Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor
ML22311A553
Person / Time
Site: Hermes
Issue date: 11/16/2022
From: Benjamin Beasley, Peyton Doub, Tami Dozier
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
To:
References
Download: ML22311A553 (19)


Text

DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE KAIROS HERMES TEST REACTOR Wednesday, November 16, 2022 Tamsen Dozier, Environmental Project Manager Peyton Doub, Technical Lead of Environmental impact Statement Ben Beasley, Lead Safety Project Manager 1

Nuclear Regulatory Commission

  • The NRC is an Independent Federal Agency
  • Over 40 years of experience regulating all civilian use of nuclear materials, including power and non-power reactors
  • Mission: To protect public health and safety, promote common defense and security, and protect the environment 2

Purposes of this Meeting

  • Describe the NRC review process
  • Share with you the NRC staffs preliminary findings and recommendation from the environmental review.
  • Describe how you can provide comments during the comment period
  • Listen to and gather your comments 3

Proposed Hermes Site (Source: Hermes PSAR Ch 2) 185-acre site in East Tennessee Technology Park in the city of Oak Ridge 4

Proposed Hermes Site (Source: Kairos Jan 21,2021 ML21021A364)

Utilizes land formerly occupied by Oak Ridge Gaseous Diffusion Plant Buildings K-33 and K-31 5

Construction Permit

  • NRC authorization for an applicant to proceed with construction of a nuclear facility
  • An additional application and NRC review of a final design is needed for an Operating License that approves operation of the facility
  • There are two aspects of the NRCs review of the Kairos Hermes Non-Power Test Reactor application - safety and environmental 6

Test Reactor Construction Permit NRC Review Process ACRS ACRS Review Letter Safety Safety Evaluation Review Report Construction Pre-Application Commission Permit Activities Hearing Decision on Application Application Environmental Scoping Draft Comments Final Review Activities EIS On Draft EIS Public ACRS: Advisory Committee on Reactor Safeguards Participation 7 EIS: Environmental Impact Statement

The Kairos Hermes Facility (Source: Kairos Power)

(Source: Kairos Public Meeting Presentation, January 2021)

  • Non-power test reactor (35 megawatts-thermal) demonstrating key technologies of Kairos Power Fluoride Salt-Cooled, High Temperature Reactor for future commercial deployment
  • Reactor fuel: high assay low-enriched uranium (HALEU) in tri-structural isotropic (TRISO) particles embedded in a graphite pebble
  • Reactor coolant: molten salt of lithium fluoride and beryllium fluoride (Flibe)
  • Reactor moderator and reflector: graphite
  • Reactor is compact in size (~10 ft diameter, ~16 ft height)
  • Low pressure, large thermal inertia, slow transient response, TRISO and Flibe retention of radionuclides, and other features to ensure safety 8

NRC Safety Review Process

  • The NRC staff performs test and research reactor (i.e., non-power reactor) safety reviews in accordance with guidance in NUREG-1537, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors.
  • Areas of review for a Construction Permit Application include (partial list):

- Facility site characteristics

- Preliminary facility design

- Preliminary analyses of facility operation and possible accidents

- Quality assurance

  • Kairos submitted its Hermes Construction Permit Application in September and October 2021 (2 parts); NRC accepted the application for review and began its detailed review of the application in November 2021.
  • To clearly document its safety findings, and support an open and transparent process, the NRC staff safety review is summarized in a Safety Evaluation Report.
  • The NRC staff currently expects to complete its Safety Evaluation Report in summer of 2023.

9

Environmental Review

  • NRC systematic approach per National Environmental Policy Act (NEPA)
  • Test reactor requires the preparation of an Environmental Impact Statement (EIS)
  • Evaluates environmental impacts of construction, operation and decommissioning of a proposed nuclear facility 10

Environmental Review Schedule Notice of Intent to

  • Published Federal Register notice Conduct Scoping and on February 18, 2022 NRCs NEPA Process Prepare EIS
  • Scoping period from February 18 to Scoping Process April 19, 2022 Notice of Availability
  • EPA Issued Notice of Availability on of Draft EIS October 7, 2022 Public Comments on
  • Comment period on the Draft EIS Draft EIS from October 7 to December 6, 2022 (60 days)

Notice of Availability of Final EIS

  • Final EIS expected to be published in summer 2023 11

Resource Areas Meteorology and Air Quality Fuel Cycle/

Radiation Socioeconomics/ Waste/

Protection Environmental Justice Accident Analysis Terrestrial Land Use Aquatic Ecology Ecology Archaeology/ Hydrologic Sciences Alternative Sites Cultural Resources (Surface and Groundwater)/

Water Use and Quality Source U.S. NRC 12

How Impacts Are Expressed

  • Environmental impacts assessed in each relevant resource area
  • NRC has established three levels of impact:

- SMALL: Effect is not detectable, or so minor it will neither destabilize nor noticeably alter any important attribute of the resource.

- MODERATE: Effect is sufficient to alter noticeably, but not destabilize, important attributes of the resource.

- LARGE: Effect is clearly noticeable and sufficient to destabilize important attributes of the resource.

13

Environmental Impacts of the Hermes Test Reactor Project

  • EIS considers Direct, Indirect, and Cumulative Impacts.
  • All environmental impacts determined to be SMALL.
  • Small project with low resource usage.
  • Existing industrial park served by existing roads and utilities.
  • No surface water withdrawals or discharges.
  • Confined to previously disturbed industrial lands lacking sensitive ecological or cultural resources.
  • BMPs for erosion control, stormwater, fugitive dust.
  • Compliance with all health and safety regulations.
  • Low waste generation.
  • Meets NRC requirements for postulated accidents. 14

Alternatives Analysis

  • Systematic Process used to identify Range of Reasonable Alternatives meeting the Purpose & Need: to demonstrate Kairos Power Fluoride Salt-Cooled High Temperature Reactor technology
  • No-action Alternative: evaluated in detail
  • Fuel and Technology Alternatives: Test Reactor for a specific technology - no such alternatives meet Purpose & Need
  • Site alternatives: Two identified for detailed evaluation

- Proposed Action (Oak Ridge, TN)

- Eagle Rock Alternative Site (Idaho Falls, ID)

  • No sensitive resources disturbed - no need to consider alternative layouts 15

Alternatives Analysis Resource No Action Proposed Action Alternative Action (Oak Ridge Site) (Eagle Rock Site)

Land Use and Visual SMALL SMALL MODERATE Resources Air Quality and Noise SMALL SMALL SMALL Geological SMALL SMALL SMALL Environmental and Water Resources Ecological Resources SMALL SMALL MODERATE Historic and Cultural SMALL SMALL MODERATE Resources Socioeconomics SMALL SMALL SMALL Environmental SMALL SMALL SMALL Justice Human Health SMALL SMALL SMALL Nonradiological SMALL SMALL SMALL Waste Fuel Cycle and SMALL SMALL SMALL Radiological Waste Management Transportation SMALL SMALL SMALL Accidents SMALL SMALL SMALL No Environmentally Preferrable Sites No Obviously Superior Sites 16

Preliminary Recommendation The NRC staffs preliminary recommendation to the Commission from the environmental review is that the Construction Permit be issued. This recommendation is based on:

- information in Kairos CP application;

- communications with Federal, State, Tribal, and Local agency officials;

- the staffs independent review;

- public scoping comments; and

- assessments summarized in the draft EIS

- The staffs determination that there are no environmentally preferrable sites to the proposed site.

17

Access to the Draft EIS or Additional Information Tamsen Dozier, Environmental Project Manager Telephone: (800) 368-5642, ext. 2272 E-mail: Tamsen.Dozier@nrc.gov Peyton Doub, Environmental Project Manager Telephone: (800) 368-5642, ext. 6703 E-mail: Peyton.Doub@nrc.gov https://www.nrc.gov/reactors/non-power/kairos-hermes.html Oak Ridge Public Library 1401 Oak Ridge Turnpike Oak Ridge, TN 37830 18

Submitting Comments Speaking today at this meeting KairosHermes-CPEIS@nrc.gov Office of Administration Mailstop TWFN-07-A60 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 COMMENTS ARE DUE BY December 6, 2022 19