Forwards Revised TS Pp,Proprietary W Ltr NSD-JLH-6384, non-proprietary W Ltr NSD-JLH-6385 & Affidavit Re Elevated Tube Sheet Laser Welded Sleeve TS Amend.Proprietary Ltr Withheld Per 10CFR2.790
ML20134G940
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/11/1996
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19353D969 List:
References
NUDOCS 9611130441
Download: ML20134G940 (2)


Text

Southern Nuclear Operating Company Post Offica Box 1295 l Bimungham. Alabama 35201  !

, T:lephone (205) B68-5131 j o.ve umy Southem Nudear Operating Company j Vice Pref.,ldent Farley Project me somem electnc sWem j November 11, 1996 i

l Docket No.: 50-364 10 CFR 50.90 l U. S. Nuclear Regulatory Commission I ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Elevated Tube Sheet Laser Welded Sleeve Technical Specification Amendment )

l Ladies and Gentlemen:

l By letter dated August 23,1996 as supplemented * - :tter dated November 6,1996, Southern Nuclear requested approval of an elevated tube - . laser welded sleeve technical specification amendment.  ;

I As a result of funher discussions with the NRC Staff, revised technical specification pages are l provided in Enclosure 1. These revised technical specification pages note that the elevated tube sheet sleeve technical specification amendment is for one cycle only for Unit 2.

Permanent, generic technical specification amendments for Westinghouse laser welded sleeves for Farley Units 1 and 2 will be submitted prior to the next Unit I refueling outage currently scheduled for Spring '97. This amendment will replace the Farley specific laser welded sleeve requirements currently in the technical specifications with the generic laser welded sleeve process. This will include updating the sleeve repair limits.

Additionally, Southern Nuclear letter dated November 6,1996 forwarded a copy of Westinghouse letter NSD-JLH-6202. This letter contained no proprietary markings.

Westinghouse, the owner of the information contained in the letter, has determined that parts of the letter are proprietary. Consequently, it is requested that the NRC Staff destroy all copies of Westinghouse letter NSD-JLII-6202.

Enclosure 2 contains Westinghouse lette NSD-JLII-6384 (proprietary) and NSD-JLli-6385 (non-proprietary) which contain the same mformation as Westinghouse letter NSD-JLH-6202.

The proprietary information for which withholding is being requested in Westinghouse letter NSD-JLH-6384 is further identified in aflidavit CAW-96-1040 (Enclosure 3), signed by the owner of the proprietary information, Westinghouse Electric Corporation. The aflidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10CFR Section 2.790 of the Commission's regulations.

Correspondence with respect to the proprietary aspects of the application for withholding or 9611130441 961111 PDR ADOCK 05000364 /j,. (

).$3U44 f( pl

% t]Ac fM I IW 4

O "

c -

the Westinghouse affidavit should reference CAW-96-1040 and should be addressed to Nicholas J. Liparuto, Manager, Nuclear Safety Regulatory & Licensing Activities.

Ifyou have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY m nf Dave Morey Sworn to and subscribed before me this //Y dayof fhurILt>1996 YbA o r ~ inf Notary Publil/ ,

My Commission Expires: MvMu /, /9 9 7

(.

REM:mafettssup2. doc

Enclosures:

1. Revised technical Specification Pager,
2. Westinghouse letters NSD-JLH-6384 and NSD-JLH-6385
3. Proprietary Affidavit CAW-96-1040 concerning Westinghouse letter NSD-JLH-6384 cc: Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident Inspector Mr. T. A. Reed, NRR - Materials and Chemical Engineering Branch Dr. D. E. Williamson, State Department of Public Health I