ML23117A049

From kanterella
Jump to navigation Jump to search
Enclosure 1 - Presentation Slides for the May 3, 2023 ACRS Meeting
ML23117A049
Person / Time
Site: Hermes
Issue date: 04/27/2023
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23117A047 List:
References
KP-NRC-2304-009
Download: ML23117A049 (1)


Text

KP-NRC-2304-009 Enclosure 1 Presentation Slides for the May 3, 2023 ACRS Meeting (Non-Proprietary)

Hermes PSAR Overview DREW PEEBLES - SENIOR LICENSING MANAGER ACRS FULL COMMITTEE MEETING M AY 3 , 2 0 2 3 Copyright © 2023 Kairos Power LLC. All Rights Reserved.

1 No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

Kairos Powers mission is to enable the worlds transition to clean energy, with the ultimate goal of dramatically improving peoples quality of life while protecting the environment.

Copyright © 2023 Kairos Power LLC. All Rights Reserved.

No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

Overview of Kairos Power Kairos Power Headquarters

  • Nuclear energy engineering, design and manufacturing company singularly focused on the commercialization of the fluoride salt-cooled high-temperature reactor (FHR)

Founded in 2016 Current Staffing:

Over 300 Employees (and growing)

~90% Engineering Staff

  • Private funding commitment to engineering design and licensing program and physical demonstration through nuclear and non-nuclear technology development program Kairos Power Team
  • Schedule driven by the goal for U.S. commercial demonstration by 2031 (or earlier) to enable rapid deployment in 2030s
  • Cost targets set to be competitive with natural gas in the U.S. electricity market Copyright © 2023 Kairos Power LLC. All Rights Reserved.

3 No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

Hermes Overview

  • The purpose of Hermes is to test and demonstrate the key technologies, design features, and safety functions for KP-FHR technology
  • 35 MWth non-power reactor facility, 4-year licensed lifetime
  • Located in Oak Ridge, Tennessee at the East Tennessee Technology Park (Former site of Oak Ridge Gaseous Diffusion Plant)
  • Research and development programs to resolve safety questions will be resolved before the completion of construction
  • Hermes is a single unit reactor that does not share any systems or equipment to perform safety functions Copyright © 2023 Kairos Power LLC. All Rights Reserved.

4 No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

Hermes PSAR Overview

  • 10 CFR 50 Licensing Pathway Construction Permit Application - Submitted Fall 2021 Environmental Report Preliminary Safety Analysis Report (PSAR)

Next Licensing Step: Operating License Application Final Safety Analysis Report (FSAR)

  • Hermes PSAR Application Format and Content Developed using guidance in NUREG-1537 Presents preliminary design and preliminary safety analysis consistent with 10 CFR 50.34(a)

PSAR does not request commission approval of the safety of any design feature or specification 10 CFR 50.35(b) A construction permit will constitute an authorization to the applicant to proceed with construction but will not constitute Commission approval of the safety of any design feature or specification unless the applicant specifically requests such approval and such approval is incorporated in the permit.

Copyright © 2023 Kairos Power LLC. All Rights Reserved.

5 No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

  • Not Applicable to Hermes -

Chapter has no technical content Hermes PSAR Format ** Minimal Content at PSAR

  • Chapter 1 - The Facility
  • Chapter 10 - Experimental Facilities and Utilization*
  • Chapter 2 - Site Characteristics
  • Chapter 11 - Radiation Protection Program and Waste Management**
  • Chapter 3 - Design of Structures, Systems, and Components
  • Chapter 12 - Conduct of Operations**
  • Chapter 4 - Reactor Description
  • Chapter 13 - Accident Analysis
  • Chapter 5 - Heat Transport System
  • Chapter 14 - Technical Specifications**
  • Chapter 6 - Engineered Safety Features
  • Chapter 15 - Financial Qualifications**
  • Chapter 7 - Instrumentation and
  • Chapter 16 - Other License Considerations*

Control Systems

  • Chapter 17 - Decommissioning and Possession-only
  • Chapter 8 - Electric Power Systems License Amendments*
  • Chapter 9 - Auxiliary Systems
  • Chapter 18 - Highly Enriched to Low Enriched Uranium Conversion*

Copyright © 2023 Kairos Power LLC. All Rights Reserved.

6 No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

Kairos Power Reports Referenced in PSAR

  • Topical Reports
  • Technical Reports
  • KP-TR-003 - Principal Design Criteria
  • KP-TR-017 - Core Design Methodology
  • KP-TR-004 - Regulatory Analysis
  • KP-TR-018 - Postulated Event Methodology
  • KP-TR-010 - Fuel Performance Methodology
  • KP-TR-011 - Fuel Qualification Methodology
  • KP-TR-012 - Mechanistic Source Term Methodology
  • KP-TR-013 - Metallics Qualification Methodology
  • KP-TR-014 - Graphite Qualification Methodology Copyright © 2023 Kairos Power LLC. All Rights Reserved.

7 No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

Hermes PSAR Review Status NRC staff has completed the safety review of the PSAR

  • Kairos Power addressed all questions received from the NRC The ACRS Kairos Power subcommittee has completed their review of the PSAR during meetings conducted March 1, 4, 23, 24, and April 18 and 19
  • Kairos Power submitted changes to the PSAR to resolve internal PSAR inconsistencies identified during the subcommittee review Kairos Power is not aware of any unresolved PSAR questions at this time that preclude issuance of a construction permit.

Copyright © 2023 Kairos Power LLC. All Rights Reserved.

8 No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.

Questions Copyright © 2023 Kairos Power LLC. All Rights Reserved.

No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.