ML20215D187

From kanterella
Revision as of 09:45, 3 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Mod 9,increasing Level of Effort Under Task 9(i),to Review & Evaluation of Comanche Peak Program Plan
ML20215D187
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/08/1986
From: Moonan W, Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM), TELEDYNE ENGINEERING SERVICES
To:
Shared Package
ML20215D176 List:
References
CON-FIN-D-1338, CON-NRC-03-85-067, CON-NRC-3-85-67 NUDOCS 8612160248
Download: ML20215D187 (3)


Text

k t 3. CONTRACT #D CODE PAGE OF PAGE5 AMENDMENT OF SOLICITATION / MODIFICATION CF CONTR ACT 1

3. AMENDMENT /MODIFsCATION NO. 4.te FECTIVE DATE

[3

4. REQUISIT ION / PURCHASE REQ. No. S. PROJECT NO. (1/ opphro6ers 9 10/3/86 NRR-85-067 6.155'#ED SY 7. ADMINISTE RED SV (1/other then Jtem 6/ l US Nuclear Regulatory Comission Division of Contracts Washington, DC 20555
8. N AME AND ADDRESS OF CONT R ACTOR (No etreet, county, S tate and 11P Code) y) 9A. AMENDMENT OF SOLICIT AT TON NO.

Teledyne Engineering Services Attn: Mr. James Flaherty, Vice President 130 Second Avenue '*- ^5""'

Waltham, MA 00254 aoA. DIFICATION OF CONTRACT / ORDER X NRC-03-85-067 loe. DATLD (SEE ITEN 23)

CODE l FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specif ed for receipt of Offers is extended, is not em.

Cneed.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the sohcitation or es amended. by one of the following methods:

(el By completing items 8 and 15.end returning copies of the amendment: (b) By ocknowledging receipt of this amendment on each copy of the offe-submitted; or (c) By esperate letter or telegram which includes a reference to the sohcitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-MENT TO BE RECEIVED AT THE PLACE DEslGNATED FOR THE RECEIPT OF OFFERS prior TO THE HOUR AND DATE sPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change en offer already submitted such change may be made by selegram or ttier, provided each telegram or letter makes reference to the solicitation and this amendment and is received prior to the opening hour and date spe:ifeed.

12. ACCOUNT ANG AND APPROPRIATION DATA (J/ required)

B&R No. 20-19-40-41-2 FIN No. 01338 Increase: $20,625.41

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS.

IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

VI ^ MS cr N E C"o^n8gR N.l PUR5UANT TO: (specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON.

I " !,"A^*J,Touf.," U,";' Sin"Oi&IWh"#l'.'.5 P =ffA AN8" T JPA 'C U i%"Rh^?s " ' H"fi o"44."^""'5 *" " '"'" '" '"'"' ^

C. THIS SUPPLEMENTAL AGREEMENT 15 ENT ERED INTO PUR5UANT TO AUTHOR 4TY OF s

! X Mutual agreement of the parties D. OTHE R (specify ey,e of modificetion and autnors,,, 8612160248 861208 PDR CONTR NRC-03-85-067 PDR E. IMPORTANT: Contractor is not, b is required to sign this document and return Copies to the issuing office.

13. DESCRIPTsON OF MMENOMENT/MODIFICATlON (Orgentaed by UCFeretion headsnes. incivding scheiration/ contract suWect matter where feaslNr.)

The purpose of this modification is to increase the level of effort under Task 9 (1).

l Accordingly, the subject contract is modified as follows:

l

! l. Subsection B.2, under Section B - Supplies or Services and Prices / Costs, is deleted in its entirety and the following is substituted in lieu thereof:

Total Estimated Cost $f,026,012.74 Fixed Fee 102,448.67 l Total Estimated Cost Plus Fixed Fee 1,128,461.41 i e as provided herein, all terms and conditions of the document referenced In item 9A or loa.as heretofore changed, remains unchanged and in full force

, 3&A.NAME AND T4TLE OF SIGNER (Type orprint) 16A. N AME AND TITLE OF CONTR ACTING OFFICER (Type or pnnt;

/1'"'#^4' # "##"'"'

5 Elois J. Wiggins

& 1" 4' CwTrrecue 158. CONT R ACTOR /OF F E RO R 3 SC. DATE 58GN ED 16s. UNIT DSTAT 5 OF AME RICA 16C. DATE SIGNED v  %'

(Signature of pereon eethorised to eden) /&(/g, BY H< ll (Sagnitkre 61 CorQtsng Offneer)

},2

/

NSN 754043.[S2-8070 rga7 _ . _ _ _ _

. . C ntract No. NRC-03-85-067 h c, Modificatian No. 9 Page 2

2. Task 9 (1) under Subsection C.l.2 entitled Scope of Work as specified in Attachment A of Modification No. 4 is revised as follows:

Provide written and oral testimony as required at ASLB hearings related to Tasks 1(a) through 8(h) under the contract.

a. The level of effort for this task is increased from 1.75 staff months by 1.60 staff months to 3.35 staff months.
b. ' The additional effort is required as ASLB hearings related to the Comanche Peak Program Plan are to begin in the next few months. As a precursor to hearing commencement, the parties are permitted to submit interrogatories to solicit detailed information on items which will be discussed during the actual hearings. The NRC has recently received a large set of these interrogatories from the intervenor relative to the NRC's evaluation of the program plan. The NRC requires that the contractor address a subset of these questions in which TES staff provided direct support in the recent past. The major area of required assistance is quality control /

quality assurance; however, other areas requiring TES assistance may become apparent as the NRC proceeds with their responses to the specific interrogatories.

o 9 c. TES shall be required to provide detailed written responses to assigned questions on a quick, turn-around basis as required by the NRC Project Officer.

3. Subsection C.1.3 entitled Schedule and Level of Effort is revised to extend the completion date of the contract from November 30, 1986 to December 22, 1986.

> 4. Subsection C.2 entitled Meetings and Travel is revised to add the following line item.

u 11. It is anticipated that the following tripswill be required as part of the increased effort (1.60 staff months) under Task 9 (1):

s One three-day trip to Dallas, TX for one person Two one-day trips to Bethesda, MD for two people i; Two one-day trips to Bethesda, MD for one person

5. Paragraphs 1 and 3 under Subsection G.1 entitled Consideration, Estimated Cost, Fixed Fee and Obligation are revised as follows:

a 1. It is estimated that the total cost to the Government for full performance ll of this contract will be $1,128,461.41, of which the sum of $1,026,012.74 l represents the estimated reimbursable costs and of which $102,448.67' represents the fixed fee.

ll .

3. The amount presently obligated by the Government with respect to this

!; contract is $1,128,461.41.

l l}

- - - - - - . - ---.n.-,- - . - - - . . . _ , -n.------,_--,.,, - _ . , , . , , - . , -n n n ,_. ----- _ _,n,, - , ,--- ,. ---

- t

[,. . Ctntract No. NRC-03-85-067

) .-

Modificatian No'. 9 Page 3 l

I i

6. Subsection G.2 entitled Overhead / General and Administrative Rates is deleted l in its entirety and the following is substituted in lieu thereof: l A. Pending the establishment of final overhead rates which shall be negotiated based on an audit of actual costs, the contractor shall be reimbursed for

. allowable indirect costs hereunder at the provisional rate of 126.9 percent of direct labor for' the period June 10, 1985 through December 22, 1985. For the period December 23, 1985 through December 22, 1986, the contractor shall be reimbursed at a rate not to exceed the ceiling rate of 123.9 percent of direct labor. In no event shall the final audited rate exceed the ceiling rate herein established.

B. Pending the establishment of final general and administrative rates which shall be negotiated based on audit of actual costs, the contractor shall ,

be reimbursed for allowable indirect costs hereunder at the provisional I rate of 10.2 percent of total direct costs for the period June 10, 1985 l through December 22, 1985. For the period December 23, 1985 through December 22, 1986, the contractor shall be reimbursed at a rate not to ,

exceed the ceiling rate of 16.8 percent of total direct costs. I C. Notwithstanding A. and B. of this section, said provisional overhead and G&A rates may be adjusted as appropriate during the term of the contract upon acceptance of such revised rates by the Contracting Officer. However, subject to the final audit, ceiling rates can be adjusted downward, not

, upward, to reflect actual experienced rates.

All other terms and conditions set forth under this contract remain unchanged.

Note: Increase in ceiling from $1,107,836.00 by $20,625.41 to $1,128,461.41 is

/ inclusive of the $15,000.00. authorized by the Contracting Officer in a

{ telecon October 3,1986 between P. Edgeworth, NRC, and D. Landers, TES.

s l:

'i l'

'i i

~ .