ML20059L320
From kanterella
ML20059L320 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 11/24/1993 |
From: | Greeves J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
To: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
References | |
NUDOCS 9402040043 | |
Download: ML20059L320 (5) | |
Similar Documents at Peach Bottom | |
---|---|
Category:GRANTS OF EXEMPTION FROM & EXTENSION TO NRC REQUIREME
MONTHYEARML20249B9981998-06-22022 June 1998
[Table view]Exemption from Requirements of 10CFR70.24 Re Criticality Accident Requirements. Exemption Authorized ML20083C1191995-04-25025 April 1995 Exemption from Requirements of Sections III.D.2(a) & III.D.3 of App J to 10CFR50,which Requires That Type B & C Tests Be Performed During Each Reactor Shutdown for Refueling ML20078P9331994-12-0707 December 1994 Exemption Granted from Requirements of 10CFR73.55 Re Returning of Picture Badges Upon Exit from Protected Area Such That Individuals Not Employed by Licensee May Take Picture Badges Offsite ML20073H9821994-09-30030 September 1994 Exemption Granted from Requirements of 10CFR50,App J, Section III.D.1(a) to Perform Type a Tests at Approx Equal Intervals & within 10-yr Svc Period ML20071H0521994-07-0505 July 1994 Exemption from Application of 10CFR50,App J,Sections III.D.2(a) & III.D.3,extending Testing Intervals to Allow Testing to Be Performed During Unit 2 Cycle 10 Refueling Outage ML20059L3201993-11-24024 November 1993 Exemption from Training Requirements of 10CFR50.120 Re Establishment,Implementation & Maintenance of Training Program ML20086U1571991-12-26026 December 1991 Exemption Granting One Time Schedular Exemption to Eight SROs Limited to Fuel Handling,To Take First Annual Requalification Operating Test During Jan 1992 Instead of End of 1991 ML20206L6081988-11-18018 November 1988 Exemption from Schedular Requirements of 10CFR50.54(w) Re Property Insurance Required to Be Carried by Reactor Licensees ML20207H7981986-12-31031 December 1986 Exemption from Requirements of 10CFR50,App R Sections III.G.2.a & III.G.2.b Re Dampers,Structural Steel & Automatic Fire Suppression ML20214D0681986-11-14014 November 1986 Exemption from Requirements of Sections Iii.F & Iii.M of 10CFR50,App R Re Penetration Seals & Fire Detection ML20100A4341985-03-13013 March 1985 Exemption from Sections Iii.F & Iii.G of App R to 10CFR50 Re Installation of Automatic Fire Detection Sys & Cables & Equipment Necessary to Achieve & Maintain Safe Shutdown ML20052F9031982-05-0404 May 1982 Notification of Exemption from Schedular Requirements of Fire Protection rule,10CFR50.48(c),App R,Subsection Iii.G ML20040F2221982-01-13013 January 1982 Exemption from Implementation Requirements for Sprinkler Sys in Recirculation Pump Motor Generator,Early Warning Detection Sys,Breathing Air Bottle Charging Sys & Electrical Supervision of Fire Doors 1998-06-22 Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS MONTHYEARML20153G3141998-06-29029 June 1998
[Table view]Transcript of 980629 Public Meeting Re Peach Bottom Unit 1, Decommissioning Status in Delta,Pa.Pp 1-65.Reporter Certificate Encl ML20249B9981998-06-22022 June 1998 Exemption from Requirements of 10CFR70.24 Re Criticality Accident Requirements. Exemption Authorized ML20247M8801998-05-19019 May 1998 Confirmatory Order Modifying Licenses Effective Immediately. PECO Energy Co Shall Complete Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Peach Bottom Atomic Power Station,Units 2 & 3 ML20216G0321998-03-0404 March 1998 Comment Re Draft RG DG-1071, Std Format & Content for Post- Shutdown Decommissioning Activities Rept. Recommends That Draft RG Be Revised to Accommodate Situations Similar to That Described for Unit 1 ML20198J0931997-12-18018 December 1997 Order Approving Application Re Merger Between Atlantic Energy Inc,& Delmarva Power & Light Co ML20113C6631996-06-24024 June 1996 Comments on Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20115H7061996-06-0404 June 1996 Submits Addl Info to Support Petition for Rulemaking PRM-72-3 Re Amend to SAR ML20083N3971995-04-26026 April 1995 Comment Supporting Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20083C1191995-04-25025 April 1995 Exemption from Requirements of Sections III.D.2(a) & III.D.3 of App J to 10CFR50,which Requires That Type B & C Tests Be Performed During Each Reactor Shutdown for Refueling ML20081B3811995-03-0101 March 1995 Comment Supporting Proposed Suppl 5 to GL 88-20, IPEEE for Severe Accident Vulnerabilities ML20078P9331994-12-0707 December 1994 Exemption Granted from Requirements of 10CFR73.55 Re Returning of Picture Badges Upon Exit from Protected Area Such That Individuals Not Employed by Licensee May Take Picture Badges Offsite ML20073H9821994-09-30030 September 1994 Exemption Granted from Requirements of 10CFR50,App J, Section III.D.1(a) to Perform Type a Tests at Approx Equal Intervals & within 10-yr Svc Period ML20071H0521994-07-0505 July 1994 Exemption from Application of 10CFR50,App J,Sections III.D.2(a) & III.D.3,extending Testing Intervals to Allow Testing to Be Performed During Unit 2 Cycle 10 Refueling Outage ML20059L3201993-11-24024 November 1993 Exemption from Training Requirements of 10CFR50.120 Re Establishment,Implementation & Maintenance of Training Program ML20126F2721992-12-21021 December 1992 Comment Endorsing Positions & Comments of NUMARC & BWROG Re Draft GL, Augmented Inservice Insp Requirments for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys ML20086U1571991-12-26026 December 1991 Exemption Granting One Time Schedular Exemption to Eight SROs Limited to Fuel Handling,To Take First Annual Requalification Operating Test During Jan 1992 Instead of End of 1991 ML20006D3821990-02-0606 February 1990 Comment on Proposed Rule 10CFR2 Re Policy & Procedures for Enforcement Actions;Policy Statement.Util Uncertain as to Whether Changes Necessary ML20006A7871989-08-0707 August 1989 Comment on NUREG-1150, Severe Accident Risks:Assessment for Five Us Nuclear Power Plants. Notes Numerous Places in Rept Where Conclusions Stated or Implied Which Conflict W/Results of Previous Analyses ML20247B6151989-07-19019 July 1989 Memorandum & Order.* Grants Commonwealth of PA Motion Requesting Order Confirming Commonwealth Withdrawal of Petition to Intervene & Proposed Contentions & Terminating Proceeding.W/Certificate of Svc.Served on 890720 ML20246N8071989-06-30030 June 1989 NRC Staff Fourth Status Rept Re Settlement Agreement.* NRC Responded to Agreement,Per Encl ,Advising Licensee That NRC Has No Objection to Agreement Between Licensee & Commonwealth of Pa.W/Certificate of Svc ML20246P2951989-06-29029 June 1989 Notice of Withdrawal & Motion to Terminate Proceeding.* Withdraws 880122 Petition to Intervene & Requests Termination of Proceeding,Per Agreement Between Parties Re Licensee Commitment to Take Actions.W/Certificate of Svc ML20248B4631989-06-0101 June 1989 NRC Staff Third Status Rept Re Settlement Agreement.* Final Agreement Being Prepared,Per 890428 Meeting Resolving Outstanding Issues.W/Certificate of Svc ML20245J2331989-04-28028 April 1989 NRC Staff Second Status Rept Re Settlement Agreement.* Next Status Rept Will Be Filed by 890601.Certificate of Svc Encl ML20247B0641989-04-17017 April 1989 Transcript of 890417 Discussion/Possible Vote in Rockville, MD Re Plant Restart.Pp 1-64.Viewgraphs Encl ML20247A2971989-04-0404 April 1989 Comment Supporting Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20246P6921989-04-0404 April 1989 Requests Party Brief on Support of Appeal of Denial of FOIA Request Re Records of Investigation Into Events Surrounding 870331 Shutdown of Plant ML20248F5411989-03-31031 March 1989 NRC Staff Status Rept Concerning Settlement Agreement.* NRC Informed Commonwealth of PA & Util of Certain Concerns Noted in Review of Settlement Documents Forwarded by .W/Certificate of Svc ML20247A8861989-03-27027 March 1989 Memorandum & Order.* Stays Util Obligation to Respond to Contentions,Per Ongoing Settlement Discussions Between Util & Commonwealth of Pa.Monthly Status Rept Requested.W/ Certificate of Svc.Served on 890327 ML20247A6541989-03-24024 March 1989 Philadelphia Electric Co consented-to Motion to Stay Responses to Commonwealth of PA Proposed Contentions.* Requests That ASLB Stay Util Obligation to Respond to Commonwealth of PA 880824 Contentions.W/Certificate of Svc ML20236B4551989-03-0808 March 1989 Transcript of ACRS GE Reactor Plants Subcommittee 890308 Meeting in Bethesda,Md Re Peach Bottom Restart.Pp 1-129 ML20236B4001989-03-0808 March 1989 Transcript of ACRS GE Reactor Plants Subcommittee 890308 Meeting in Bethesda,Md Re Plant Restart.Pp 130-280. Supporting Documentation Encl ML20235N2611989-02-21021 February 1989 Philadelphia Electric Co consented-to Motion for 30-day Extension to Respond to Commonwealth of PA Contentions.* Requests That Deadline for Response & NRC Response to 880824 Contentions Be Extended by 30 Days.W/Certificate of Svc ML20235J5451989-02-0606 February 1989 Transcript of 890206 Briefing in Rockville,Md Re Status of Plant.Pp 1-49.Supporting Info Encl ML20206L6081988-11-18018 November 1988 Exemption from Schedular Requirements of 10CFR50.54(w) Re Property Insurance Required to Be Carried by Reactor Licensees ML20205R4041988-11-0404 November 1988 Order.* Grants Applicant 881103 Unopposed Motion for 45-day Extension of Time to Respond to Commonwealth of PA Contentions.Served on 881107 ML20205R8161988-11-0303 November 1988 PECO consented-to Motion for 45-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20205Q2061988-10-28028 October 1988 Comment Opposing Petition for Rulemaking PRM 50-52 Re Exemption of Financial Qualifications of Applicants from Review of OL Applications.Petition Presents No Compelling Reason to Amend Current Rules ML20195E6501988-10-24024 October 1988 Comment Supporting Petition for Rulemaking PRM 50-52 Re NRC Reinstatement of Financial Qualifications of Util as Consideration in Operating Licensing Hearings for Electric Utils ML20155F1681988-10-0505 October 1988 Transcript of 881005 Public Meeting in Rockville,Md Re Status of Plant.Pp 1-56.Viewgraphs & Notes Encl ML20155E8931988-10-0303 October 1988 Comment on Proposed Rule 10CFR50.54(w)(5)(i) Re Amending Implementation Schedule for Stabilization & Decontamination Priority & Trusteeship Provisions of Property Insurance Regulations.Nrc Initiated Exemptions Expected Before 881004 ML20154R6491988-09-25025 September 1988 Requests Extension of Comment Period on Proposed Rule 10CFR52 Re Reactor Licensing ML20153H6781988-09-0202 September 1988 Order.* Grants Applicant Unopposed Motion for 60-day Extension of Time to Respond to Commonwealth of PA Contentions.Nrc Also Granted Extension of Time.Served on 880906 ML20153H6901988-09-0101 September 1988 Philadelphia Electric Co Consented to Motion for 60-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20153D0451988-08-24024 August 1988 Supplement to Petition & Statement of Contentions of Commonwealth of Pa.* Requests That Board Grant Petition to Intervene & Request for Hearing on Contentions.Certificate of Svc Encl ML20151U7821988-08-10010 August 1988 Order Modifying License DPR-44,DPR-56,NPF-39 & CPPR-107 for Violations Involving Licensed Operators Sleeping in Control Room,Reading Matls Not Directly Job Related & Otherwise Inattentive to Obligations of License ML20247N7531988-07-28028 July 1988 Petition for Rulemaking PRM-50-53 Requesting NRC Action to Review Undue Risk Posed by BWR Thermal Hydraulic Instability.Nrr Should Issue Order Requiring All GE BWRs to Be Placed in Cold Shutdown for Stated Reasons ML20151G0031988-07-19019 July 1988 Comment on Proposed Rule 10CFR50 Re Cooperation W/States at Commercial Nuclear Power Plants & Other Facilities. Suggests Rev to Policy to Grant Same Rights & Responsibilities to All States within 10 Miles of Plant ML20195D1681988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Commonwealth of PA Requests That Board Grant Addl Extension of Time Until 880824 for Filing of Contentions.Granted for Licensing Board.Served on 880621 ML20196B4521988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Granting of Addl Extension of Time of 60 Days Until 880824 for Filing of Contentions in Matter Requested. W/Certificate of Svc ML20196B9211988-06-0808 June 1988 Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations 1998-06-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20059L320&oldid=3558117"