MONTHYEARML20216G4221999-09-27027 September 1999 Forwards NRC Operator Licensing Exam Rept 50-263/99-301 (Including Completed & Graded Tests) for Tests Administered During Wk of 990823 at Monticello Nuclear Generating Plant ML20212H2031999-09-27027 September 1999 Forwards Operator Licensing Exams Administered at Monticello Nuclear Generating Plant During Wk of 990823.Encl Consists of Facility Submitted Outline & Initial Exam Submittal ML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20211G9701999-08-30030 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Licensing Issues That May Result from Ongoing Merger Activities Between NSP & New Century Energies ML20137H5041999-04-0808 April 1999 Informs That Licensee Requesting Listed Changes to Boilerplate Distribution Lists Used by NRR for Docketed Info.Add Site General Manager to Both Prairie Island & Monticello Lists ML20202H6321999-02-0101 February 1999 Notification of 990224 Meeting with Util in Rockville,Md to Discuss Implications of Util Recently Extended Commitment for Plant ITS Submittal,Nrc Initiative Toward risk-informed TSs & Interfacing ITS Conversion with Other Activities ML20202H6671999-02-0101 February 1999 Notification of 990223 Meeting with Util in Rockville,Md to Discuss Need for TR on Util Analytical Methods Used for Other NRC Licensees,Epri Schedule for Completion of CPM3/ Coretran Analysis Topical & Util Transition Plan ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20206S6521998-08-18018 August 1998 Informs That During 980708-10 ACRS 454th Meeting,Several Matters Were Discussed & Listed Repts & Letters Completed. Executive Director Also Authorized to Transmit Noted Memos ML20236U7851998-07-24024 July 1998 Informs That During 453rd & 454th Meetings of ACRS on 980603-05 & 0708-10,NRC Reviewed GE Nuclear Energy Program Associated W/Extended Power Uprates for Operating BWRs & Application for NSP for Power Level Increase for MNGP NUREG-1635, Informs That During 453rd Meeting on 980603-05,ACRS Discussed Several Matters & Completed Listed Repts & Ltr1998-07-0707 July 1998 Informs That During 453rd Meeting on 980603-05,ACRS Discussed Several Matters & Completed Listed Repts & Ltr ML20249A8041998-06-15015 June 1998 Notification of 980630 Meeting W/Util in Rockville,Md to Discuss Issues Related to Conversion to Improved Std TSs for Monticello Nuclear Generating Plant ML20248D7081998-05-26026 May 1998 Notification of 980604 Meeting W/Util in Rockville,Md to Discuss Proposed License Amend Supporting Monticello Power Uprate Program ML20216C3931998-05-11011 May 1998 Notification of 980521 Meeting W/Northern States Power Co & GE in Rockville,Md to Discuss Status of Staff Review of Proposed Power Uprate Program for Plant ML20217F2561998-03-20020 March 1998 Notification of 980330 Meeting W/Util to Discuss Licensee Response to Staff Request for Addl Info on Licensee Uprate Program.Meeting Will Be Held in Rockville,Md ML20198Q1881998-01-13013 January 1998 Forwards Nonproprietary Version of Montecello & Cooper Trip Rept to PDR ML20198N0251998-01-12012 January 1998 Discusses 971215-16 NRR Audit of Monticello Strainer Test. Tests Were Established to Develop Data for Strainer Design Installed in NPP ML20198G1911997-12-23023 December 1997 Notification of 980107 Meeting W/Util in Rockville,Md to Discuss Plans for Conversion to Improved STS for Plants ML20198R4951997-10-27027 October 1997 Notifies of 971030 Meeting W/Util in Rockville,Md to Discuss Licensee Operability Determinations for Sys & Components w/limited-scope Weld Insps & Licensee Plans for Submitting Formal Relief Requests Per 10CFR50.55a(g)(5)(iv) ML20216F9711997-09-0505 September 1997 Notification of 970911 Meeting W/Util in Rockville,Md to Discuss Current Issues Re Environ Qualification of Equipment at Plant ML20210T1371997-09-0303 September 1997 Notification of 970910 Meeting W/Ge & Southern Co in Rockville,Md to Discuss Status of Boiling Water Reactor Power Uprate Program ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20129B6031996-10-18018 October 1996 Notification of 961105 Meeting W/Util in Rockville,Md to Discuss Contents of NSP License Amend Request Supporting Plant Power Upgrade Program NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20059H5891994-01-24024 January 1994 Notification of 940202 Meeting W/Util in Rockville,Md to Discuss Plans for Implementation of Rwl Mod as Required by NRC Bulletin 93-003 ML20057B4721993-09-15015 September 1993 Notification of 930929 Meeting W/Util in Rockville,Md to Discuss Installation of Water Level Monitoring Instrumentation at Plant ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127K6681992-11-20020 November 1992 Undated Memo Discussing Status of Field Erected Reactor Vessel Fabrication Review ML20055D5791990-06-27027 June 1990 Requests Position on Allowability of Radios or Tape Players in Control Room of Nonpower Reactors ML20155G7431988-06-0707 June 1988 Forwards F Miraglia 880527 Memo for Review & Requests Proposed Priorities for Actions on Project Manager Rept by C.O.B. 880609 ML20154Q1661988-05-27027 May 1988 Discusses Updating Project Managers Rept (Pmr) in Accordance W/New Priority Ranking Sys.Mods Have Been Made So That Pmr Will Now Accept New Priority Data.Old Priority Data Will Be Deleted During Wk of 880530.Sample Data Format Encl ML20148A7571988-03-14014 March 1988 Forwards Project Directorate III-1 Slides for 880317 Briefing of Executive Team.Slides Marked P Primary Slides Directorate Plans to Show.Other Slides Backup for Possible Ref ML20236P7451987-11-13013 November 1987 Reviews Latest Performance Indicators to Determine Whether Indicators Can Be Used to Ascertain Quality Performance.Five of Six Plants Achieving Very Good Quality Performance While One Plant Achieving Good Quality Performance ML20211N7961987-02-19019 February 1987 Requests Consideration of Encl Util 861223 Request That 860228 Application for Extension of Duration of Licenses DPR-57 & NPF-5 Be Given Higher Review Priority.Util Requests Completion of Review by 870331 ML20214C6861986-11-17017 November 1986 Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986 ML20210T3791986-10-0202 October 1986 Notification of 861017 Meeting W/Utils in Bethesda,Md to Discuss Issues Affecting Operating Reactors & NRC ML20211N8311986-10-0101 October 1986 Proposes Listed Schedule for Completion of Reviews of OLs Extensions for Listed Facilities Based on Low Priority of Effort.Plant Sys Branch Will Coordinate Responses & Recipients Will Be Provided W/Integrated Plant SERs ML20203H2741986-07-28028 July 1986 Forwards,For Review,Latest Update of SALP Ratings ML20206F1641986-06-21021 June 1986 Requests That Evaluations of Licensee Responses to Encl IE Bulletin 86-001 Re Min Flow Logic Problems That Could Disable RHR Pumps Not Be Closed Until Temporary Instruction for Guidance Issued ML20211E5131986-06-0606 June 1986 Discusses Inputs for SALP 6 Assessment for Dec 1984 - Mar 1986,due on 860618.Inputs Should Be Typed on 5520 Sys & Remain on Sys Until SALP Board Meeting Held.Listing of Insps Conducted During Assessment Period Encl ML20155F1941986-04-10010 April 1986 Summarizes Operating Reactor Events Meeting 86-11 on 860407 Re Events Since 860331.List of Attendees,Discussion of Events,Status of Assignments & Assigned Completion Dates for Items Encl.Response Requested for Incomplete Assignments ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20198G2001985-11-0505 November 1985 Recommends Issuance of IE Info Notice Re Possible LOCA at High/Low Pressure Interface After Fire Damage Occurs in Control Room.Problem Discovered During Fire Protection re-review ML20087A8311984-03-0505 March 1984 Forwards Monticello Nuclear Power Plant Site-Specific Offsite Radiological Emergency Preparedness Evaluation & Monticello Nuclear Power Plant Full-Scale Joint Emergency Exercise on 830223, Final Rept ML20207L3491983-11-30030 November 1983 Advises That Scheme Described in Licensee 830929 Request for Extension of Date for Complying w/10CFR50.54 Unsatisfactory. Mods May Result in Shift Supervisor Spending Less Time in Control room.Davis-Besse Proposal Also Unacceptable ML20058G6051982-07-13013 July 1982 Forwards Draft Ltr Clarifying Confusion During LANL 820706-09 Site Visit to Collect Data for Vital Area Analysis Program.Concerns Re Releasing of Data Resolved.Future Visits Will Be Endowed W/Official Imprimatur ML20148F1051978-10-24024 October 1978 Forwards Memos Re Recent Problems in Pipe Support Base Plate design.(ANO:7811020332,7811020336, & 7811020343.) ML20148G2271978-10-24024 October 1978 Forwards 780929 Memo Re Results of Recent Fire Protec Res Test Conducted at Underwriters Lab. (See ANO: 7810050359, 7810050373.) ML20125A4051978-09-0101 September 1978 Responds to Bajwa 780831 Request for Review of Nonradiological Ets.Several Critical Inconsistencies Still Exist Between Fes Findings & ETS 1999-09-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212H2031999-09-27027 September 1999 Forwards Operator Licensing Exams Administered at Monticello Nuclear Generating Plant During Wk of 990823.Encl Consists of Facility Submitted Outline & Initial Exam Submittal ML20216G4221999-09-27027 September 1999 Forwards NRC Operator Licensing Exam Rept 50-263/99-301 (Including Completed & Graded Tests) for Tests Administered During Wk of 990823 at Monticello Nuclear Generating Plant ML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20211G9701999-08-30030 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Licensing Issues That May Result from Ongoing Merger Activities Between NSP & New Century Energies ML20137H5041999-04-0808 April 1999 Informs That Licensee Requesting Listed Changes to Boilerplate Distribution Lists Used by NRR for Docketed Info.Add Site General Manager to Both Prairie Island & Monticello Lists ML20202H6671999-02-0101 February 1999 Notification of 990223 Meeting with Util in Rockville,Md to Discuss Need for TR on Util Analytical Methods Used for Other NRC Licensees,Epri Schedule for Completion of CPM3/ Coretran Analysis Topical & Util Transition Plan ML20202H6321999-02-0101 February 1999 Notification of 990224 Meeting with Util in Rockville,Md to Discuss Implications of Util Recently Extended Commitment for Plant ITS Submittal,Nrc Initiative Toward risk-informed TSs & Interfacing ITS Conversion with Other Activities ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20206S6521998-08-18018 August 1998 Informs That During 980708-10 ACRS 454th Meeting,Several Matters Were Discussed & Listed Repts & Letters Completed. Executive Director Also Authorized to Transmit Noted Memos ML20236U7851998-07-24024 July 1998 Informs That During 453rd & 454th Meetings of ACRS on 980603-05 & 0708-10,NRC Reviewed GE Nuclear Energy Program Associated W/Extended Power Uprates for Operating BWRs & Application for NSP for Power Level Increase for MNGP NUREG-1635, Informs That During 453rd Meeting on 980603-05,ACRS Discussed Several Matters & Completed Listed Repts & Ltr1998-07-0707 July 1998 Informs That During 453rd Meeting on 980603-05,ACRS Discussed Several Matters & Completed Listed Repts & Ltr ML20249A8041998-06-15015 June 1998 Notification of 980630 Meeting W/Util in Rockville,Md to Discuss Issues Related to Conversion to Improved Std TSs for Monticello Nuclear Generating Plant ML20248D7081998-05-26026 May 1998 Notification of 980604 Meeting W/Util in Rockville,Md to Discuss Proposed License Amend Supporting Monticello Power Uprate Program ML20216C3931998-05-11011 May 1998 Notification of 980521 Meeting W/Northern States Power Co & GE in Rockville,Md to Discuss Status of Staff Review of Proposed Power Uprate Program for Plant ML20217F2561998-03-20020 March 1998 Notification of 980330 Meeting W/Util to Discuss Licensee Response to Staff Request for Addl Info on Licensee Uprate Program.Meeting Will Be Held in Rockville,Md ML20198Q1881998-01-13013 January 1998 Forwards Nonproprietary Version of Montecello & Cooper Trip Rept to PDR ML20198N0251998-01-12012 January 1998 Discusses 971215-16 NRR Audit of Monticello Strainer Test. Tests Were Established to Develop Data for Strainer Design Installed in NPP ML20198G1911997-12-23023 December 1997 Notification of 980107 Meeting W/Util in Rockville,Md to Discuss Plans for Conversion to Improved STS for Plants ML20198R4951997-10-27027 October 1997 Notifies of 971030 Meeting W/Util in Rockville,Md to Discuss Licensee Operability Determinations for Sys & Components w/limited-scope Weld Insps & Licensee Plans for Submitting Formal Relief Requests Per 10CFR50.55a(g)(5)(iv) ML20216F9711997-09-0505 September 1997 Notification of 970911 Meeting W/Util in Rockville,Md to Discuss Current Issues Re Environ Qualification of Equipment at Plant ML20210T1371997-09-0303 September 1997 Notification of 970910 Meeting W/Ge & Southern Co in Rockville,Md to Discuss Status of Boiling Water Reactor Power Uprate Program ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20129B6031996-10-18018 October 1996 Notification of 961105 Meeting W/Util in Rockville,Md to Discuss Contents of NSP License Amend Request Supporting Plant Power Upgrade Program NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20059H5891994-01-24024 January 1994 Notification of 940202 Meeting W/Util in Rockville,Md to Discuss Plans for Implementation of Rwl Mod as Required by NRC Bulletin 93-003 ML20057B4721993-09-15015 September 1993 Notification of 930929 Meeting W/Util in Rockville,Md to Discuss Installation of Water Level Monitoring Instrumentation at Plant ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127K6681992-11-20020 November 1992 Undated Memo Discussing Status of Field Erected Reactor Vessel Fabrication Review ML20055D5791990-06-27027 June 1990 Requests Position on Allowability of Radios or Tape Players in Control Room of Nonpower Reactors ML20155G7431988-06-0707 June 1988 Forwards F Miraglia 880527 Memo for Review & Requests Proposed Priorities for Actions on Project Manager Rept by C.O.B. 880609 ML20154Q1661988-05-27027 May 1988 Discusses Updating Project Managers Rept (Pmr) in Accordance W/New Priority Ranking Sys.Mods Have Been Made So That Pmr Will Now Accept New Priority Data.Old Priority Data Will Be Deleted During Wk of 880530.Sample Data Format Encl ML20148A7571988-03-14014 March 1988 Forwards Project Directorate III-1 Slides for 880317 Briefing of Executive Team.Slides Marked P Primary Slides Directorate Plans to Show.Other Slides Backup for Possible Ref ML20236P7451987-11-13013 November 1987 Reviews Latest Performance Indicators to Determine Whether Indicators Can Be Used to Ascertain Quality Performance.Five of Six Plants Achieving Very Good Quality Performance While One Plant Achieving Good Quality Performance ML20215L3101987-05-0707 May 1987 Staff Requirements Memo Re Commission 870430 Affirmation/ Discussion & Vote in Washington,Dc on SECY-87-68A Concerning Order to Rescind 861020 Order Directing Licensee to Show Why OL Should Not Be Modified.Order Signed on 870501 ML20211N7961987-02-19019 February 1987 Requests Consideration of Encl Util 861223 Request That 860228 Application for Extension of Duration of Licenses DPR-57 & NPF-5 Be Given Higher Review Priority.Util Requests Completion of Review by 870331 ML20214C6861986-11-17017 November 1986 Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986 ML20210T3791986-10-0202 October 1986 Notification of 861017 Meeting W/Utils in Bethesda,Md to Discuss Issues Affecting Operating Reactors & NRC ML20211N8311986-10-0101 October 1986 Proposes Listed Schedule for Completion of Reviews of OLs Extensions for Listed Facilities Based on Low Priority of Effort.Plant Sys Branch Will Coordinate Responses & Recipients Will Be Provided W/Integrated Plant SERs ML20203H2741986-07-28028 July 1986 Forwards,For Review,Latest Update of SALP Ratings ML20206F1641986-06-21021 June 1986 Requests That Evaluations of Licensee Responses to Encl IE Bulletin 86-001 Re Min Flow Logic Problems That Could Disable RHR Pumps Not Be Closed Until Temporary Instruction for Guidance Issued ML20211E5131986-06-0606 June 1986 Discusses Inputs for SALP 6 Assessment for Dec 1984 - Mar 1986,due on 860618.Inputs Should Be Typed on 5520 Sys & Remain on Sys Until SALP Board Meeting Held.Listing of Insps Conducted During Assessment Period Encl ML20155F1941986-04-10010 April 1986 Summarizes Operating Reactor Events Meeting 86-11 on 860407 Re Events Since 860331.List of Attendees,Discussion of Events,Status of Assignments & Assigned Completion Dates for Items Encl.Response Requested for Incomplete Assignments ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20198G2001985-11-0505 November 1985 Recommends Issuance of IE Info Notice Re Possible LOCA at High/Low Pressure Interface After Fire Damage Occurs in Control Room.Problem Discovered During Fire Protection re-review ML20087A8311984-03-0505 March 1984 Forwards Monticello Nuclear Power Plant Site-Specific Offsite Radiological Emergency Preparedness Evaluation & Monticello Nuclear Power Plant Full-Scale Joint Emergency Exercise on 830223, Final Rept ML20207L3491983-11-30030 November 1983 Advises That Scheme Described in Licensee 830929 Request for Extension of Date for Complying w/10CFR50.54 Unsatisfactory. Mods May Result in Shift Supervisor Spending Less Time in Control room.Davis-Besse Proposal Also Unacceptable ML20058G6051982-07-13013 July 1982 Forwards Draft Ltr Clarifying Confusion During LANL 820706-09 Site Visit to Collect Data for Vital Area Analysis Program.Concerns Re Releasing of Data Resolved.Future Visits Will Be Endowed W/Official Imprimatur ML20148F1051978-10-24024 October 1978 Forwards Memos Re Recent Problems in Pipe Support Base Plate design.(ANO:7811020332,7811020336, & 7811020343.) ML20148G2271978-10-24024 October 1978 Forwards 780929 Memo Re Results of Recent Fire Protec Res Test Conducted at Underwriters Lab. (See ANO: 7810050359, 7810050373.) 1999-09-27
[Table view] |
Text
- __ . . . ____ -
D p *e UNITED STATES f( b .
t' ATOMIC ENERGY COMMISSION I 'I 7*J l I wasmunvow, o c, rosas SEP 131973 Files (Docket No. 50-263)
THRU: 4 pmann, Chief, ORB #2, L l0,3.Zj%
yt. N&
MONTICELLO CORE 001 ANT RELIEF VALVE RESPONSE TIMES AND SAFETY VALVE SET POINT INCREASES (NORTHERN STATES POWER COMPANY)
By letter dated August 21, 1973, Northern States Power Company (NSP) described " Planned Reactor Operation from 2000 MWD /STU to the End of Cycle 2". Previous analyses (references 1 through 4) have focused on the overpressure transient following a turbine trip without bypass and concluded that shorter scram times and the requirement that four relief valves be in service would limit the coolant overpressure transient during the first 2250 MWD /STU of Cycle 2 operation such that full power operation was acceptable. We approved Technical Specification changes to reduce scram times and require four operating relief valves for continued reactor operation through 2250 MWD /STU of Cycle 2 operation at power icvels up to 100% (Ref. 5). NSP later reduced the exposure threshold from 2250 MWD /STU to 2000 MWD /Snl (Ref. 6) to account for the reduction in opening speed of the relief valves.
According to the August 21, 1973 letter, NSP plans to submit additional analysis for the period beyond 2000 MWD /STU exposure threshold of Cycle 2 and additional Technical Specification changes to minimize or eliminate the power restriction to be imposed based on all rods out scram reactivity curve (84% according to item IV of the NSP August 21, 1973 letter), the condition achieved near the end of Cycle 2.
The reanalysis by NSP of the reactor power level limits for core life-time beyond the 2000 MWD /STU exposure threshold will be based on (1) completion of modifications to the relief valve to restore the original opening speed (0.2 see instead of 0.8 observed by GE in some instances at unidentified BWRs), (2) faster scram times, at least for the remainder of Cycle 2 life beyond the 2000 MWD /STO exposure threshold, and (3) resetting of safety valve set points upward from 1210-1220 psi to 1240 psi.
,4 t
7 Wc 9212070468 730913 PDR ADOCK 05000263 p PDR
Files SEP 131973 For the period beyond Cycle 2, the letter indicates that the addition of more relief valves is being considered to perinanently eliminate the less than 100% power level restrictions required by the current analysia.
Although the net increase in safety valve set point is only 20-30 pai, we will consider the ude requirements and safety valvo set points at other BWRs in our evaluation of the information yet to be submitted by NSP.
n k 1
]
g w.4 (I b %
James J.' Shea Operating Reactors Branch #2 Directorate of Licensing cci AEC PDR Local PDR D. J. Skovholt T. J. Carter D. L. Ziemann J. J. Thea R. H. Diggs L. Mayer, NSP 1
l
?
_ . - - -- . - _ . . - - -_~ - ._ _ . - . - -_-_- - .-.- .- - - . . -- .~ .
t I
I l
REFERENCES 1
i 9
- 1. " Report of a Change in the Transient Analysis as Described in the
- FSAR", NSP letter dated August 14, 1972.
i ~
j NSP report of reanalysis of transients discussed in FSAR based i on EOC conditions which is different from the FSAR results. - The i change involves a slower rate of negative reactivity insertion
! for the first half of the control rod insertion stroke caused by spatial distribution of reactivity depletion in the core.
! 2. " Supplemental Report of a Change in the Transient Analysis as Described in the FSAR", NSP letter dated February 13, 1973.
NSP presented GE "Results of Transient Reanalysis for Monticello i Nuclear Generating Plant"_ with end-of-cycle core dynamic charac-teristics. NSP, on the. basis of this analysis, promised to submit, in the near future, a proposed technical specification change to ;
j specify (1) shorter scram times and (2) operation with all- four :
relief valves instead of three and to revise the bases for the
- technical specification.
7
- 3. " Request for Authorization to Operate with Reload Fuel in the 1
Core", NSP letter dated February -20,1973.
l NSP claims that the reload core fuel does not respond significantly k
< different from the initial core. Page vie 8 of the attached report F assumed that the scram reactivity curve for EOC-1 was valid for j Cycle 2 operation.
- 4. " Request for Changes to the Technical Specifications", NSP-letter dated June 1,1973.
Scram times were reduced and four safety relief valves were required
~
]
, for reactor operation and reactor operation at 100% power was restricted to the first 2250 MWD /STU of the second fuel cycle.
1 I
A T
4 4
t t
f
+ y---- g -Ag---w ww e w e +vm m w a w =-r w t,+my, "wrev-eew a - = *** t c,we, - yn -v v- 4 v w+w- - ,- e-se=-rw-+--ee*-t--*-e--s**t-<-,-v- g-f v e---e
- 5. Approval of Change 8 requiring four relief valves and shorter scram times, AEC letter dated July 2, 1973.
The AEC letter of approval also requested that analysis and tech-nical specification changes for the period beyond 2250 MWD /STU be submitted for AEC review at letst 30 days prior to the 2250 MWD /STU deoletion.
- 6. " Observed Relief Valve Opening Times Dif ferent Than Those Assumed in the Transient Analysis", NSP letter dated August 1, 1973.
General Electric informed NSP of delayed opening observed for target rock relief valves, i.e, 0.8 second to open vs 0.2 second reported in Monticello FSAR. NSp cannot measure opening times of the relief valves, but assuming such a delay results in a reduction of the exposure threshold from 2250 MWD /STU as previously approved (Ref. 5 above) to 2000 MWD /STU.