ML20151A064

From kanterella
Jump to navigation Jump to search
Mod 18,adding Incremental Funds,To Review & Evaluation of Comanche Peak Program Plan
ML20151A064
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/29/1988
From: Wiggins E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), TELEDYNE ENGINEERING SERVICES
To:
Shared Package
ML20151A054 List:
References
CON-FIN-B-1338, CON-NRC-03-85-067, CON-NRC-3-85-67 NUDOCS 8804060233
Download: ML20151A064 (2)


Text

.

o.

1. CON T RACT 10 COOL PAGL OF PAGL5 AMENDMENT OF SOLICITATION / MODIFICATION OF CONTHACT 1 l 2
2. AMENDMt.NT/MOOtFICnT 40N NO.'
3. EFF ECTivE DATE
4. R EQuist T ION /PU.4 CH ASC R EG, NO, S. PROJE.C.T NO. #f applacdle)

E.ighteen (18)

MAR 2 h 19ha OSP-85-067 dt'd 3/17/88 6.155UED BY

7. ADMINISTE RED BY G/ other then item 6),,

j U[S. Nuclear Regulatory. Commission Division 6f Contracts Washin.gton, 0,-C.

20555 r-

. 8. N AME AND ADORE 55 OF CON T RACTOR (No.. street county, stare end Elp Code) y)

9A. AMENOMENT OF SOLICITATlON NO.

~

Teledyne Engineering Services 130 Second AvsnUe ~

- So TEo fsrs m )

Walth'aw,- Massachusetts 00254 -

~

3CA:

OlF ICATION OF CONT R ACT/OROCR *

^

X NRC-03-85-067 lou. PATED (sEEl7EM JJJ CODE

] FACILITY COCE 6/10/86..

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS '

.The atiodrhterea solEita' tion is amended as set'forth1n Iterr'i I4. TN he'ur and.date spe.cifiod f'or.Not of Of5.rs. ' 'is e' t.endas '. '. *is not E x

z Offers rnust ackriowledge receiot of this' ameodment prio'r to the hour ' nd date specified in the solic'itation'or es ' rhende', by one dthe following methods:.

~

~

a d

a (a)'8y completing items 8 and 15. and returning copies of the amendment [(b) By ackn'owledging receipt of this' amendment on each copy bf the'of fer submitted; or (c) By separate lettes or telegram which indudes a reference to the solicitation and amendment numbers. FAILURE.OF YOUR ACKNOWLFDG.

MENT TO.BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECElPT OF OFFERS PRIOR TO THE HOUR AND DATE sPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue c' *his amendment you desire to change an of fer already submitted,such change may be made by telegram or letter. provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specif eed.

12. ACCOUNTING AND APPROPRI ATION DAT A glirequired!

.B1338 Obl iga'te: 535,000.00

.B&R No.: 86-19-02 APPN No.-:

31 X0200.'868.

FIN No.:

13. THIS ITEM APPLIES ONLY TO MODIFICATIONSOF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO:AS DESCRIBED IN ITEM 14

" ' ' ' ~ " " ' " ' " " " ' ' ^ " ' " ^ " " ' " ' ' " ~

^?a's"tRTR N@, lt e'JYR """'"^"' ' '8"'"*"'"""."""^"

v>

' O. THE ABOVE NUMBE REO CONTR ACT/ ORDER IS MOOlFiED'TO REFLECT THE. ADMINISTR Af tVE CHANGES ($ch as chenics in payiat ottite, appropriation date, etc.) SET FORTH IN ITEM 14. PUR$U ANT TO _THE. AUTHORIT Y OF FAR.43.103(b).'

C. THIS SUP*LEMEN T AL AG RE E MEN,T 15 EN T ((R ED INT O PUR$U AN T T O AU T HO.RIT Y O.F s.

X "Clause 52.232-22 "Limita1! ion of Funds" O. O r HE R < spa,1, t,ce or mosataa t on and autherats>

E. IMPORTANT: Contractor b is not,.

is required to sigri this document and return copies to the i$ suing othCe.

TT"OESCRiPT TON OF AMENOMEN TtMOO1FIC AT SON torganard by UCh'sectson headtnis, nneluding schettatsontcontreet subinet matter uhere fraub:e.)

This modification is issued to add incremental funding in the amount of $35,000.00 which increases the amount obligated by the Nuclear Regulatory Commission from $1,753,836.00 to $1,788,836.00. Accordingly,,this contract is modified as' follows:

1.

. Subsection G.1, Consideration and Obligation, Paragraph No. 2.is deleted in its entirety and the following Pdragraph.Nu. 2 is substituted in lieu thereof:

2 ~. The. amount presently obligated with respect fo this contract is increased -

by $35,000.00 from. 51,753,836.00 to $'1,788,836.00.n The Contracting.0fficer

.Exce.pt as provided herein, all terms and conditions of the document'ref'erenced la item 9A or 10A. as heretofore Changed. remains unchan9ed nd neci.

13A. N AME AND T4TLE OF SIGNER (Type or prf at) 16A. N AME AND T tT LE OF CON T RAC TtNG OF F ICER (Type or pnnt)

EIois J. Wiggins

. lS e. CON T R AC T ON/OF F EHO R 15C. DAT L 51GNEO 160. UNfik O ST A T E5 0F AME RIC A

~

16C. O A1C SIGN E D YYY 34'k').

ov

/

<s. unarm or per.on..tneurd uo..unJ

<sionerere or ce fJtma Ottwara N5u Tsaoos.tS2 soio 9804060233 880329 STANDARD FOW WRW.10 e 3)

Prentebed by GS A PR[vtOUS EDITtON UNU$AULE

  • g pn F AR (48 CF H) 5124 3 n

NRC-03-B5-Ob7 PDR

4 NRC-03-85-067 Modification No.18 Page 2 of.2 may issue orders for. work up to the amount. presently obligated. This obligation. amount may be unil.aterall ;'incre.ased from. time to timejby the

. Contracting'0fficer.by written' modification.to this contract.. The.'

. obligation amount;shall,'at no time, exceed 'the. contract ceiling.;as specified iri Paragraph 1'above; When 'and'if 'the ~ amount (s) paid arid-

~

~

~

payable to the Contractor hereunder shall. equal the obligation amount, the Contractor not be obl~igated to continue performance (,f the work unless and until the Contracting Officer shall increase the amount obligated with respect to this contract.- Any' work undertaken by the Contractor'in excess of. th'e.. obligation.' amount specified.above is done, at the Contractor's. sole risk?! '

~

~

This increased obligation in no way increases the total contracting ceiling which shall remain at $2,191,432.40.

All other terms and conditions of this contract remain unchanged.

i

~