Annual Assessment Letter for Seabrook Station (Report 05000443/2023006)
ML24053A341
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 02/28/2024
From: Matt Young
NRC/RGN-I/DORS
To: Coffey B
Florida Power & Light Co
References
IR 2023006
Download: ML24053A341 (1)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION ( REPORT 05000443/2023 006)

Dear Bob Coffey:

The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Seabrook Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light -Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Seabrook Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC w ebsite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5205 with any questions you have regarding this letter.

Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000443 License Nos. NPF-86

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV SUBJECT: ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION ( REPORT 05000443/2023 006 ) DATED FEBRUARY 28, 20 24

DISTRIBUTION:

MYoung, DORS NWarnek, DORS SElkhiamy, DORS AChristiano, DORS SBruneau, DORS TDaun, DORS, SRI EAllen, DORS, RI ACass, DORS, AA FGaskins, RI OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource MFerdas, DORS RLorson, RA DCollins, DRA BWelling, DORS RMcKinley DORS PKrohn, DRSS JZimmerman, DRSS DRSS Specialist Branch Chiefs DORS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDroIrib Resource ROPassessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-24 EOC Review/Branch 2/Seabrook/Seabrook ROP-24 Annual Assessment Letter

.docx ADAMS ACCESSION NUMBER: ML24053A341 x SUNSI Review x Non-Sensitive x Publvlle Sensitive n -Publiclyvlable

OFFICE / /

ME NWnek MYoung TE 22/2024 22/2024

OFFIAL RERD COPY

Site Inspection Activity Plan Seabrook

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

PI&R Biennial Team Inspection - Seabrook 4

1 3/4/2024 3/8/2024 IP 71152B 000747 Problem Identification and Resolution

1 3/18/2024 3/22/2024 IP 71152B 000747 Problem Identification and Resolution

EP Exercise Inspection - Seabrook 5

1 4/1/2024 4/5/2024 IP 71114.01 000716 Exercise Evaluation

1 4/1/2024 4/5/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1 4/1/2024 4/5/2024 IP 71151 001397 Performance Indicator Verification

Age Related Degradation - Seabrook 3

1 4/8/2024 4/12/2024 IP 71111.21N.04 001832 Age-Related Degradation

1 4/22/2024 4/26/2024 IP 71111.21N.04 001832 Age-Related Degradation

ISFSI Operational Inspection (60855) - SB 2

1 5/13/2024 5/17/2024 IP 60855 001001 Operation Of An ISFSI

71124.07 (REMP) 1

1 6/10/2024 6/14/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program

71124.03 & 71124.04 (Airborne & Occupational) 1

1 7/22/2024 7/26/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1 7/22/2024 7/26/2024 IP 71124.04 000728 Occupational Dose Assessment

Material Control and Accounting - Seabrook 1

1 9/9/2024 9/13/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

Inservice Inspection - Seabrook 1

1 10/14/2024 10/25/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

71124.01 IP (Rad Hazards) & 71151 (PIV) 1

1 10/14/2024 10/18/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2024 Seabrook Initial License Examination 4

1 9/29/2024 10/5/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 11/3/2024 11/8/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Access Control, Equipment Testing and Maintenance, Training, SPR, PIs - SBK 3

1 11/18/2024 11/22/2024 IP 71130.02 000734 Access Control

1 11/18/2024 11/22/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1 11/18/2024 11/22/2024 IP 71130.07 000739 Security Training

1 11/18/2024 11/22/2024 IP 71130.09 001656 Security Plan Changes

1 11/18/2024 11/22/2024 IP 71151 001338 Performance Indicator Verification

71124.08 - Waste & Transportation 1

Prepared on 2/21/2024 2:24:23 PM 1 of 2 Site Inspection Activity Plan

1 3/31/2025 4/4/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

71124.01 - RP Rad Hazard and Control 1

1 4/14/2025 4/18/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Access Control, Protective Strategy, TSR, SPR, PIs - SBK 4

1 6/2/2025 6/6/2025 IP 71130.02 000734 Access Control

1 6/2/2025 6/6/2025 IP 71130.05 000737 Protective Strategy Evaluation

1 6/2/2025 6/6/2025 IP 71130.09 001656 Security Plan Changes

1 6/2/2025 6/6/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

1 6/2/2025 6/6/2025 IP 71151 001338 Performance Indicator Verification

Cyber Security - Seabrook 4

1 6/9/2025 6/13/2025 IP 71130.10 000741 Cybersecurity

EP Program Inspection - Seabrook 2

1 8/18/2025 8/22/2025 IP 71114.02 000717 Alert and Notification System Testing

1 8/18/2025 8/22/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1 8/18/2025 8/22/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1 8/18/2025 8/22/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

1 8/18/2025 8/22/2025 IP 71151 001397 Performance Indicator Verification

Commercial Grade Dedication - Seabrook 3

1 9/15/2025 9/19/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

1 9/29/2025 10/3/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

71124.06 - RETS 1

1 9/15/2025 9/19/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

71124.05 - Rad Monitoring 1

1 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

2025 Seabrook Initial Operator Licensing Exam 4

1 9/22/2025 9/26/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 10/27/2025 10/31/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

SB Requal Inspection with P/F Results 2

1 11/10/2025 11/14/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 11/10/2025 11/14/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Prepared on 2/21/2024 2:24:23 PM 2 of 2