MONTHYEARRC-99-0052, Vsns 1998 Annual Operating Rept. with1998-12-31031 December 1998 Vsns 1998 Annual Operating Rept. with RC-98-0060, VC Summer Nuclear Station 1997 Annual Operating Rept1997-12-31031 December 1997 VC Summer Nuclear Station 1997 Annual Operating Rept RC-98-0229, Fifteenth Annual 10CFR50.59 Rept for VC Summer Nuclear Station, for Period Ending 970806.With1997-08-0606 August 1997 Fifteenth Annual 10CFR50.59 Rept for VC Summer Nuclear Station, for Period Ending 970806.With RC-97-0043, VC Summer Nuclear Station 1996 Annual Operating Rept. W/1996-12-31031 December 1996 VC Summer Nuclear Station 1996 Annual Operating Rept. W/ RC-96-0048, 1995 Annual Operating Rept VC Summer Nuclear Station. W/1995-12-31031 December 1995 1995 Annual Operating Rept VC Summer Nuclear Station. W/ RC-95-0057, Annual Operating Rept for 1994 for VC Summer Nuclear Station Unit 11994-12-31031 December 1994 Annual Operating Rept for 1994 for VC Summer Nuclear Station Unit 1 ML20141M3001991-08-0606 August 1991 Ninth Annual 10CFR50.59 Rept for VC Summer Nuclear Station, for Period Ending 910806 ML20070G3011990-12-31031 December 1990 1990 Annual Operating Rept for VC Summer Nuclear Station, Unit 1 ML20012C5291989-12-31031 December 1989 1989 Annual Operating Rept for VC Summer Nuclear Station. W/900228 Ltr ML20043A1701989-08-0606 August 1989 Seventh Annual 10CFR50.59 Rept,Virgil C Summer Nuclear Station. W/900514 Ltr ML20236C4621988-12-31031 December 1988 1988 Annual Operating Rept for VC Summer Nuclear Station ML20247D2591988-08-0606 August 1988 Sixth Annual 10CFR50.59 Rept,Virgil C Summer Nuclear Station ML20147E1991987-12-31031 December 1987 1987 Annual Operating Rept,Virgil C Summer Nuclear Station ML20214E1281987-05-0707 May 1987 Fourth Annual 10CFR50.59 Rept VC Summer Nuclear Station ML20212E2801986-12-31031 December 1986 1986 Annual Operating Rept for South Caralina Electric & Gas 1998-12-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D6401999-10-31031 October 1999 Rev 2 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0202, Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With ML20216J4191999-09-24024 September 1999 Part 21 Rept Re 990806 Abb K-Line Breaker Defect After Repair.Vendor Notified of Shunt Trip Wiring Problem & Agreed to Modify Procedure for Refurbishment of Breakers RC-99-0180, Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression1999-09-0808 September 1999 Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression RC-99-0183, Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With ML20211K6161999-08-31031 August 1999 Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, Dtd Aug 1999 RC-99-0168, Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed1999-08-19019 August 1999 Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed ML20210M7071999-07-31031 July 1999 Rev 1 to VC Summer Nuclear Station COLR for Cycle 12 ML20211C2201999-07-31031 July 1999 Rev 1 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0163, Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0137, Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With ML20206H2971999-05-0505 May 1999 Part 21 Rept Re Common Mode Failure for magne-blast Breakers.Vc Summer Nuclear Station Utilizes These Breakers in Many Applications,Including 7.2-kV EDG Electrical Buses RC-99-0103, Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With ML20206K2421999-04-30030 April 1999 Rev 0 to COLR for Cycle 12 for Summer Nuclear Station RC-99-0087, Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory1999-04-15015 April 1999 Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory RC-99-0083, Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0063, Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced1999-03-26026 March 1999 Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced ML20196K5421999-03-22022 March 1999 Rev 2 to VC Summer Nuclear Station,Training Simulator Quadrennial Certification Rept,1996-99, Books 1 & 2. Page 2 of 2 Section 2.4.4 (Rev 2) of Incoming Submittal Were Not Included RC-99-0055, Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 9903121999-03-16016 March 1999 Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 990312 RC-99-0050, Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML20203F4511999-02-12012 February 1999 SER Finding Licensee Adequately Addressed GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Virgil C Summer Nuclear Station ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20206R5241998-12-31031 December 1998 Santee Cooper 1998 Annual Rept RC-99-0052, Vsns 1998 Annual Operating Rept. with1998-12-31031 December 1998 Vsns 1998 Annual Operating Rept. with RC-99-0004, Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With ML20206R5191998-12-31031 December 1998 Scana Corp 1998 Annual Rept ML20198F4241998-12-18018 December 1998 Safety Evaluation Granting Relief Request for Approval to Repair ASME Code Class 3 Service Water Piping Flaws in Accordance with GL 90-05 for VC Summer Nuclear Station RC-98-0223, Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method1998-12-16016 December 1998 Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method RC-98-0222, Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With ML20155G4551998-11-0404 November 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Use Code Case N-416-1 with Licensee Proposed Addl Exams RC-98-0208, Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With ML20207J5701998-10-31031 October 1998 Non-proprietary Rev 1 to WCAP-14955, Probabilistic & Economic Evaluation of Rv Closure Head Penetration Integrity for VC Summer Nuclear Plant ML20154Q9571998-10-21021 October 1998 SER Accepting Request Seeking Approval to Use Alternative Rules of ASME Code Case N-498-1 for Class 1,2 or 3 Sys ML20154K7901998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15101, Analysis of Capsule W from Sceg VC Summer Unit 1 Rv Radiation Surveillance Program RC-98-0184, Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With ML20154K8041998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15103, Evaluation of Pressurized Thermal Shock for VC Summer Unit 1 RC-98-0166, Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With ML20237A7181998-08-13013 August 1998 SER Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RC-98-0153, Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0131, Monthly Operating Rept for June 1998 for VC Summer Nuclear Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for VC Summer Nuclear Station ML20248J0191998-06-0404 June 1998 Safety Evaluation Accepting Licensee Inservice Testing Program Interim Pump Relief Request Per 10CFR50.55a(a)(3) (II) RC-98-0113, Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0100, Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 1 ML20217G7411998-04-22022 April 1998 Rev 1 to VC Summer Nuclear Station COLR for Cycle 11 RC-98-0076, Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure1998-04-17017 April 1998 Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure RC-98-0084, Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 1 ML20212H1421998-03-0202 March 1998 Interim Part 21 Rept SSH 98-002 Re EG-B Unit That Was Sent to Power Control Svcs for Determination of Instability & Refurbishment of a Dg.Cause of Speed Oscillations Unknown. Completed Hot Bore Checks on Power Case 1999-09-08
[Table view] |
Text
4, Y g y
yh, .
bi V
b' -
b~
. , A scANA COMPANY March 30, 1999 RC-99-0052 1
c
' U. S. Nuclear Regulatory Commission
, # fAttn: Document Control Desk
, ? Washington, DC 20555
- i.
Dear Gentlemen:
4 m i
Subject:
VIRGIL C. SUMMER NUCLEAR STATION v _
DOCKET NO. 50/395 (jtgg , OPERATING LICENSE NO. NPF-12 1 riceheiWenC ANNUAL OPERATING REPORT j
- hWeo10pemtions s
. : Enclosed is the 1998 Annual Operating Report for the South Carolina Electric &
! Gas Company Virgil C. Summer Nuclear Station Unit No.1. This report is being 7 -g j submitted in accordance with Technical Specifications 6.9.1.4,6.9.1.5, and 9 ?
{ Regulatory Guide 1.16.
ilf there are any questions, please call at your convenience. I l
Very truly yours, South bohm Dettm R Gas (o , L Virgil L Sununer Nudect Station f
- P.O. Box 88 ? g ,
lJenkinwille. South Carclina : !
( 3 065 Ga J. , lor j 5 8s3d43447' [ sbr /GJT ,
803:34B?07 i Attachment
' WYr# Kun0.t0m y ",' i c: J. L. Skolds W. F. Conway / j
{ '
R. R. Mahan (w/o attachments) R. J. White [I ( :
L. A. Reyes L. M. Padovan !
Mary L. Thomas (NRC) J. B. Knotts Jr.
D. L. Abstance Charleen T. Raddatz W. G. Wendland Marsh & McLennan !
NRC Resident inspector NSRC 4D7} ,
RTS (RR 8225) File (818.02-10)
DMS (RC-99-0052)
(.-
p h7 ""99040$0'362 981231~
[L , PDR ADOCK 05000395 1 R PDR
~uvu )gf u NUCLEAR EXCELLENCE - A SUMMER TRADITIONI Vp . '.
f? . '^
a hi.
9 4
e e
VIRGIL C. SUMMER NUCLEAR STATION m' ' ' ' ' '
~
' 'p; , . , , ;. . , . . .
+
,' 4
- . ', ~, . , , ,
- w' , .. ..
- .
- 4. ,
c; j',y'f,' ~ :.' w' ' '. ' . ...;y r
- ,*7. . , . ,
- '_ . . -
3 ; . > 4 k- _ -
y f,
? [
, s 4
- . e e. ...
LJ
, d '
es M
c '
u T 'T .
m.. , i
, , .. ,1 e .
l -
9
~ ' '
1998 ANNUAL OPERATING REPORT
PREFACE l The 1998 Annual Operating Report for the Virgil C. Summer Nuclear Station is hereby submitted in accordance with Technical Spec!fications 6.9.1.4, 6.9.1.5, and Regulatory Guide 1.16 under Docket Number 50/395 and Facility Operating License NPF-12.
I-
TABLE OF CONTENTS SECTION TITLE PAGE 1.0 Introduction 1 2.0 Operational Data 2 3.0 Operating Summary. 3 4.0 Exposures 4 5.0 Failed Fuel 5 ATTACHMENTS
- 1. Outages or Power Reductions Caused by Maintenance Activities ll. 1998 Man-Rem Report I
i
0 ANNUAL OPERATING REPORT
1.0 INTRODUCTION
The Virgil C. Summer Nuclear Station (VCSNS) utilizes a pressurized water reactor rated at 2900 MWT. The maximum dependable capacity is 954 Mwe.
The station is located approximately 26 miles northwest of Columbia, South Carolina.
2.0 OPERATIONAL DATA For the reporting period of January 1 through December 31,1998, the station operated at a capacity factor of 98.0 percent (using maximum dependable capacity) and a unit availability of 98.6 percent. The reactor was critical for a total of 8656.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, the generator remained on line 2638.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, and the total gross electrical energy generated for 1998 was 8,508,850 MWH.
3.0 OPERATING
SUMMARY
The Virgil C. Summer Nuclear Station (VCSNS) Unit No.1 operated at 100 percent from January 1 through January 2nd, when the plant was shutdown to perform repairs on the "A" Diesel Generator. Plant startup began on January 6th.
Power was restored to 100 percent on January 8th.
VCSNS operated at 100 percent power from January 8 through March 8th, when it was derated to 94 percent to repair a dearerator storage tank telief valve. Power was retumed to 100 percent on March 14th.
VCSNS operated at 100 percent power from March 14 through April 4th. On April 4th, the plant was derated to 87 percent to support testing of the main steam line safety relief valves. Power was retumed to 100 percent on April 4th.
VCSNS operated at 100 percent power from April 4 through May 28th. Power was reduced to 95 percent power on May 28th to support maintenance on the "C" and "D" feedwater booster pumps. Repairs were completed on May 29th and power was restored to 100 percent on May 30th.
VCSNS operated at 100 percent power from May 30 through June 4th, when power was briefly reduced to 97 percent to support the repair of a steam leak at a pressure switch that provides input to the control of the reheater drain tank emergency condenser dump valve. Repairs were completed on June 5th and power was restored to 100 percent.
g l' Annual Operating Report Page 2 of 2 VCSNS operated at 100 percani p c.; . in>m June 5 through July 9th, when power was reduced to 94 percent to support repairs of "D" Feedwater Booster Pump.
! Repairs w ' ere completed and power was restored to 100 percent on July 12th. On July 25th the plant was derated to 76 percent power due to the loss of a circulating l
water pump. Repairs to the pump were completed and power was restored to 100 '
percent on August 9th. 1 VCSNS operated at 100 percent power from August 9 through October 3rd.
l Power was reduced to 94.5 percent to support quarterly control valve testing.
- Power was restored to 100 percent on October 4th. !
'VCSNS operated at 100 percent power from October 4 through December 4th.
The plant was derated to 40 percent power to locate and plug a Condenser tube leak. Once the Water Box was isolated, power was increased to 72 percent. The tube leak was not located and power was restored to 100 percent on December 7th. Power remained at 100 percent until December 22nd. Power was reduced to 95 percent in response to increasing vibration on the 'D' Feedwater Booster Pump.
Power was restored to 100 percent on December 22,1998. The station operated at 100 percent for the remainder of 1998.
Maintenance Attachment I, " Power Reductions Caused by Maintenance Activities," provides !
more detailed information on operating time lost as a result of maintenance activities. ,
l 4.0 EXPOSURES Attachment ll consists of tables which list the r, umber of station, utility, and other personnel (including contract personnel) receiving exposures greate- than 100 i mrem / year and their associated man-rem exposure according to work and job '
function.
5.0 FAILED FUEL VCSNS has not had indication of failed fuel in 1998.
The reactor coolant system specific activity did not exceed the 1.0 microcuries per i gram dose equivalent iodine-131 specific activity or the 100/E microcuries per gram limits of Technical Specification 3.4.8, for this reporting period.
1 l
ATTACHMENT I TO l i
1998 ANNUAL REPORT
, , . < ':V )
W e
V V V e
V ne V
e v . c ,- , n,4 c.) e E E e E e o.,:v p ; c e g g g e e g 3 e c e e e c e
. M @ ;" a 1c 5 Ec E E 5 E a c' & c c A e
.s :, ,i. :.y .M 3 3 3 3 3 3
&, !. f, 'pywt+)q vy'r-ry; ~ yty.?o1m:- s ny.nyyr - swy newp e;'
~
gm ?~ v aue.mns
/ 4:'M , ; 1
( - ': .? . Q 7
c.w<E sC Err a w e w n w
1 ,.
j 'q, v i n y o::& -
s r ~,: : -
1
,7
- h. ..
Os$*% khdOd:Y, $0;d :id$lE& $.,%ON A6 M $-l5L %,Q Nk h, .EilM
E 2 2 2 2 2 2 2
,9 m., I I I I I I I I W y: en = o n o e*t e n 3 e e n o ao n n - n E e e ,-
w= v= n
'lh~ KMC;Yt"pn y "' " *
- .Ly:
', yy V;jp *79tT' ry , ;_ ? Y' W (*p ?t';r J:: -
' h4- WlE; 'i .:
., t
) (
a
T,-
a N 4
4
. ~
,N k ~_
s p l N % .h 'o ' ,N '
ll 1., { ';t . i. .L \ ,yl) h'h'
,t "w'
?.
e 4
? l .t .. f( . 7;. .,,, 1-, I (. ,,O, E se 'te i ,
dwa Ms wEaks mum ukc;&u Man sa%;a aukai l g 1 80 es O
es es so es so
( \ [ T "M+ ~
e5 4 &
ee C
o P & & P R
ce
<Q l
l As 4 -
A Q e
r e,.
so N
.- M"
%.;+ L .
4 **
7 _
'[3pe:
', l 1 , -
.J
-f[*TPrf PM % +])Tif-
.; - i ^
f'ij;yN@*W'& . p-il. 8 R$'J . '%', f "$ % ,y ? Y t % *f I'l' #W e,*$
A'
( Ai' J ^" n v
,gthl f:-
1 IL, s J' _ ' '1 fT ' ~
- g;fl.( , nrV -
< : ;O y: e n ,,"
I
'h y 9y ; -; 'a ,
o? + ; a ,.
w n t
- c. t :
L 2 yy: \
...-=q. ,
pi .M
' +
+
M.[ f,] (, ' '.c [ )'. j .$ t
't , .,
- c '1 4 .
i J,M((g f. ,. l '
,#4.-
,,{' ,
C . l( ,
, T
.7
. f s,- - A Uq , r g l
- a. ,
,a l% 7 '>
' ' ' [}
J
? ,.
'g' ;
y y,
'+ -
'- v '.
_t ...
"n.
' i t. : . .; h ' . , J ?.; y . . '% >
,, *. . : .~V g.; ' L r
" l N'
- , '
- . t k. r 5 w=
- p . a . -. ;w g; , .
,_ , -j a ?
?;{j
'.}
g gg };l g g w2 <A
%.dR 36 t9 ya5, gj (l}I s' n
1 l
p 6 / g ,
l
[
ij'- [.Y., , l=l._, .g
- ;r-] j] _7] _ _
ij __] QJ _ _ i]_
l v U O O I E O O O E
! g; t T f
, k.
A[y 3 I I z I I I I I a
- ~ ,p .:;;i :-
n ee 8 o N
ne N
e n g ;
>. . . .'N " '
1 O e e N N w= T '
3 ,.i.
,p p' ..
O o e- N N N o I
) 'l, ._ ^ * ' f N. fY %' Y f? ?! ?!.? s
. 4 y'l ' ' n a G: f w .
n
= - .
"~'
. l$,].l:- &. N I ! f. $5 [ __
h, L ,
i
- 6 ATTACHMENT ll TO 1998 ANNUAL REPORT I
I l
L I
~
l SOUTH CAROLINA ELECTRIC AND GAS CO. V.C. SUMMER NUCLEAR STATION
! PEOPLE COMPUTERIZED EXPOSURE NUCLEAR TRACKING SYSTEM PAGE 1 l CNTRPT PERG116R
-- 28-JAN-1999 08:47 l PERSONNEL AND MAN-REM BY WORK AND DUTY FUNCTION FINAL END OF YEAR REPORT FOR 1998 l ____..._____..________..___________________ .. ....__ ____..____________________
NUMBER OF PERSONNEL OVER 100 MREM TOTAL MAN-REM I
STATION UTILITY CONTRACT STATION UTILITY CONTRACT WORK AND JOB FUNCTION WORKERS WORKERS WORKERS WORKERS WORKERS WORKERS
\
I ROUTINE MAINTENANCE MAINTENANCE PERSONNEL
)
0 0 8 1.742 0.000 1.837 '
OPERATIONS PERSONNEL 0 0 1 0.353 0.000 0.597 HEALTH PHYSICS PERSONNEL 1 0 0 0.473 0.000 0.118 l SUPERVISORY PERSONNEL 0 0 0 0.017 0.000 0.002 ENGINEERING PERSONNEL 0 0 0 0.039 0.000 0.068 SPECIAL MAINTENANCE MAINTENANCE PERSONNEL 0 0 0 0.122 0.000 0.036 OPERATIONS PERSONNEL 0 0 0 0.059 0.000 0.031 HEALTH PHYSICS PERSONNEL 0 0 0 0.049 0.000 0.008 SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.003 0.000 0.065 REACTOR OPERATIONS & SURVEILLANCE MAINTENANCE PERSONNEL 0 0 0 0.274 0.000 0.341 OPERATIONS PERSONNEL 0 0 1 1.460 0.000 0.457 HEALTH PHYSICS PERSONNEL 5 0 1 1.263 0.000 0.433 SUPERVISORY PERSONNEL 0 0 0 0.049 0.000 0.009 ENGINEERING PERSONNEL 0 0 0 0.225 0.000 0.009 WASTE PROCESSING MAINTENANCE PERSONNEL 0 0 0 0.127 0.000 0.083 OPERATIONS PERSONNEL 0 0 0 0.007 0.000 0.022 HEALTH PHYSICS PERSONNEL 7 0 2 1.603 0.000 0.469 SUPERVISORY PERSONNEL 0 0 0 0.062 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.001 0.000 0.000 IN-SERVICE INSPECTION MAINTENANCE PERSONNEL 0 0 0 0.000 0.000 0.000 OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0 0 0 0.000 0.000 0.000 SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 EEFUELING MAINTENANCE PERSONNEL 0 0 0 0.000 0.000 0.000 OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0 0 0 0.000 0.000 0.000 SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 TOTALS MAINTENANCE PERSONNEL 0 0 8 2.265 0.000 2.297 OPERATIONS PERSONNEL 0 0 2 1.879 0.000 1.107 HEALTH PHYSICS PERSONNEL 13 0 3 3.388 0.000 1.028 l SUPERVISORY PERSONNEL 0 0 0 0.128 0.000 0.011 i ENGINEERING PERSONNEL 0 0 0 0.268 0.000 0.142 '
GRAND TOTAL 13 0 13 7.928 0.000 4.585 l
*********** END OF REPORT ***********