MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-037, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) 2024-09-25
[Table view] Category:Operating Plan
[Table view] Category:Status Report
MONTHYEARIR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2019-046, Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2019-03-25025 March 2019 Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2017-040, Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2017-03-30030 March 2017 Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2016-146, Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2016-07-26026 July 2016 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications SBK-L-16011, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-11011 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML15356A1022015-12-15015 December 2015 Final Compliance in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) SBK-L-15138, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-27027 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) SBK-L-15026, NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-27027 February 2015 NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) SBK-L-15025, NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12015-02-27027 February 2015 NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-0 SBK-L-14154, Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No EA- 12-05 1)2014-08-26026 August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No EA- 12-05 1) ML14076A0332014-03-13013 March 2014 NRC Response Letter to Don Tilbury Regarding Remarks at the December 18, 2013 Public Meeting for Seabrook Station (W/Enclosures) SBK-L-14042, Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-27027 February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) SBK-L-14041, Second Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-27027 February 2014 Second Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) SBK-L-13158, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation L-2013-103, Decommissioning Funding Status Reports2013-03-25025 March 2013 Decommissioning Funding Status Reports L-2009-055, Units 1 and 2, Decommissioning Funding Status Reports2009-03-27027 March 2009 Units 1 and 2, Decommissioning Funding Status Reports ML0613202062006-02-15015 February 2006 E-mail from D. Croulet of Entergy to Various, Regarding Monitoring Well Status - February 15, 2006-0600 SBK-L-05038, Decommissioning Funding Status Report2005-03-25025 March 2005 Decommissioning Funding Status Report ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2024-02-28
[Table view] |
Text
February 28, 2024
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION ( REPORT 05000443/2023 006)
Dear Bob Coffey:
The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Seabrook Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light -Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Seabrook Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC w ebsite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5205 with any questions you have regarding this letter.
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety
Docket Nos. 05000443 License Nos. NPF-86
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV SUBJECT: ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION ( REPORT 05000443/2023 006 ) DATED FEBRUARY 28, 20 24
DISTRIBUTION:
MYoung, DORS NWarnek, DORS SElkhiamy, DORS AChristiano, DORS SBruneau, DORS TDaun, DORS, SRI EAllen, DORS, RI ACass, DORS, AA FGaskins, RI OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource MFerdas, DORS RLorson, RA DCollins, DRA BWelling, DORS RMcKinley DORS PKrohn, DRSS JZimmerman, DRSS DRSS Specialist Branch Chiefs DORS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDroIrib Resource ROPassessment Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-24 EOC Review/Branch 2/Seabrook/Seabrook ROP-24 Annual Assessment Letter
.docx ADAMS ACCESSION NUMBER: ML24053A341 x SUNSI Review x Non-Sensitive x Publvlle Sensitive n -Publiclyvlable
OFFICE / /
ME NWnek MYoung TE 22/2024 22/2024
OFFIAL RERD COPY
Site Inspection Activity Plan Seabrook
01/01/2024 - 12/31/2025
Unit Start End Activity CAC Title Staff Count
PI&R Biennial Team Inspection - Seabrook 4
1 3/4/2024 3/8/2024 IP 71152B 000747 Problem Identification and Resolution
1 3/18/2024 3/22/2024 IP 71152B 000747 Problem Identification and Resolution
EP Exercise Inspection - Seabrook 5
1 4/1/2024 4/5/2024 IP 71114.01 000716 Exercise Evaluation
1 4/1/2024 4/5/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 4/1/2024 4/5/2024 IP 71151 001397 Performance Indicator Verification
Age Related Degradation - Seabrook 3
1 4/8/2024 4/12/2024 IP 71111.21N.04 001832 Age-Related Degradation
1 4/22/2024 4/26/2024 IP 71111.21N.04 001832 Age-Related Degradation
ISFSI Operational Inspection (60855) - SB 2
1 5/13/2024 5/17/2024 IP 60855 001001 Operation Of An ISFSI
71124.07 (REMP) 1
1 6/10/2024 6/14/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program
71124.03 & 71124.04 (Airborne & Occupational) 1
1 7/22/2024 7/26/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1 7/22/2024 7/26/2024 IP 71124.04 000728 Occupational Dose Assessment
Material Control and Accounting - Seabrook 1
1 9/9/2024 9/13/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)
Inservice Inspection - Seabrook 1
1 10/14/2024 10/25/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
71124.01 IP (Rad Hazards) & 71151 (PIV) 1
1 10/14/2024 10/18/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2024 Seabrook Initial License Examination 4
1 9/29/2024 10/5/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 11/3/2024 11/8/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Access Control, Equipment Testing and Maintenance, Training, SPR, PIs - SBK 3
1 11/18/2024 11/22/2024 IP 71130.02 000734 Access Control
1 11/18/2024 11/22/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1 11/18/2024 11/22/2024 IP 71130.07 000739 Security Training
1 11/18/2024 11/22/2024 IP 71130.09 001656 Security Plan Changes
1 11/18/2024 11/22/2024 IP 71151 001338 Performance Indicator Verification
71124.08 - Waste & Transportation 1
Prepared on 2/21/2024 2:24:23 PM 1 of 2 Site Inspection Activity Plan
1 3/31/2025 4/4/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
71124.01 - RP Rad Hazard and Control 1
1 4/14/2025 4/18/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
Access Control, Protective Strategy, TSR, SPR, PIs - SBK 4
1 6/2/2025 6/6/2025 IP 71130.02 000734 Access Control
1 6/2/2025 6/6/2025 IP 71130.05 000737 Protective Strategy Evaluation
1 6/2/2025 6/6/2025 IP 71130.09 001656 Security Plan Changes
1 6/2/2025 6/6/2025 IP 71130.14 000743 Review of Power Reactor Target Sets
1 6/2/2025 6/6/2025 IP 71151 001338 Performance Indicator Verification
Cyber Security - Seabrook 4
1 6/9/2025 6/13/2025 IP 71130.10 000741 Cybersecurity
EP Program Inspection - Seabrook 2
1 8/18/2025 8/22/2025 IP 71114.02 000717 Alert and Notification System Testing
1 8/18/2025 8/22/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1 8/18/2025 8/22/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 8/18/2025 8/22/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
1 8/18/2025 8/22/2025 IP 71151 001397 Performance Indicator Verification
Commercial Grade Dedication - Seabrook 3
1 9/15/2025 9/19/2025 IP 71111.21N.03 001808 Commercial Grade Dedication
1 9/29/2025 10/3/2025 IP 71111.21N.03 001808 Commercial Grade Dedication
71124.06 - RETS 1
1 9/15/2025 9/19/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
71124.05 - Rad Monitoring 1
1 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
2025 Seabrook Initial Operator Licensing Exam 4
1 9/22/2025 9/26/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 10/27/2025 10/31/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
SB Requal Inspection with P/F Results 2
1 11/10/2025 11/14/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 11/10/2025 11/14/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
Prepared on 2/21/2024 2:24:23 PM 2 of 2