Site Emergency Plan Implementing Procedure Revision
ML22166A395
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/15/2022
From: Rasmussen M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML22166A395 (3)


Text

Post Office Box 2000, Decatur, Alabama 35609-2000 June 15, 2022 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, 50-296, and 72-052

Subject:

Browns Ferry Nuclear Plant - Site Emergency Plan Implementing Procedure Revision In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(q); 10 CFR 50, Appendix E; and 10 CFR 72.44(f), the Tennessee Valley Authority (TVA) is submitting a description of changes to the Browns Ferry Nuclear Plant (BFN) Radiological Emergency Plan (REP). The affected document is the BFN Emergency Plan Implementing Procedure (EPIP) named below.

EPIP Revision Title Effective Date EPIP-1 0062 Emergency Classification Procedure 05/26/2022 EPIP-2 0043 Notice of Unusual Event 05/16/2022 EPIP-3 0046 Alert 05/16/2022 EPIP-4 0046 Site Area Emergency 05/16/2022 EPIP-5 0060 General Emergency 05/16/2022

U.S. Nuclear Regulatory Commission Page 2 June 15, 2022 Description of Changes and Summary of Analysis EPIP-2 Revision 43, EPIP-3 Revision 46, EPIP-4 Revision 46, and EPIP-5 Revision 60 revised Vaporstream instruction to clarify expected actions to be taken when making an emergency notification using Vaporstream:

Added instruction for action to take when the State has not opened the Vaporstream notification in a timely manner to the main body of the document and to Attachment 7.

Revised Vaporstream guide related to notification completion to remove (2-5 minutes) as the suggested acceptable time frame for the State to open the notification and reinforce the 15-minute requirement for making notifications.

These changes were determined to be changes to the REP that were not editorial or typographical in nature. These changes were also determined to not conform to activities that had prior approval. Planning Standards 10 CFR 50.47(b)(5) - Notification Methods and Procedures and 50.47(b)(6) - Emergency Communications were impacted by this change; therefore, it was concluded that the changes could not be implemented without performing a 50.54(q) reduction in effectiveness evaluation. Upon completion of the Effectiveness Evaluation Forms for these changes, it was concluded that the changes continue to comply with the requirements of 50.47(b) and 50 Appendix E, and that the changes do not constitute a reduction in effectiveness. Therefore, these changes were allowed to be implemented without prior approval.

Additionally, EPIP-1 Revision 62 corrected a pagination issue in the table of contents for the initiating conditions. This was determined to be an editorial change to the REP which does not require a 50.54(q) reduction in effectiveness evaluation, and which can be implemented without prior approval.

There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact B. F. Tidwell at (256) 729-3666.

Respectfully, Matthew Rasmussen Site Vice President

U.S. Nuclear Regulatory Commission Page 3 June 15, 2022 cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRR Project Manager - Browns Ferry Nuclear Plant