ML21245A276
From kanterella
Letter Sequence Withholding Request Acceptance | |
---|---|
EPID:L-2021-LRO-0010, License Renewal (Open) | |
MONTHYEARML21069A3052021-03-10010 March 2021
[Table View]Submittal of MRP-227-A Applicant/Licensee Action Item 7 Analysis for Davis-Besse Nuclear Power Station Unit 1 Project stage: Request ML21245A2762021-09-13013 September 2021 Request for Withholding Information Regarding an Analysis of Reactor Vessel Internal Components Project stage: Withholding Request Acceptance ML21322A2892021-12-0909 December 2021 Approval of Plant-Specific Analysis of Certain Reactor Vessel Internal Components in Accordance with License Renewal Commitment No. 53 Project stage: Other 2021-03-10 |
ML21245A276 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 09/13/2021 |
From: | Blake Purnell Plant Licensing Branch III |
To: | Tony Brown Energy Harbor Nuclear Corp |
Purnell B | |
References | |
EPID L-2021-LRO-0010 | |
Download: ML21245A276 (3) | |
Similar Documents at Davis Besse | |
---|---|
Category:Letter
MONTHYEARL-24-233, Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-12-18018 December 2024
[Table view]Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles L-24-259, ISFSI; Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI & Perry Nuclear Power Plant, Unit No. 1 ISFSI - Triennial ISFSI Decommissioning Funding Plan2024-12-17017 December 2024 ISFSI; Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI & Perry Nuclear Power Plant, Unit No. 1 ISFSI - Triennial ISFSI Decommissioning Funding Plan 05000346/LER-2021-001-02, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-12-0909 December 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground IR 05000346/20240102024-12-0606 December 2024 Comprehensive Engineering Team Inspection Report 05000346/2024010 L-24-227, Response to Request for Additional Information for Relief Request RR-A 12024-11-20020 November 2024 Response to Request for Additional Information for Relief Request RR-A 1 IR 05000346/20244022024-11-19019 November 2024 Material Control and Accounting Program Inspection Report 05000346/2024402 (Public) IR 05000346/20240032024-11-14014 November 2024 Integrated Inspection Report 05000346/2024003 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components ML24338A0242024-10-0303 October 2024 MPR Associates, Inc. - Report in Accordance with 10 CFR Part 21 IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station 2024-09-06 Category:Proprietary Information Review MONTHYEARML23269A1242023-09-27027 September 2023
[Table view]– Request for Withholding Information from Public Disclosure ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 ML22305A5752022-11-0404 November 2022 Request for Withholding Information Regarding Reanalysis of the Protection Against Low Temperature Reactor Coolant System Overpressure Events ML21245A2762021-09-13013 September 2021 Request for Withholding Information Regarding an Analysis of Reactor Vessel Internal Components ML20128J2382020-05-26026 May 2020 Energy Harbor - Beaver Valley; Davis-Besse; and Perry - Request for Withholding Information from Public Disclosure Regarding Request for Threshold Determination ML20066J8452020-04-0606 April 2020 Energy Harbor - Beaver Valley Units No. 1 and 2; Davis-Besse Unit No. 1; and Perry Unit No. 1 - Request for Withholding Information from Public Disclosure Regarding Retrospective Premium Guarantee ML19273A0542019-12-0909 December 2019 Fenoc Fleet - Beaver Valley Power Station, Units 1 & 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 - Request for Withholding Information from Public Disclosure ML19080A0492019-04-10010 April 2019 FENOC - Beaver Valley Power Station, Unit 1 and 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Request for Withholding Information from Public Disclosure Regarding Retrospective Premium Guarantee ML17170A0642017-06-22022 June 2017 Request for Withholding Information from Public Disclosure ML16202A3762016-09-0909 September 2016 Request for Withholding Information from Public Disclosure ML16152A0592016-06-17017 June 2016 FENOC-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station Unit No. 1, Perry Nuclear Power Plant, Unit No. 1 - Request for Withholding Information from Public Disclosure (CAC Nos. MF7487, MF7488, MF7489 and MF74 ML15189A0562015-07-13013 July 2015 Proprietary Letter Areva Material Jan 13, 2015 ML1011905782010-06-0202 June 2010 Request for Withholding Information from Public Disclosure ML1011904312010-06-0202 June 2010 Request for Withholding Information from Public Disclosure - Letter Dated 4/16/2010 ML1002513792010-02-0101 February 2010 Request for Withholding Information from Public Disclosure ML0624104702006-09-15015 September 2006 Firstenergy Nuclear Operating Company (FENOC) Request for Withholding Information from Public Disclosure for Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1 and Perry, Unit 1 - Fenco Letter 8-15-06 ML0615702662006-06-16016 June 2006 Withholding from Public Disclosure, Proprietary Versions of Exhibits a & B to FENOC Letter L-06-071 Dated 05/30/2006, Containing Certain Financial Pro Forma Statements Anticipated Revenues from Sales ML0525100472005-09-14014 September 2005 Request for Withholding Information from the Public Disclosure ML0516101832005-06-20020 June 2005 Firstenergy Nuclear Operating Company Request for Withholding Information from Public Disclosure for Davis-Besse Nuclear Power Station, Unit No. 1 ML0516102062005-06-16016 June 2005 6/16/05, Firstenergy Nuclear Operating Co, Withholding from Public Disclosure, Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments for Beaver Valley, Units 1 and 2, Davis-Besse, Unit 1, and P ML0419705102004-07-14014 July 2004 Determine Proprietary Nature of Draft Slides Associated with the Davis-Besse Nuclear Power Station High Pressure Injection Pumps for Withholding Pursuant to 10 CFR 2.390 ML0322304022003-09-0808 September 2003 Withholding Information from Public Disclosure ML0318106242003-06-30030 June 2003 Withholding Information Public Disclosure, Draft Davis-Besse Safety Culture Evaluation Report and Presentation Slides ML0213705682002-06-11011 June 2002 Proprietary Letter Response for E-P Stress, Request for Withholding Information from Public Disclosure 2023-09-27 |
Text