ML22179A327

From kanterella
Revision as of 09:23, 18 July 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2018 PI Ile ES-301-3 & ES-301-4
ML22179A327
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/08/2018
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
Baker R
Shared Package
ML17165A322 List:
References
Download: ML22179A327 (2)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facili PRAIRIE ISLAND Date of Examination: SEP 2018 Test Number: PI-ILT-NRC-18 Initials

1. General Criteria a b*
a. The operating test conforms to the previously approved outline; changes are consistent with sam lin re uirements e .. , 10 CFR 55.45, o erational im ortance, safe! function distribution
b. There is no day-to-day repetition between this and other operating tests to be administered durin this examination.

c.

d. Overlap with the written examination and between different parts of the operating test is within acce table limits.
e. It appears that the operating test will differentiate between competent and less-than-competent a licants at the desi nated license level.
2. Walkthrou h Criteria
a. Each JPM includes the following, as applicable:

initial conditions initialing cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria _that include-detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the se uence of ste s, if a licable

b. Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations s ecified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4, and a co is attached.

Date

a. Author /,-2o-l g
b. Facility Reviewer(*)
c. NRC Chief Examiner(#)
d. NRC Supervisor ~")li*0-_u.i.u,=...:...=~~:.J,..l,!=~~!./--~T+=...!....-=----- --
  • The facility licensee signature is not applicable for NRC-developed tests.
  1. The inde ndent NRC reviewer initials items in column "c"; the chief examiner concurrence is re uired .

ES-301, Page 24 of 33

ES-301 Simulator Scenario Quality Checklist Form ES-301-4 Facility: PRAIRIE ISLAND Date of Exam: SEP 2018 Scenario Numbers: 1/2/3/4 Operating Test No.:PI-ILT-NRC-18 II QUALITATIVE ATTRIBUTES Initials a b* c#

1. The initial conditions are realistic in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events. S!. ~ I~
2. The scenarios consist mostly of related events. ~ ~ Y&
3. Each event description consists of the following :
  • the point in the scenario when it is to be initiated
  • the malfunction(s) or conditions that are entered to initiate theevent
  • the symptoms/cues that will be visible to the crew

<§s' ~

  • the expected operator actions (by shift position)

~

  • the event termination point (if applicable)
4. The events are valid with regard to physics and thermodynamics. ~

@!s ~

5. Sequencing and timing of events is reasonable and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. ~ ~ ~
6. If time compression techniques are used, the scenario summary clearlyso indicates.

Operators have sufficient time to carry out expected activities without undue time constraints.

Cues are given. 1£.. <£ ~

7. The simulator modeling is not altered. 5-C I~ w
8. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance

~ ~

deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios. ~

9. Scenarios are new or significantly modified in accordance with Section 0.5 of ES-301 .

'X. ~ ~

10. All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios). ~ ~ -~

~

11 . The scenario set provides the opportunity for each applicant to be evaluated in each of the applicable rating factors. (Competency rating factors as described on Forms ES-303-1 and ES-303-3.) e.t. ~

~~

12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios). ~

~ ~

13. Applicants are evaluated on a similar number of preidentified critical tasks across scenarios, when possible. ~
14. The level of difficulty is appropriate to support licensing decisions for each crew position.

~ ;1$ ~

Target Quantitative Attributes per Scenario (See Section 0.5.d) Actual Attributes - - -

1. Malfunctions after EOP entry (1-2) 2/3/2/3 ~ ~ \C~ v
2. Abnormal events (2-4) 2/2/3/2 ~ ~ ~
3. Major transients (1-2) 1/1/1/1 5t'. J) ~
4. EOPs entered/requiring substantive actions(1-2) 1/2/2/2 X (fu ~~
5. Entry into a contingency EOP with substantive actions (~ 1 per scenario set) 1/ 1 ~ ~ ~
6. Preidentified critical tasks ~2) 4/2/2/2 £_ I/;( 'eEP-,
  • The facility licensee signature is not applicable for NRC-developed tests.
  1. An independent NRC reviewer initials items in column "c"; chief examiner concurrence is required .

61 t 'f ~ /?..'IJ"IM

~{..- ~~

{]) r ; ~ p S I l\,li;.Fw11.1°Troi.:> IV=~ ~~ l:.~1 .. P~Mlt'/IL/,,

VE11!tRIW.r ES-301, Page 25 of 33