Letter Sequence Acceptance Review |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML21090A1852021-03-31031 March 2021 Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) Project stage: Request ML21125A0452021-05-0404 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Plant, Unit 1 - License Amendment Request - Final Resolution to Address Concerns of GSI-191 - EPID L-2021-LLA-0059 Project stage: Acceptance Review ML21130A5882021-05-11011 May 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions to Adopt a Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004 02 Project stage: Acceptance Review ULNRC-06664, Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014)2021-05-27027 May 2021 Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) Project stage: Supplement ML21160A1482021-06-10010 June 2021 Acceptance of Requested Licensing Actions License Amendment and Regulatory Exemptions for a Risk Informed Approach to Address Generic Safety Issue 191 and Respond to Generic Letter 2004-02 Project stage: Acceptance Review ML21203A1922021-07-22022 July 2021 Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL-2004-02 (LDCN 19-0014) Project stage: Request ML21203A1932021-07-22022 July 2021 Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL-2004-02 (LDCN 19-0014) Project stage: Request ML21197A0632021-07-23023 July 2021 Audit Plan and Setup of Online Reference Portal for License Amendment Request Risk-Informed Approach for Closure of Generic Safety Issue-191 Project stage: Other ML21237A1352021-08-23023 August 2021 Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 Project stage: Request ML21237A1362021-08-23023 August 2021 Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 Project stage: Other ML21238A1382021-09-14014 September 2021 Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 Project stage: Other ML21280A3782021-10-0707 October 2021 Third Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL-2004-02 (LDCN 19-0014) Project stage: Request ML21280A3792021-10-0707 October 2021 Third Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL-2004-02 (LDCN 19-0014) Project stage: Supplement ML22027A8042022-01-27027 January 2022 Fourth (Post-Audit) Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) Project stage: Request ML22027A8052022-01-27027 January 2022 Fourth (Post-Audit) Supplement to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) Project stage: Supplement ULNRC-06721, Fifth (Post-Audit) Supplement Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014)2022-03-0808 March 2022 Fifth (Post-Audit) Supplement Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) Project stage: Supplement ML22068A0292022-03-0808 March 2022 Response to Audit Question/Item 23 in NRC Letter Dated September 14, 2021 Project stage: Other ML22068A0272022-03-0808 March 2022 Fifth (Post-Audit) Supplement Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) Project stage: Request ML22087A4022022-03-28028 March 2022 NRR E-mail Capture - Callaway - Draft RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to Generic Letter 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) Project stage: Draft RAI ML22096A0232022-04-0505 April 2022 NRR E-mail Capture - Callaway Plant - Final RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to GL 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) Project stage: RAI ML22146A3392022-05-26026 May 2022 Enclosure 1: Ameren Missouri Response to NRC RAIs Project stage: Response to RAI ML22146A3372022-05-26026 May 2022, 27 May 2022 Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014) Project stage: Request ULNRC-06735, Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014).2022-05-27027 May 2022 Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014). Project stage: Response to RAI ML22182A4012022-08-23023 August 2022 Callaway - Environmental Assessment & Finding of No Significant Impact Requests for Amendment & Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (EPID L-2021-LLA-0059 & L-2021-LLE-0021) Project stage: Request ML22182A4062022-08-23023 August 2022 FRN - Environmental Assessment & Finding of No Significant Impact Requests for Amendment & Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (EPID L-2021-LLA-0059 & L-2021-LLE-0021) Project stage: Other ML22182A4112022-08-23023 August 2022 Letter - Environmental Assessment & Finding of No Significant Impact Requests for Amendment & Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (EPID L-2021-LLA-0059 & L-2021-LLE-00021) Project stage: Other ULNRC-06766, Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014)2022-09-0808 September 2022 Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) Project stage: Supplement ML22220A1302022-10-21021 October 2022 Exemptions from the Requirements of 10 CFR 50.46 and 10 CFR Part 50 Appendix a, General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Cover Letter) Project stage: Other ML22220A1312022-10-21021 October 2022 Exemptions from the Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.46, 10 CFR 50 Appendix a General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Exemptions) Project stage: Other ML22220A1322022-10-21021 October 2022 Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach Project stage: Approval ML22220A1292022-10-25025 October 2022 Exemptions from the Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.46, 10 CFR 50 Appendix a General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (FRN) Project stage: Other 2021-09-14
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML22348A1162022-12-21021 December 2022 Acceptance of Requested Licensing Actions Application for License Amendment & Regulatory Exemptions for TS Change & Exemption Request Regarding Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150 & EPID L-2022-LLE-0030) ML22301A1812022-11-0808 November 2022 Acceptance of Requested Licensing Actions License Amendment Regarding Proposed Technical Specification Changes for Spent Fuel Storage ML21342A3332021-12-10010 December 2021 Acceptance of Requested Licensing Actions License Amendment for Adoption of Alternate Source Term and Revision of Technical Specifications ML21160A1482021-06-10010 June 2021 Acceptance of Requested Licensing Actions License Amendment and Regulatory Exemptions for a Risk Informed Approach to Address Generic Safety Issue 191 and Respond to Generic Letter 2004-02 ML19130A0442019-04-16016 April 2019 Acceptance Review for (EPID L-2019-LLA-0054) TS Change Main Turbine Control Slave Relay LAR ML15294A2322015-10-28028 October 2015 Acceptance of Requested Licensing Action, Review and Approval of Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 14-05A, Revision 1 ML13281A4232013-10-0808 October 2013 Acceptance Review Email, Requests for Relief PR-04 and PR-06, ASME OM Code Requirements for Frequency for Relief Valves and Devices, Fourth 10-Year Inservice Testing Interval ML13281A4212013-10-0808 October 2013 Acceptance Review Email, Requests for Relief PR-01, PR-02, PR-03, and PR-05, ASME OM Code Cases for Group a and B Pumps for Fourth 10-Year Inservice Testing Interval ML13039A0932013-02-0808 February 2013 Acceptance Review Email, License Amendment Request to Revise Final Safety Analysis Report FSAR-SP Sections 3.7(B) and 3.7(N), Seismic Design to Use Regulatory Guide 1.61 Revision 1 ML1132604512011-11-22022 November 2011 Correction Acceptance Review Email, Request for License Amendment to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML1132602802011-11-22022 November 2011 Acceptance Review Email, Request for License Amendment to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML1129804802011-10-25025 October 2011 Acceptance Review Email, Revise Technical Specification 3.3.6, Containment Purge Isolation Instrumentation. ML1121505412011-08-0303 August 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems, ML1101408492011-01-14014 January 2011 Acceptance Review Email, License Amendment Request to Add New Surveillance Requirement 3.3.8.6 to Technical Specification 3.3.8, Emergency Exhaust System (EES) Actuation Instrumentation ML1025905882010-09-16016 September 2010 Acceptance Review E-mail, License Amendment Request, Revise TSs to Adopt TSTF-425 Rev. 3, Relocate Surveillance Frequencies to Licensee Control-Risk Informed Technical Specification Task Force Initiative 5 ML1025906042010-09-16016 September 2010 Acceptance Review E-mail License Amendment Request, Revise License Condition and Approve Cyber Security Plan ML1014600722010-06-16016 June 2010 License Amendment Request for Approval of the Cyber Security Plan ML1009603372010-04-0606 April 2010 Acceptance Review Email, License Amendment Request (Exigent Circumstances), Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, for Function 6.G in TS Table 3.3.2-1 ML1001415002010-01-14014 January 2010 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, for Extension of Completion Times ML0920901462009-07-28028 July 2009 Acceptance Review Email, License Amendment Request, Technical Specification Changes Consistent with TSTF-447, Revision 1, Elimination of Hydrogen Recombiner and Change to Hydrogen and Oxygen Monitors ML0917403962009-06-23023 June 2009 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.3.9, Boron Dilution Mitigation System (Bdms) ML0914105822009-05-21021 May 2009 Acceptance Review Email, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0914105692009-05-21021 May 2009 Acceptance Review Email, Revise Technical Specification (TS) 3.7.3, Main Feedwater Regulating Valves (Mfivs) and Main Feedwater Regulating Valve Bypass Valves (Mfrvbvs), and TS 3.3.2, ESFAS Instrumentation ML0914104732009-05-21021 May 2009 Acceptance Review Email, Revise Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.3.2, ESFAS Instrumentation, and Add New TS 3.7.19, Secondary System Isolation Valves (Ssivs) ML0909701582009-04-0707 April 2009 Acceptance Review Email, Modify Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for One-time Extension of Integrated Leak Rate Test Interval ML0907504882009-03-16016 March 2009 Acceptance Review E-mail, License Amendment Request, Revise TS 3.8.4, DC Sources - Operating, & TS 3.8.5, DC Sources - Shutdown, to Revise Battery Connection Resistance Limits Surveillance Requirements-TAC ME0292 2024-01-19
[Table view] |
Text
June 10, 2021 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Energy Center 8315 County Road 459 Steedman, MO 65077
SUBJECT:
CALLAWAY PLANT, UNIT NO. 1 - ACCEPTANCE OF REQUESTED LICENSING ACTIONS RE: LICENSE AMENDMENT AND REGULATORY EXEMPTIONS FOR A RISK-INFORMED APPROACH TO ADDRESS GENERIC SAFETY ISSUE-191 AND RESPOND TO GENERIC LETTER 2004-02 (EPID L-2021-LLA-0059 AND EPID L-2021-LLE-0021)
Dear Mr. Diya:
By letter dated March 31, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21090A184), Union Electric Company, dba Ameren Missouri (the licensee), pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit, or early site permit, requested an amendment for the licensees final resolution to addressing the concerns of Generic Safety Issue (GSI)-191, Assessment of Debris Accumulation on PWR [Pressurized-Water Reactor]
Sump Performance, and for responding to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Additionally, in accordance with the provisions of 10 CFR 50.12, Specific exemptions, the licensee requested exemptions from certain requirements of 10 CFR 50.46(a)(1), and Appendix A, General Design Criteria for NuclearPower Plants, to 10 CFR Part 50, specifically General Design Criterion (GDC) 35, Emergency core cooling, GDC 38, Containment heat removal, and GDC 41, Containment atmosphere cleanup.
By letter dated May 11, 2021 (ADAMS Accession No. ML21130A588), the U.S. Nuclear Regulatory Commission (NRC) staff provided the results of the acceptance review as Unacceptable with Opportunity to Supplement, and included the request for supplemental information. In order to make the license amendment and regulatory exemptions application complete, the NRC staff requested that the licensee supplement the application to address the information requested in the enclosure of the letter by May 27, 2021, to enable the NRC staff to begin its detailed technical review. By letter dated May 27, 2021 (ADAMS Accession No. ML21147A222), the licensee submitted the requested supplemental information.
The purpose of this letter is to provide the results of the NRC staffs acceptance review of this amendment request and regulatory exemptions. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
F. Diya Consistent with 10 CFR 50.90, an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following, as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
Consistent with 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of the regulations of this part, which are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense, and security. The Commission will not consider granting an exemption unless special circumstances are present, as specified in Section 50.12(a)(2).
The NRC staff has reviewed your application and the supplemental information, and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal and discussions during the pre-licensing meeting on September 12, 2019 (meeting summary dated October 16, 2019 (ADAMS Accession No. ML19268A977)), the NRC staff has estimated that this licensing request will take approximately 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br /> for the license amendment request and 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> for the exemptions to complete. The NRC staff expects to complete this review in approximately 15 months, which is September 30, 2022. These estimates are based on the NRC staffs initial review of the application, and they could change due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Any significant changes in the forecasted hours and/or the forecasted completion date, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
If you have any questions regarding this matter, please contact me at 301-415-8371 or via e-mail at Mahesh.Chawla@nrc.gov.
Sincerely,
/RA/
Mahesh L. Chawla, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: Listserv
ML21160A148 *by e-mail OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DSS/STSB/BC(A)*
NAME MChawla PBlechman NJordan DATE 6/9/2021 6/9/2021 6/10/2021 OFFICE NRR/DEX/ESEB/BC* NRR/DNRL/NCSG/BC* NRR/DRA/APLB/BC(A)*
NAME JColaccino SBloom SVasavada DATE 6/10/2021 6/10/2021 6/10/2021 OFFICE NRR/DNRL/NVIB/BC(A)* NMSS/REFS/ERLRB/(BC)* NRR/DORL/LPL4/BC*
NAME DWidrewitz RElliott JDixon-Herrity (SLee for)
DATE 6/10/2021 6/10/2021 6/10/2021 OFFICE NRR/DORL/LPL4/PM*
NAME MChawla DATE 6/10/2021