Affidavit of Dr Davidson on Standby Liquid Control Sys. Certificate of Svc Encl.Related Correspondence
ML20096H121
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/06/1984
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
Shared Package
ML20096H048 List:
References
OL, NUDOCS 8409110264
Download: ML20096H121 (7)


Text

, - - ,

7 RELATED Cwh;say q Sepcember 6, 1984 UNITED STATES OF AMERICA

' NUCLEAR REGULATORY COMMISSION BEFORE THE-ATOMIC SAFETY AND LICENSING BOARD In the Matter ofl )

) OL

-THE CLEVELAND' ELECTRIC .) Docket Nos. 50-440

. ILLUMINATING COMPANY- ) 50-441 0W

')

(Perry Nuclear Power Plant, )

. Units.l.and 2)- )

AFFIDAVIT OF DALWYN R. DAVIDSON ON SLCS INITIATION

-STATE OF. PENNSYLVANIA' )

SS:

. COUNTY OF BERKS )

L, =

.Dalwyn R. Davidson,'being duly sworn, deposes and says'as follows:

I, Dalwyn R. Davidson..am a consultant to The Cleveland. Electric Illuminating' Company.

My-business,a'ddress is 10 Center Road, Perry, Ohio 44081. Prior to August 9, 1983,

when ~ I' retired from the company, . my title was _ Senior Vice _ President. In that position,

.I had overall-responsibility for the Perry-Nuclear. Power Plant,' including plant design and communications between CEI and NRC. A summary of my professional qualifications and experience-is attached hereto as Exhibit "A". .I have personal knowledge of the

~

matters set -forth herein and believe them to be true and ciorrect.

~

-On August. 13, 1982, I wrote a letter to Mr. A. Schwencer of NRC's Division of Licensing concerning CEI's plans for anticipated transients without scram (ATWS) design

-' features for'the Perry _._ Plant. A copy of that letter is attached hereto as Exhibit "B".

(A= copy of ~-this ' letter appears 'on Attachment 2 to OCRE's Motion' for Sunnary ' disposition of. Issue No2 6)..

ne l

i Y

i_ 8409110264 340907 l'

. lDRADOCM 05000440

?' -  ;- -

,PDR ,

I .,

l In the August 13, 1982 letter, I stated that CEI was making certain changes in the Perry Plant in order to anticipate potential future requirements which might emerge from the ATWS rulemaking, which was then pending before the NRC. The letter document-ed discussions between CEI and the NRC staff at a July 20, 1982 meeting. With respect to the Standby Liquid Control System, I stated in the letter that:

"Although the design includes both manual and automatic initiation capability, only manual initiation will be functional."

As this language indicates, we have the capability of including automatic initiation in the Perry SLCS, as well as the capability for manual initia.: ion. However, only the manual initiation is functional, i.e., operational. By stating that the design would have " automatic capability," I was conveying to the NRC the fact that the SLCS design concept did not preclude changing the initiation mode to automatic should the final ATWS rule eventually require us to install automatic SLCS initiation. Thus, we hoped to avoid possible unnecessary construction delays when the final ATWS rule was issued.

My statement that the SLCS design included " automatic capability" was not intended to imply that our final design for the Perry SLCS would provide for automatic initiation.

Only with additional equipment and changes in portions of the hardware installed, could the system be automatically initiated.

EYr7 DalpR.Davidson Subscribed and sworn to before me his sixth day of September 1984.

_ _ /_ M MM

' Notary Public *L NOTARY PUBLIC My C mmissi n Expires March 1, tw My Commission Expires: BERKS COUNTY, READING. PA l

'G RESUME OF DALWYN R. DAVIDSON EDUCATION: Case Institute of Technology - 1941 Bachelor of Electrical Engineering EXPERIENCE:-

1983-Present - In August 1983, retired from CEI,' retained as a consultant to the company.

1941-1983 -

LThe Cleveland Electric Illumanating Company.

Joined CEI in 1941 and occupied'various positions in Engineering and Operations through 1967 when named Manager, System Planning Engineering Department.

In 1974, assumed position of Vice President, Engineering, and in 1979, following a reorganization within CEI, was named Vice President, System Engineering and Construction Group.- Responsibilities included planning and

[ coordinating the development of CEI's power production facilities and electrical systems,

(. including the Perry Nuclear Power Plant.

D In December 1982, named Senior Vice President L _ maintaining overall responsibility for t Engineering, Licensing, Quality Assurance, and L

Operation activities associated with the Perry Project.. Reported to the Executive Vice President.

PROFESSIONAL MEMBERSHIPS: - Institute of Electrical and Electronics Engineers

- Registered Professional Engineer, State of Ohio

- National Society of Professional Engineers

- Edison Electric Institute, Codes and Standards Committee

- Business Roundtable of Northern Ohio, Coordinating Committee l

l' L

l E L U

~

"A "

E ELECTRIC ILLUMIN ATING COMPANY 7@4 THE CLEVELAND e cLtvELANo.Omo ut01 e TELEPMcNE (2161 att Hoo e ittuuWATWo 8too e $$ PuWC SoV4[

~eosoxwn Serving The Best location in the Nation

. l Jafnn R.Davidson . .

August 13, 1982 et ectseent -

v$ttw INCINilRWC AND CoNStauCfloN

.' l Mr. A. Schwencer, Chief  ;

Licensing Branch No. 2  ! '

Division of Licensing U. 5. Nuclear Regu!atory Commission -

Washington, D. C. 20335

' ' Perry Nuc! ear Power Plant '

Doct<et Nos. 50-440;30-441 c

ATW5 Mitization Desien . eatures

Dear Mr. Schwencer:

between CE! and members of NRR, we discussed eur In a meeting on Ju!y 20, 1932, plans for changing several systems associated with the m ATWS event. .

current ATW5 ru! ma'<!ng schedu!c We believe it tohave be inmade It necessary our best interest tofor us totne modify anticipate p tial future requirements. .

current design and Instal! these sys: ems during our construction as oppose of these systems impacts our construction schedule or until the ' construction The !nclusion of these systems is based on the proposed rulemaking and operations.

not based'en a be!!ef by_ CE! that these systems are needed _to m event. ' As such, we maintain our support ru!e. .

The basic changes to be m de to the Perry plant include the fo!!owing:

An increased flow capacity for the Standby Liqu!d Contro! System

(!) from 43 gom to 86 gpm. Th!s wi!! Invo!ve increasing the s!ze ofhe re both pumos'CS -

suction header.

!!nes as wc!! as chaneing tA!! hough the des int to tne po En M :d:ritiation cacability, only_mTnual i,n!!!ation wi!! Se The ex: sting puEpW;!! be used.

he d Recircular!an Pump Trlp initiation -

(2) An upgrade to safety grade of the .

circuitry. .

(3)

A control grade feedwater runback feature.

' (4 )

An A! ternate Rod !nsertion system which is redundant to the Reacto

.orotection System scram logic.

Ec h4Lf "B"

r t

Y .

A. Schwencer ATW5 Mitigat!on August 13, 1952 Page 2 Tha details of the abnve described design wi!I be submitted as an amendment ~ .

to the Perry FSAR by January 1933. ,

We believe that this design a!cng with appropriate erdergency operat!ng procedures and training adequately address the ATW5 issue for PNPP.

Very tru!y yours, ,

Da!wy R. Davidsor.

Vice President System Engineering and Construction ORD:WEC:mb.

ce; . 3ay Si! berg, Esq.

John Stefano Max Gildner 4

O 4

O 49 4

0

l3 September 7, 1984 o

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION '[n (('fD BEFORE THE ATOMIC SAFETY AND LICENSING BOARD W 869 Jg A11:15 ari.

03Cir. , :,..2ot In the Matter of ) BNj['gdMtJ

)

THE CLEVELAND ELECTRIC ) Docket Nos. 50-440 ILLUMINATING COMPANY ) 50-441

)

(Perry Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE This is to certify that copies of the foregoing " Applicants' Response to ASLB Request for Information on ATWS Rule and the Perry SLCS," " Affidavit of Gary R. Leidich on As-Built Status of SLCS Initiation," " Affidavit of.. Frank R. Stead on the Design of the Initiation Function of the Standby Liquid Control System,"

and " Affidavit of Dalwyn R. Davidson on SLCS Initiation" were served by deposit in the United States Mail, first class, postage prepaid, this 7th day of September, 1984, to all those on the attachea Service List. i DATED: September 7, 1984

- t .f f 's ,..,w*._;c.. <

g/ , p . .I , . s, p '? '. 'l . ;, . , , '-4 ,..I o, 73 2 -..: t -'

, 3,..'.,y .. .. ..- *5 ... 1 t 3.r .,  ! - . ,

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

THE CLEVELAND ELECTRIC ) Docket Nos. 50-440 ILLUMINATING COMPANY, _E_T AL. __

) 50-441

)

(Perry Nuclear Power Plant, )

Units 1 and 2) )

SERVICE LIST Peter B. Bloch, Chairman Atomic Safety and Licensing Atomic Safety and L(censing Board Appeal Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commissi Washington, D.C. 20555 Washington, D.C. 20555 Dr. Jerry R. Kline Docketing and Service Section Atomic Safety and Licensing Board Office of the Secretary U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commissi Washington, D.C. 20555 Washington, D.C. 20555 Mr. Glenn O. Bright Colleen P. Woodhead, Esquire Atomic Safety and Licensing. Board Office of the Executive Legal U.S. Nuclear Regulatory Commission Director Washington, D.C. 20555 U.S. Nuclear Regulatory Commiss:

Washington, D.C. 20555 Christine N. Kohl, Chairman Ms. Sue Hiatt Atomic Safety and Licensing OCRE Interim Representative Appeal Board 8275 Munson Avenue U.S. Nuclear Regulatory Commission Mentor, Ohio 44060 Washington, D.C. 20555 Dr. W. Reed Johnson Terry Lodge, Esquire Atomic Safety and Licensing 618 N. Michigan Street, Suite 1:

Appeal Board Toledo, Ohio 44060 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gary J. Edles, Esquire Donald T. Ezzone, Esquire Atomic Safety and Licensing Assistant Prosecuting Attorney Appeal Board ~

Lake County Administration Cent U.S. Nuclear Regulatory Commission 105 Center Street Washington, D.C.. 20555 Painesville, Ohio 44077 Atomic Safety and Licensing John G. Cardinal, Esquire Board Panel Prosecuting Attorney U.S. Nuclear Regulatory Commission Ashtabula County Courthouse Washington, D.C. 20555 Jefferson, Ohio 44047