ML24066A012

From kanterella
Revision as of 13:35, 5 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024
ML24066A012
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/06/2024
From: April Nguyen
NRC/RGN-III/DORS/OB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Nance J.
Shared Package
ML22251A193 List:
References
Download: ML24066A012 (1)


Text

David Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL BRAIDWOOD STATION, UNITS 1 AND 2, MARCH 2024

Dear David Rhoades:

The purpose of this letter is to provide U.S. Nuclear Regulatory Commission (NRC) approval of the proposed written examination and operating test under Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(4) and to confirm the final arrangements for the upcoming operator licensing examination at Braidwood Station.

The NRC has approved the subject examinations, and you may administer the written examination during the week of March 25, 2024, in accordance with Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRC staff will administer the operating test during the week of March 18, 2024. The NRC has provided the list of the applicants approved to take the examinations to Victoria Ferguson, Senior Manager Site Training. The examinations have undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examinations meet the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering the written examination, you also agree that the examinations meet NUREG-1021 guidelines and are appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that these examinations are not appropriate for licensing operators at your facility, do not administer the written examination and contact me at 630-829-9587.March 6, 2024 D. Rhoades 2 Please contact your NRC chief examiner, Jim Nance, at 630-829-9678, if you have questions or identify any errors or changes in the license level (reactor operator or senior reactor operator) or type of examination (partial or complete written examination or operating test, or both) specified for each applicant approved to take the examinations.

Sincerely, April M. Nguyen, Chief Operations Branch Division of Operating Reactor Safety Docket Nos. 50-456; 50-457 cc: Distribution via LISTSERV Victoria Ferguson, Senior Manager Site Training Signed by Nguyen, April on 03/06/24

D. Rhoades 3

Letter to David Rhoades from April M. Nguyen dated March 6, 2024.

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL BRAIDWOOD STATION, UNITS 1 AND 2, MARCH 2024

DISTRIBUTION:

Farrah Gaskins RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Diana Betancourt-Roldan Allan Barker David Curtis R3-DORS Ikeda Betts Maryia Bahdanovich-Kniazkova

ADAMS Accession Number: ML24066A012 OFFICE RIII/DORS/OB:CE RIII/DORS/OB:BC NAME JNance:gmp ANguyen DATE 3/06/2024 3/06/2024 OFFICIAL RECORD COPY