Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 IR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report 2024-02-02
[Table view] Category:Proprietary Information Review
MONTHYEARML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 ML22318A2752022-12-16016 December 2022 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit 2 - 2R22 Steam Generator Tube Inspection 180 Day Report ML22305A5752022-11-0404 November 2022 Request for Withholding Information Regarding Reanalysis of the Protection Against Low Temperature Reactor Coolant System Overpressure Events ML22298A0012022-10-27027 October 2022 Request for Withholding Information from Public Disclosure for Beaver Valley, Units 1 and 2 License Amendment Request to Add Full Spectrum LOCA Methodology to COLR ML21245A2762021-09-13013 September 2021 Request for Withholding Information Regarding an Analysis of Reactor Vessel Internal Components ML20314A3192020-11-20020 November 2020 Request for Withholding Information from Public Disclosure ML20128J2382020-05-26026 May 2020 Energy Harbor - Beaver Valley; Davis-Besse; and Perry - Request for Withholding Information from Public Disclosure Regarding Request for Threshold Determination ML20066J8452020-04-0606 April 2020 Energy Harbor - Beaver Valley Units No. 1 and 2; Davis-Besse Unit No. 1; and Perry Unit No. 1 - Request for Withholding Information from Public Disclosure Regarding Retrospective Premium Guarantee ML19273A0542019-12-0909 December 2019 Fenoc Fleet - Beaver Valley Power Station, Units 1 & 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 - Request for Withholding Information from Public Disclosure ML19080A0492019-04-10010 April 2019 FENOC - Beaver Valley Power Station, Unit 1 and 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Request for Withholding Information from Public Disclosure Regarding Retrospective Premium Guarantee ML19070A2992019-03-14014 March 2019 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit 2 ML17170A0642017-06-22022 June 2017 Request for Withholding Information from Public Disclosure ML16344A0052016-12-16016 December 2016 Request for Withholding Information from Public Disclosure ML16202A3762016-09-0909 September 2016 Request for Withholding Information from Public Disclosure ML16152A0592016-06-17017 June 2016 FENOC-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station Unit No. 1, Perry Nuclear Power Plant, Unit No. 1 - Request for Withholding Information from Public Disclosure (CAC Nos. MF7487, MF7488, MF7489 and MF74 ML16040A3482016-02-17017 February 2016 Request for Withholding Information from Public Disclosure (CAC No. MF6512)(L-16-005) ML15352A2702016-01-11011 January 2016 Request for Withholding Information from Public Disclosure (L-15-350) ML15259A0752015-09-30030 September 2015 Request for Withholding Information from Public Disclosure (L-15-163) ML15204A3512015-07-28028 July 2015 Request for Withholding Information from Public Disclosure (TAC No. MF6412) (L-15-195) ML15189A0562015-07-13013 July 2015 Proprietary Letter Areva Material Jan 13, 2015 ML14304A6262014-11-24024 November 2014 Request for Withholding Information from Public Disclosure (TAC No. MF5007)(L-14-325) ML12233A3662012-08-29029 August 2012 Request for Withholding Information from Public Disclosure ML1105500902011-03-0404 March 2011 Request for Withholding Information from Public Disclosure, TAC No. ME4925 ML1105501812011-02-25025 February 2011 Request for Withholding Information from Public Disclosure ML1034001822010-12-10010 December 2010 Request for Withholding Information from Public Disclosure ML1011904312010-06-0202 June 2010 Request for Withholding Information from Public Disclosure - Letter Dated 4/16/2010 ML1011905782010-06-0202 June 2010 Request for Withholding Information from Public Disclosure ML1008407842010-04-15015 April 2010 Request for Withholding Information from Public Disclosure ML1002513792010-02-0101 February 2010 Request for Withholding Information from Public Disclosure ML0927000012009-10-0101 October 2009 Proprietary Information Sought to Be Withheld from Public Disclosure (MD9969) ML0835102802008-12-23023 December 2008 Westinghouse Electric Company-Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit No. 1 (TAC MD9970).Westinghouse Electric Company-Request for Withholding Information from Public Disclosure for B ML0809904992008-04-17017 April 2008 Westinghouse Electric Company - Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (Tac MD7531 and MD7532) ML0707306632007-03-28028 March 2007 Withholding from Public Disclosure, Armored Cable Test Results ML0624104702006-09-15015 September 2006 Firstenergy Nuclear Operating Company (FENOC) Request for Withholding Information from Public Disclosure for Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1 and Perry, Unit 1 - Fenco Letter 8-15-06 ML0615702662006-06-16016 June 2006 Withholding from Public Disclosure, Proprietary Versions of Exhibits a & B to FENOC Letter L-06-071 Dated 05/30/2006, Containing Certain Financial Pro Forma Statements Anticipated Revenues from Sales ML0610803382006-04-14014 April 2006 Withholding Letter to G Strambach, GE, GE Evaluation of OPRM Performance During Instability Events at Nine Mile Point Nuclear Station 2 and Perry Nuclear Power Plant (Mfn 06-089) ML0605901912006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) ML0605902302006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure ML0606002062006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) ML0604503422006-02-22022 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure Ffor Beaver Valley Power Station, Unit Nos. 1 and 2 ML0604503032006-02-16016 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 ML0603001382006-02-0606 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit No. 1 ML0603100312006-02-0606 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (TAC No. MC4645 and MC4646) ML0535301122005-12-23023 December 2005 Westinghouse Electric Company, LLC Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) (Tac Nos. MC4649 and MC4650) ML0525100472005-09-14014 September 2005 Davis-Besse, Unit 1 - Request for Withholding Information from the Public Disclosure L-05-151, August 24, 2005 Extended Power Uprate Meeting Presentation Material2005-09-0101 September 2005 August 24, 2005 Extended Power Uprate Meeting Presentation Material ML0516101832005-06-20020 June 2005 Davis-Besse - Firstenergy Nuclear Operating Company Request for Withholding Information from Public Disclosure for Davis-Besse Nuclear Power Station, Unit No. 1 2023-09-27
[Table view] |
Text
April 6, 2020 Mr. David B. Hamilton Senior Vice President and Chief Nuclear Officer Energy Harbor Nuclear Corp.
Mail Stop A-WAC-B2 341 White Pond Drive Akron, OH 44320-1119
SUBJECT:
ENERGY HARBOR - BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING RETROSPECTIVE PREMIUM GUARANTEE
Dear Mr. Hamilton:
By letter dated March 4, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20064C505), Energy Harbor Nuclear Corp (Energy Harbor, the licensee) submitted an affidavit dated March 3, 2020, executed by Darin M. Benyak, Vice President, Nuclear Support and Regulatory Affairs, Energy Harbor Nuclear Corp. and its affiliates, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 390(a)(4) and 10 CFR 9.17(a)(4):
Enclosure C, Energy Harbor Nuclear Generation LLC 2020, Internal Cash Flow Projection for Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1 (Proprietary)
(ADAMS Accession No. ML20064C506).
The following reasons were given in your affidavit for requesting our withholding of this information:
- 2. Energy Harbor Nuclear Corp. is providing information in support of its Retrospective Premium Guarantee submittal. The proprietary version of Enclosure C being provided in the submittal contains a 2020 cash flow projection for Energy Harbor Nuclear Generation, LLC and the projected revenue is based on the intercompany Power Supply Agreement dated February 27, 2020. This document constitutes proprietary commercial and financial information that should be held in confidence by the Nuclear Regulatory Commission (NRC) pursuant to the policy reflected in 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4), because:
- a. This information is and has been held in confidence by Energy Harbor Nuclear Corp. and its affiliates.
D. Hamilton b. This information is of a type that is held in confidence by Energy Harbor Nuclear Corp. and its affiliates, and there is a rational basis for doing so because the information contains sensitive financial competitive information concerning Energy Harbor Nuclear Generation, LLC's anticipated cash flow.
- e. Public disclosure of this information would create substantial harm to the competitive position of Energy Harbor Nuclear Generation, LLC by disclosing its internal cash flow.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, Enclosure C marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
The nonproprietary versions of Enclosure C (Enclosure A of the licensees March 4, 2020, submittal) has been placed in the NRCs Public Document Room and added to the ADAMS Public Electronic Reading Room (ADAMS Accession No. ML20064C505).
D. Hamilton If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc:
DAVIS-BESSE PERRY BEAVER VALLEY Mark B. Bezilla Frank R. Payne Rod L. Penfield Site Vice President Site Vice President Site Vice President Energy Harbor Nuclear Corp. Energy Harbor Nuclear Corp. Energy Harbor Nuclear Corp.
Davis-Besse Nuclear Power Station Perry Nuclear Power Plant Beaver Valley Power Station Mail Stop P-DB-3080 Mail Stop P-PY-A290 Mail Stop P-BV-SSB 5501 N. State Route 2 PO Box 97, P.O. Box 4, Route 168 Oak Harbor, OH 43449-9760 Perry, OH 44081-0097 Shippingport, PA 15077-0004 Listserv
ML20066J845 (*) By Email OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NMSS/REFS/FAB/BC*
NAME BVaidya SRohrer FMiller DATE 03/09/2020 03/09/2020 03/10/2020 OFFICE NRR/DORL/LPL3/BC* NRR/DORL/LPL3/PM NAME NSalgado (SWall for) BVaidya DATE 04/03/2020 04/06/2020