ML21137A219

From kanterella
Revision as of 19:53, 17 April 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ES-301-2
ML21137A219
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/18/2021
From: Gregory Roach
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Roach G
Shared Package
ML20136A251 List:
References
L-20-236
Download: ML21137A219 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Nuclear Power Station Date of Examination: 2/1/2021 to 2/5/2021 Exam Level: RO SRO(I) SRO(U) Operating Test No.: DB1LOT21 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)

Safety System / JPM Title Type Code*

Function A, D, E, EN, S1 006 / Establish long term boron dilution (006 A4.07) 2 L

S2 061 / Initiate and Isolate SFRCS and perform actions for an AFW A, N, E, L 4S Pump Trip (061 A2.04)

S3 012 / Place all four RPS Channels in Shutdown Bypass (012 A4.03) D, L 7 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

Safety System / JPM Title Type Code*

Function P1 064 / Energizing SBODG Auxiliaries (064 A2.12) A, E, D 6 P2 068 / Complete Primary RO Actions outside CTRM for Serious CTRM D, R 8 Fire (068 AA1.21)

@ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / > 1 (control room system)

(L)ow-power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3/ 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator NUREG-1021, Revision 11 Rev 1