ML20215G499

From kanterella
Jump to navigation Jump to search
Mod 8,extending Completion Date to 861130,to Review & Evaluation of Comanche Peak Program Plan
ML20215G499
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/09/1986
From: Flaherty J, Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM), TELEDYNE ENGINEERING SERVICES
To:
Shared Package
ML20215G496 List:
References
CON-FIN-D-1338, CON-NRC-03-85-067, CON-NRC-3-85-67 NUDOCS 8610200400
Download: ML20215G499 (2)


Text

.- -- -- - - .

4. CONT RACT AD CODE PAGE OF PAGES y AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 2 l

L AME NDMENT/MODeF 40 AT ION NO. 3 E6 F EC T eve DA1E 4. RE QueblT ION!&URCHA5L REO N O. S. PR OJE C1 NO. fJt arphreW ,

8 9/26/86 NRR-85-067

6. 455UED DV 7. ADMINISTE RED B4 fit other then Atem 6J [

U. S. Nuclear Regulatory Commission Division of Contracts W:shington, DC 20555

e. N AM E AND ADDRESS OF CONT R AC TOR ,uo., s,r,,, ,oun,3,3 t.,, and zie cod,, y, ,A. AMENDuENT OF SOLiCli ATiON NO.

Tsledyne Engineering Services Attn: Mr. James Flaherty, Vice President

96. DATED (SLL ITEM 2 2) 130 Second Avenue W21 tham, MA 00254 1C A. MODIF IC AT 40N OF CONT R ACT/OR DEE NO.

X NRC-03-85-067 100. DAT E D (SLL / TEM JJ)

CODE lF ACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set f orth in Item to The hour and date specified f or receipt of Offers is entended, is not eo t' nded.

Offe's msst ack no* ledge rece:ct of this amendment prior to the hout and date soe ified in the solicitation or as amended by one o' the following rnethods (al b ccmc'et.*g items 6 and 15. and retsen m; copies of the amendment. (b) By acknowed;M reteTt o' t*.is amend +e t on ea? ccov c' t'e c"e satmtte:. c ter b sepa att se tte c te e; am wMc*. includes a e'e eme to the s%citat.o- ame a ea: e9: a smte s F AILUR E Or YOUR ACKNO..1EO" UE*.T TC EE F ECElvED AT THE FLACE DESIGNATED FOR THE RECEIDT CF OF FERS PRIOR TC THE HOUR ANO OLTE SCECIFIED MAY RES.;C IN EEJECTIO*. CF YOUR OrF E R l' t e W tve c' t*ns ame . ament v os ces e tc change a- o"e a-eas satm tied. suct. e* av may te made by te e;*e :

Istte . r coce ea-*. tele; a r o lette me es re'e ence to the schc. tat.cn and this amendment, and is rece es p ice to the coe in; hose ans date spec Ae<'

12. ACCOUNiiNG AND APFROPRI AT 104 DAT A (11 reguareds N/A 13 THIS ITEf.' APPLIES ONLY TO MODIFICATIONS OF CONTR ACTS'ORDE RS.

IT MODIFIES THE CONTR ACT/ ORDER NO. AS DESCRIBED IN ITEM 14 g A. T His C HANGE OR DE R 15 IS5UE D PUR$UANT TO: CSpecif> euthont> J THE CHANGES SET FORTH IN 6T EM 14 ARE M ADE IN THE CON-TR ACT ORDER NO. IN ITEM 30A.

3. THE ABovE NUMBE RE D CON T R ACT/OR DE R 15 MODIFIED TO REF LECT THE ADMINIST R AT eve CHANGES (s.sch as cha' ires in paying off.cs appropriation date etc J 5ET FORTH IN ITEM ]4, PUR$U ANT TO THE AUTHORITY OF F AR 43.103(t).

C. TH65 $UPPLEMEN T AL AGREEMENT IS ENT ERED INTO PUR$UANT TO AUTHORITY OF s X The mutual agreement of the parties D. OTHL R ISpecuf> type of modafseetson a,nd authorsty p E. IMPORTANT: Contracta b is not, is reasred to sign this document and returr, Copies to the issuing of fice

&#, DESC RIPTsON OF AMENDMENT /MOOlF ICAT aON (Organued 63 E'CF section headmas, snedudmg schesterson/ contract setvert matter ahere frasa6.e /

The purpose of this modification is to extend the period of performance at no additional cost to the Government. The modification also changes the Project Officer. Accordingly, the following revisions are accomplished:

l l 1. Section C - Description / Specifications / Work Statement Subsection C.1.3 entitled Schedule and Level of Effort is revised to extend the completion date of the subject contract from September 30, 1986 to November 30, 1986.

8610200400 861009 PDR CONTR NRC-03-85-067 PDR Escret as provided herem, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force ErvJ 6'fect.

IS A. N AVE AND TIT LE OF StGNER (T>pe or print) 16A. N AME AND TIT LE OF CONT R ACT ING OF FICER (Type or pnett)

Elois J. Wiggins

. CON T R AC T O R/OF F E R R A SC. DAt E 58GNED FAME ICA 16C. D ATE 51GNE."

168. UNIT f D TATE f CS ne't u f pe to sagn) l0 '

sn tfeeo Co e i f - -

y i 4ssN 7540 01152-8070 30 105 ST ANDARD FORM 30 (REV.10-83.

L-x[Vlous EDITION UNUSABLE Prestr.oed t>y GS A

~

. 1

^

Modifirtion No. 8

. Co;trcet No. NRC-03-85-067 P g2 2 ef 2

2. Section G - Contract Administration Data subsection C.5 entitled Project Officer is revised as follows:

Delete: Goutam Bagchi, Mail Stop 316 Add: Chester Poslusny, Mail Stop P-522 All other terms and conditions set forth under this contract remain unchanged.

O e.

.