ML20108E871

From kanterella
Revision as of 15:35, 22 October 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NAC-MPC Biennial FSAR Update and Associated 10 CPR 72.48 Determination Summary Report
ML20108E871
Person / Time
Site: 07201025
Issue date: 04/09/2020
From: Fowler W
NAC International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
ED20200027
Download: ML20108E871 (1)


Text

Atlanta Corporate Headquarters

  • 3930 East Jones Bridge Road, Suite 200 NAC A

i INTERNATIONAL Peachtree Corners, GA 30092 Phone 770-447-1144 www.nacintl.com April 9, 2020 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Attn: Document Control Desk

Subject:

NAC-MPC Biennial FSAR Update and Associated 10 CPR 72.48 Determination Summary Report Docket No. 72-1025

References:

1. ED2019023, NAC-MPC Biennial FSAR Update and Associated 10 CPR
  • 72.48 Determination Summary Report, April 1, 2019 (FSAR Revision 12)
2. NRC Letter, Amendment No. 7 and 8 to Certificate of Compliance No, 1025 for the NAC-Multi Purpose Canister Storage System, February 5, 2019 In accordance with the requirements of 10 CPR 72.248, NAC International (NAC) hereby notifies the U.S. Nuclear Regulatory Commission (NRC) that no changes to the FSAR have been made since the submission of Reference 1. Per 10 CPR Part 72, each biennial update is to include a 10 CPR 72.48 Determination Summary Report and a Certification of Accuracy for the updated FSAR. Since no 72.48 evaluations and FSAR changes have occurred during this reporting period (April 10, 2019 through April 9, 2020), an updated FSAR, 10 CPR 72.48 Determination Summary Report and an FSAR Certification of Accuracy is not necessary for this biennial update.

NAC submitted its biennial update in two parts. The first part occurring on April 1, 2019 (Reference 1) which covered April 11, 2018 through April 1, 2019. The second part submitted herein and covers the period of April 1, 2019 through April 9, 2020. These two submittals satisfy the requirements for the 10 CPR 72.48 biennial update.

If you have any comments or questions regarding this submission, please contact me on my direct line at 678-328-1236.

Wren Fowler Director, Licensing Engineering ED20200027