Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML16152A0592016-06-17017 June 2016 FENOC-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station Unit No. 1, Perry Nuclear Power Plant, Unit No. 1 - Request for Withholding Information from Public Disclosure (CAC Nos. MF7487, MF7488, MF7489 and MF74 Project stage: Withholding Request Acceptance 2016-06-17
[Table View] |
FENOC-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station Unit No. 1, Perry Nuclear Power Plant, Unit No. 1 - Request for Withholding Information from Public Disclosure (CAC Nos. MF7487, MF7488, MF7489 and MF74ML16152A059 |
Person / Time |
---|
Site: |
Beaver Valley, Davis Besse, Perry |
---|
Issue date: |
06/17/2016 |
---|
From: |
Bhalchandra Vaidya Plant Licensing Branch III |
---|
To: |
Belcher S FirstEnergy Nuclear Operating Co |
---|
Vaidya B |
References |
---|
CAC MF7487, CAC MF7488, CAC MF7489, CAC MF7490 |
Download: ML16152A059 (4) |
|
|
---|
Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 IR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 ML22318A2752022-12-16016 December 2022 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit 2 - 2R22 Steam Generator Tube Inspection 180 Day Report ML22305A5752022-11-0404 November 2022 Request for Withholding Information Regarding Reanalysis of the Protection Against Low Temperature Reactor Coolant System Overpressure Events ML22298A0012022-10-27027 October 2022 Request for Withholding Information from Public Disclosure for Beaver Valley, Units 1 and 2 License Amendment Request to Add Full Spectrum LOCA Methodology to COLR ML21245A2762021-09-13013 September 2021 Request for Withholding Information Regarding an Analysis of Reactor Vessel Internal Components ML20314A3192020-11-20020 November 2020 Request for Withholding Information from Public Disclosure ML20128J2382020-05-26026 May 2020 Energy Harbor - Beaver Valley; Davis-Besse; and Perry - Request for Withholding Information from Public Disclosure Regarding Request for Threshold Determination ML20066J8452020-04-0606 April 2020 Energy Harbor - Beaver Valley Units No. 1 and 2; Davis-Besse Unit No. 1; and Perry Unit No. 1 - Request for Withholding Information from Public Disclosure Regarding Retrospective Premium Guarantee ML19273A0542019-12-0909 December 2019 Fenoc Fleet - Beaver Valley Power Station, Units 1 & 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 - Request for Withholding Information from Public Disclosure ML19080A0492019-04-10010 April 2019 FENOC - Beaver Valley Power Station, Unit 1 and 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Request for Withholding Information from Public Disclosure Regarding Retrospective Premium Guarantee ML19070A2992019-03-14014 March 2019 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit 2 ML17170A0642017-06-22022 June 2017 Request for Withholding Information from Public Disclosure ML16344A0052016-12-16016 December 2016 Request for Withholding Information from Public Disclosure ML16202A3762016-09-0909 September 2016 Request for Withholding Information from Public Disclosure ML16152A0592016-06-17017 June 2016 FENOC-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station Unit No. 1, Perry Nuclear Power Plant, Unit No. 1 - Request for Withholding Information from Public Disclosure (CAC Nos. MF7487, MF7488, MF7489 and MF74 ML16040A3482016-02-17017 February 2016 Request for Withholding Information from Public Disclosure (CAC No. MF6512)(L-16-005) ML15352A2702016-01-11011 January 2016 Request for Withholding Information from Public Disclosure (L-15-350) ML15259A0752015-09-30030 September 2015 Request for Withholding Information from Public Disclosure (L-15-163) ML15204A3512015-07-28028 July 2015 Request for Withholding Information from Public Disclosure (TAC No. MF6412) (L-15-195) ML15189A0562015-07-13013 July 2015 Proprietary Letter Areva Material Jan 13, 2015 ML14304A6262014-11-24024 November 2014 Request for Withholding Information from Public Disclosure (TAC No. MF5007)(L-14-325) ML12233A3662012-08-29029 August 2012 Request for Withholding Information from Public Disclosure ML1105500902011-03-0404 March 2011 Request for Withholding Information from Public Disclosure, TAC No. ME4925 ML1105501812011-02-25025 February 2011 Request for Withholding Information from Public Disclosure ML1034001822010-12-10010 December 2010 Request for Withholding Information from Public Disclosure ML1011904312010-06-0202 June 2010 Request for Withholding Information from Public Disclosure - Letter Dated 4/16/2010 ML1011905782010-06-0202 June 2010 Request for Withholding Information from Public Disclosure ML1008407842010-04-15015 April 2010 Request for Withholding Information from Public Disclosure ML1002513792010-02-0101 February 2010 Request for Withholding Information from Public Disclosure ML0927000012009-10-0101 October 2009 Proprietary Information Sought to Be Withheld from Public Disclosure (MD9969) ML0835102802008-12-23023 December 2008 Westinghouse Electric Company-Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit No. 1 (TAC MD9970).Westinghouse Electric Company-Request for Withholding Information from Public Disclosure for B ML0809904992008-04-17017 April 2008 Westinghouse Electric Company - Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (Tac MD7531 and MD7532) ML0707306632007-03-28028 March 2007 Withholding from Public Disclosure, Armored Cable Test Results ML0624104702006-09-15015 September 2006 Firstenergy Nuclear Operating Company (FENOC) Request for Withholding Information from Public Disclosure for Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1 and Perry, Unit 1 - Fenco Letter 8-15-06 ML0615702662006-06-16016 June 2006 Withholding from Public Disclosure, Proprietary Versions of Exhibits a & B to FENOC Letter L-06-071 Dated 05/30/2006, Containing Certain Financial Pro Forma Statements Anticipated Revenues from Sales ML0610803382006-04-14014 April 2006 Withholding Letter to G Strambach, GE, GE Evaluation of OPRM Performance During Instability Events at Nine Mile Point Nuclear Station 2 and Perry Nuclear Power Plant (Mfn 06-089) ML0605902302006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure ML0605901912006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) ML0606002062006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) ML0604503422006-02-22022 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure Ffor Beaver Valley Power Station, Unit Nos. 1 and 2 ML0604503032006-02-16016 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 ML0603001382006-02-0606 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit No. 1 ML0603100312006-02-0606 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (TAC No. MC4645 and MC4646) ML0535301122005-12-23023 December 2005 Westinghouse Electric Company, LLC Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) (Tac Nos. MC4649 and MC4650) ML0525100472005-09-14014 September 2005 Davis-Besse, Unit 1 - Request for Withholding Information from the Public Disclosure L-05-151, August 24, 2005 Extended Power Uprate Meeting Presentation Material2005-09-0101 September 2005 August 24, 2005 Extended Power Uprate Meeting Presentation Material ML0516101832005-06-20020 June 2005 Davis-Besse - Firstenergy Nuclear Operating Company Request for Withholding Information from Public Disclosure for Davis-Besse Nuclear Power Station, Unit No. 1 2023-09-27
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 17, 2016 Mr. Samuel L. Belcher Senior Vice President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 341 White Pine Drive Akron, OH 44320
SUBJECT:
FENOC- BEAVER VALLEY POWER STATION, UNIT NOS. 1AND2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NOS. MF7487, MF7488, MF7489, AND MF7490)
Dear Mr. Belcher:
By letter dated March 2, 2016 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML16062A337), as supplemented by letter dated April 22, 2016 (ADAMS Package Accession No. ML16144A467), FirstEnergy Nuclear Operating Company (FENOC, the Licensee) submitted an affidavit dated April 22, 2016, executed by Gregory H. Halnon, Vice president, Regulatory Affairs and Laboratory Services, FirstEnergy Corp. (FE), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 1O of the Code of Federal Regulations (1 O CFR), Part 2, Section 2.390:
Enclosure C, FirstEnergy Corp. 2016 Internal Cash Flow Projection for Davis-Besse Unit No. 1, Perry Unit No. 1, And Beaver Valley Unit Nos. 1 and 2 Nuclear Power Plants, Letter dated April 22, 2016, from Gregory H. Halnon, Vice president, Regulatory Affairs and Laboratory Services, FirstEnergy Corp. (FE).
(ADAMS Accession No. ML16144A470).
The following reasons were given in your affidavit for requesting our withholding of this information:
- 2. FENOC is providing information in support of its "Retrospective Premium Guarantee" submittal. The proprietary version of Enclosure C being provided in the submittal contains a 2016 cash flow projection for FirstEnergy Corp. Unlike previous "Retrospective Premium Guarantee" submittals, the financial information contained in Enclosure C is proprietary since FirstEnergy Corp. has not released its earnings forecast for 2016.
S. L. Belcher 4. This document constitutes proprietary financial information that should be held in confidence by the Nuclear Regulatory Commission (NRG) pursuant to the policy reflected in 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4), because:
- a. This information is and has been held in confidence by FENOC and its affiliates.
- b. This information is of a type that is held in confidence by FENOC and its affiliates, and there is a rational basis for doing so because the information contains sensitive financial information concerning FirstEnergy Corp.'s anticipated cash flow.
- e. Public disclosure of this material non-public internal financial information would create substantial harm to FirstEnergy Corp. and its shareholders as this disclosure would not be accompanied by the typical disclaimers provided with projected financial information along with the necessary analysis and commentary to contextualize such projected financial information thus risking market abuse with respect to FirstEnergy Corp.'s common stock.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, Enclosure C marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRG). You also should understand that the NRG may have cause to review this determination in the future, tor example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRG makes a determination adverse to the above, you will be notified in advance of any public disclosure.
S. L. Belcher The nonproprietary versions of the licensee submittal (Enclosure A of the licensee's submittal, part of ADAMS Accession No. ML16144A468) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, Bhalchandra Vaidya, Project Manager Plant Licensing 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, 50-440 Distribution via Listserv
ML16144A468) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, IRA/
Bhalchandra Vaidya, Project Manager Plant Licensing 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, 50-440 Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F LPL3-2 R/F LPL 1-2 R/F RidsNrrDorlLpl3-1 Resource RidsOgcMailCenter Resource RidsNrrDorlLpl3-2 Resource RidsNrrDorlLpl1-2 Resource RidsRgn1 MailCenter RidsRgn3MailCenter RidsNrrPMDavisBesse Resource RidsNrrLASRohrer Resource RidsNrrPMPerry Resource RidsNrrLAMHenderson Resource RidsNrrPMBeavervalley Resource RidsNrrLALRonewicz Resource RidsNrrPMBVaidya Resource RidsAcrsAcnwMailCenter Resource ADAMS Accession No. ML16152A059 OFFICE LPL3-2/PM LPL3-2/LA DIAS/I FIB/BC OGC LPL3-2/BC(A) LPL3-2/PM NAME BVaidya SRohrer ABowers EMichel EMiller BVaidya DATE 5/31/16 5/31/16 6/7/16 6/15/16 6/17/16 6/17/16