T P O C P O C P O C P O C P E RO I U
RX 1 1 0 RO NOR 1 1 1 1 SRO-IN I/C 3,4,6,7 4 4 2
MAJ 5 2 2 1 SRO-U1 MAN CTL 1 1 0 TS 2,4 0 2 2
RX 1 1 0 RO NOR 1 1 1 1 SRO-IN I/C 3,6 4 4 2
MAJ 5 2 2 1 SRO-U2 MAN CTL 6 1 1 0 TS 0 2 2
RX 1 1 0 RO-N NOR 1 1 1 1 SRO-I I/C 3,4,6,7 4 4 2
MAJ 5 2 2 1 SRO-U MAN CTL 4,6,7 1 1 0 TS 0 2 2
RX 1 1 0 RO-N NOR 1 1 1 SRO-I I/C 4 4 2
MAJ 2 2 1 SRO-U MAN CTL 1 1 0 TS 0 2 2 Form3.41InstructionsfortheEventsandEvolutionsChecklist
- 1. Marktheapplicantlicenselevelforeachsimulatoroperatingtestnumber.
- 2. Forthesetofscenariocolumns,fillintheassociatedeventnumberfromForm3.31,ScenarioOutline,toshowthespecificevent typesbeingusedfortheapplicantwhileintheassignedcrewpositionforthatscenario.
- MinimumsaresubjecttotheinstructionsinSectionC.2,LicenseLevelCriteria.
KEY:RX=ReactivityManipulation;NOR=NormalEvolution;I/C=Instrument/ComponentFailure;MAJ=MajorTransient;Man.Ctrl=
ManualControlofAutomaticFunction;TS=TechnicalSpecificationEvaluation;RO=ReactorOperator;SROIorI=InstantSenior ReactorOperator;SROUorU=UpgradeSeniorReactorOperator;SRO=SeniorReactorOperator;ATC=AttheControls;andBOP
=BalanceofPlan
Rev 1