Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2
ML24274A082
Person / Time
Site: Oyster Creek
Issue date: 09/25/2024
From: Noval W
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
HDI-DOC-24-035
Download: ML24274A082 (1)


Text

SAFEGUARDS INFORMATION

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104.

HOLTE C -----------,--;._;:___.;:___ ______ ~---

oecoMM1ss10N1Nc Telephone (856) 797-0900 INTERNATl6NA1

. Fax (856) 797-0909

10 CFR 50.54(p) 10 CFR 50.4(b)(4)

September 25, 2024

ATTN: Document Control Desk U.~. Nuclear Regulatory Commission Washington, DC 20555-0001

Oyster.Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 Docket Nos. 50-219 and 72-15

Subject:

Oyster Creek Independent Spent Fuel Storage Installation Security Plan, training Qualification Plan, Safeguards Contingency Plan, Revisions 1. and 2

Dear Sir or Madam:

Pursuant to the provisions of 1 O Code of Federal Regulations {CFR) 50.4, 1 O CFR 50.54(p ), 1 O CFR 73.55(r), and 10 CFR 50.90, Holtec Decorimiissioning International, LLC (HDI) is svbmitting Revision 2 to the Independent Spent Fuel Storage Installation Only (ISFSIO) Security Plan.

(Security Plan). The changes to the ISFSIO Security Plan Revision 2 were implemented September 24, 2024. Additionally, Revision 1 of the Security Plan was implemented on August 1, 2024. In accordance with 1 O CFR 50.54(p)(2), HDI is submitting this change within 60 days of implementation of Revision 1 and Revision 2 (s1,1bmiss;on required no later than September 30, 2024).,

The ISFSIO Security Plan was revised as follows:

1. Provide updated Aerial Photos of the facility. (Revision 1)
2. The Owner Controlled Area (OCA) is red.efined. (Revision 1) 3.* Change to reference Code of Federal Regulations as. it!pertains to reportability. (Revision 2)

The revised ISFSIO Security Plan Revisions 1 and 2 change packages are attachments to this letter. The attachments include de.tails of the changes, 50.54(p) review and other change supporting documents..

  • The attachments to this submittal contain "Safeguards Information" as defined by 10 CFR 73.22 and its disclosure to unauthorized individuais is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended, and must be protected accordingly. S O b /

This letter contains no new regulatory commitments.

SAFEGUA..RDS INFORMATION {\\)H 55 z (.,o

NOTE: WHEN SEPARATED FROM SAFEGUARDS INFORMATION ATTACHMENT(S), THIS DOCUMENT IS DECONTROLLED AND THE TRANS MITT AL DOCUMENT DOES NOT OTHERWISE WARRANT PROTECTION FROM UNAUTHORIZED DISCLOSURE"*

HDI-OC-24-035 Page 1 of2 SAFEGUARDS INFORMATION

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 HOLTE C -------------------------

0EcoMM1ss1ON1Nc Telephone (856) 797-0900 INTfRNAl IONAI Fax (856) 797-0909

If you have any questions or need further information, please contact the Holtec Decommissioning International LLC, Security Decommissioning Manager Thomas G. Miller Jr at (609) 312-1436 or Site Security Manager, Joseph Dwyer at (609) 971-2115.

Sincerely,

Dlg!tally signed by William Noval William DN: cn=WJlllam Naval, c=US, o=HDI, ou=Regulatory Affa!rs, emaU=w.noval@holtec.com Naval Date: 2024.09.25 09:22:25 -04'00' William Noval Director, Regulatory Affairs Holtec Decommissioning International, LLC

Attachment:

1 ). Independent Spent Fuel Installation Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revision 1 (Contains Safeguards Information)

2). Independent Spent Fuel Installation Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revision 2 (Contains Safeguards Information)

cc: * (without Attachment)

USNRC Regional Administrator, Region I USN RC Project Manager, NMSS - Oyster Creek Nuclear Generating Station USN RC Region I, Lead Inspector:.. Oyster Creek Nuclear Generating Station Assistant Commissioner, Air Quality, Energy and Sustainability, NJ DEP Assistant Director Radiation Protection Element, NJ Bureau of Nuclear Engineering

SAFEGUARDS.INFORMATION NOTE: WHEN SEPARATED FROM SAFEGUARDS INFORMATION ATTACHMENT(S), THIS DOCUMENT JS DECONTROLLED AND THE TRANSMITTAL DOCUMENT DOES NOT OTHERWISE WARRANT PROTECTION FROM UNAUTHORIZED DISCLOSURE" HDI-OC-24-035 Page 2 of2