Letter Sequence Meeting |
---|
EPID:L-2022-LRM-0013, Presentation Information for Third Pre-Application Meeting Regarding Use of Framatome Fuel (Open) |
|
MONTHYEARML21279A2862021-10-0606 October 2021 Supplement to Presentation Information for Second Pre-Application Meeting Re Use of Framatome Fuel at Plant Project stage: Supplement ML22047A0922022-02-11011 February 2022, 15 February 2022 Presentation Information for Third Pre-Application Meeting Regarding Use of Framatome Fuel Project stage: Request ML22045A9852022-02-14014 February 2022 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for the Callaway Plant, Unit No. 1 Project stage: Meeting ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting Project stage: Meeting ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) Project stage: Meeting ML22047A0932022-02-15015 February 2022 Presentation Information for Third Pre-Application Meeting Regarding Use of Framatome Fuel Project stage: Meeting ML22048C2192022-02-22022 February 2022 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML22089A2292022-04-0606 April 2022 February 28, 2022, Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 Project stage: Meeting 2022-02-14
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
1. Callaway Plant Ameren MiSSOURI SENSITIVE INFORMATION WITHHOLD UNDER 10 CFR 2.390(a)(4)
February 15, 2022 ULNRC-06716 U.S. Nuclear Regulatory Commission Aftn: Document Control Desk Washington, DC 20555-000 1 Ladies and Gentlemen: 10 CFR 2.390 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 PRESENTATION INFORMATION FOR THIRD PRE-APPLICATION MEETING REGARDING USE OF FRAMATOME FUEL AT CALLAWAY PLANT
References:
1 Ameren Missouri letter dated May 3, 202 1 , Presentation Information for Pre Application Meeting Regarding Use Of framatome Fuel at Callaway Plant.
(ULNRC-06654) (ADAMS Package Accession No. ML21123A258)
- 2. NRC letter dated July 1, 2021, Summary ofMay 20, 2021, Partially Closed Pre Application Teleconference with Union Electric Company Regarding Approval to Insert Framatomes GAlA Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 (EPID L-2021-LRM-0043). (ADAMS Accession No. ML21168A002) 3 Ameren Missouri letter dated September 28, 2021, Presentation Information for Second Pre-Application Meeting Regarding Use OfFramatome Fuel at Callaway Plant. (ULNRC-06694) (ADAMS Accession No. ML21271A611)
- 4. Ameren Missouri letter dated October 6, 2021, Supplement to Presentation Information for Second Pre-Application Meeting Regarding Use of Framatome Fuel at Callaway Plant. (ULNRC-06695) (ADAMS Accession No. ML21279A286)
- 5. NRC letter dated November 17, 2021, Summary of October 14, 2021, Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatomes GAlA Fuel Assemblies in its Core in Reload Quantities for Callaway Plant, Unit No. 1 (EPID L-202 1 -LRM-0099). (ADAMS Accession No. ML21308A074)
Enclosure 3 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal ofEnclosure 3, this letter is uncontrolled.
SENSITIVE iNFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4) 83 15 (ounty :Eoad 459 : Steedrrian, I\I 65077 : \rrierenfvlissouri.coiii
ULNRC-06716 SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)
February 15, 2022 Page 2 of 5 A meeting (phone conference) between Union Electric (Ameren Missouri), framatome and NRC personnel is being planned in order to discuss a license amendment request (LAR) to be submitted in the March 2022 timeftame for the Callaway Plant. The amendment to be requested would support transition to the use of fuel from a new/different fuel vendor (Framatome, Inc.) for the Callaway Plant, beyond the four lead fuel assemblies that have already been loaded into the Callaway core in accordance with the provisions of Callaway Technical Specification 4.2. 1, Fuel Assemblies.
Specifically, the LAR would support the loading and unrestricted use ofFramatome GAlA fuel assemblies at Callaway, as qualified in accordance with Callaways vendor qualification program (VQP) for Framatome.
From preparation of the presentation materials to be used for the anticipated pre-application meeting, it was determined that some ofthe included information is proprietary to Framatome. On that basis, the pre-application meeting is being planned as partly a public meeting and partly a closed meeting.
The presentation materials to be used for the two-part meeting are in the form ofPowerPoint slides prepared by Ameren and Framatome personnel. The purpose ofthis letter is to transmit the slides to the NRC staffin advance ofthe meetings.
Slides for the public meeting and slides for the closed meeting were separately prepared. The set of slides to be used for the public meeting is provided as Enclosure 1 Two sets of slides were prepared for the closed meeting, and they are provided as Enclosures 2 and 3 Enclosure 2 is a redacted, non-proprietary version ofthe closed meeting slides, from which the proprietary information has been removed, as indicated on two ofthe slides provided. Enclosure 3 is the proprietary version of the closed meeting slides. This is the enclosure containing information that is to be withheld from public disclosure. For both ofthese enclosures (i.e., Enclosures 2 and 3), brackets and notation indicate the placement ofthe proprietary information and the basis for withholding the information from public disclosure pursuant to 10 CFR 2.390, as further explained by an affidavit prepared by Framatome.
The affidavit is provided as Enclosure 4.
The forthcoming meeting(s) is intended to address the licensing aspects ofthe fuel transition in greater detail than what was addressed in the first and second pre-submittal meetings conducted for this LAR.
Those meetings were conducted on May 20, 2021 (References 1 and 2) and October 14, 2021 (References 3, 4 and 5), respectively.
This letter does not contain new commitments.
Enclosure 3 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal ofEnclosure 3, this letter is uncontrolled.
SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)
ULNRC-06716 SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)
February 15, 2022 Page 3 of 5 Ifthere are any questions, please contact Tom Elwood at (3 14) 225-1905.
Sincerely,
_% Steve J. Meyer Manager, Regulatory Affairs DER/mlp
Enclosures:
1 Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting)
- 2. Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting 3 Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Proprietary (Non-Redacted) Version for Closed Meeting
- 4. Affidavit Enclosure 3 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal ofEnclosure 3, this letter is uncontrolled.
SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)
ULNRC-06716 SENSITIVE INFORMATION WITHHOLD UNDER 10 CFR 2.390(a)(4)
February 15, 2022 Page 4 of 5 cc: Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001 Enclosure 3 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal ofEnclosure 3, this letter is uncontrolled.
SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)
ULNRC-06716 SENSITIVE iNFORMATION WITHHOLD UNDER 10 CFR 2.390(a)(4)
February 15, 2022 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6500 West Freeway, Suite 400 fort Worth, TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
F. M. Diya B. L Cox F. J. Bianco S. P. Banker S. J. Meyer T. B. Elwood B. D. Richardson I. S. Gardner, Framatome NSRB Secretary w/o enclosure STARS Regulatory Affairs w/o enclosure Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP) w/o enclosure Ms. Claire Eubanks (Missouri Public Service Commission) w/o enclosure Mr. Aaron Schmidt (DNR) w/o enclosure Enclosure 3 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal ofEnclosure 3, this letter is uncontrolled.
SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)