ML20140E704

From kanterella
Revision as of 16:36, 12 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Revised Application 133 to Amend License NPF-1,authorizing Changes to Tech Spec 3/4.1.3, Moveable Control Assemblies. Rev Forwarded Per Discussion Re 851101 License Change Application 133
ML20140E704
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/28/1986
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20140E709 List:
References
TAC-60094, NUDOCS 8602040059
Download: ML20140E704 (1)


Text

l PortlariciGeneral MicCoiivaily But D Wavrs Vre Pmim!

January 28, 1986 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN: Mr. Steven A. Varga Director, PWR-A Project Directorate No. 3 U.S. Nuclear Regulatory Commission Washington DC 20555

Dear Sir:

License Chanr.e Application 133 Per our previous discussion concerning License Change Application 133 originally submitted on November 1, 1985, attached is the final agreed-upon changes to Trojan Technical Specification 3/4.1.3, Hovable Control Assemblies. The word " presumed" has been removed from ACTION Cause of Inoperability Item c) and ACTION 4 has been changed to permit POWER OPERATION for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> vice 2 since the subites : already provide for additional time.

Sincerely,

4. E i Bart D. Withers Vice President Nuclear c: Mr. Lynn Frank, Director State of Oregon Department of Energy Mr. Michael J. Sykes Chairman of County Commissioners G602040059 D60120 PDR ADOCK 05000344 UUU g

P

)\

., :, wa ~ m ,~ ,, w a

.