- 8. CONT AACT eO CODE PAGE OF PAGES AMENOMENT CF SOLICITATION / MODIFICATION OF CONTRACT 1
g 4
- 2. AMENOMENT/MODIFICATeOes PeO.
3.EFFECTlyE DATE
- 4. REQutSaTION/PURC 4ASE REQ. PsO.
S. PROJECT No. #f ePalace64e) 5' 3 ////yd RFPA No. NRR-85-067
%.esseeto eY
/ /
F. ADMINISTEREO SY #f orher shenliens 4) l US Nuclear Regulatory Comission Division of Contracts Washington, DC 20555 e.NAME ANO ADORE.55 OF CONTRACTOR (No efreet coasney.Sasse and 2.JP Cede) y)
9A. AMENOMENT OF SOLICIT ATION NO.
Teledyne Engineering Services Attn: Mr. James Flaherty, Vice President es. oATEo rsas sTEst e si 130 Second Avenue Waltham, MA 00254 soA. girtCATiON OF CONTaACTiOROEa X
NRC-03-85-067 108. DATED (SER ETEN 23)
CODE l FACILITY CODE 12/11/85
- 11. THis ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The ahone numbered solicitation le amended as set forth in tem 14. The hour and date specified for roosipt of Offers le ananded, le not on.
Med.d.
Oftere must ackfiouutedse suosipt of this amendment prior to Wuo hour and dets spectfled in Wie solicitation or as amended,by one of the follovveng methods:
1 1 sv comp 6.une home e and is. nd rom. mans copies of the amendment: the my ackno viede.no ressant of ihas amendment on each empy of the ofter aubmitted; or le) By esperses Intter or telayam tuhich incdudes a reference to Wie sooncitation and omsidment numbers. FAILURE OF YOUR ACKNowLEDG.
MENT TO BE RECElVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PalOR TO THE HOUR AND DATE SPECIFIED MAY RESULT l IN FIEJECTION OF YOUR OFFER. If by virtue of thle amendment you desire to change en offer streedy ashmitted.euch change may be made by telegram or letter.provided each teleyam or letter makes referenos to the soucitadon and smin amendment. nd le recohed prior to the openitie hour and dote specified
- 12. ACCOUNTING AND APPROPRIATION DATA #Tsoested)
B&R No. 20-19-40-41-1 FIN No. D-1338 Increase: $75,308.00
- 13. THIS ITEM APPLIES ONLY TO MOOlFICATIONS OF CONTRACTS / ORDERS, IT MOOlFIESTHE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
y) A.QlS[
E,0 PURSUANT TO: Speary emSherity) THE CHANGE 5 SET FORTH IN STEM 14 ARE MADE IN THE Com "0N#.Jo'Um"!f,",'.ET?"OL" TENT #".'.',UE' API 8?Jn*#,4'#TVl'i'n'il'in'e"44."^"*** '"" *'*"*** *""
C. THis $UPPLEMENTAL AGREEMENT SS ENTEREO INTO PURSUANT TO AUTHOR 4TY OFs O.OTHER Opeetty type eras
^* ^'- - nd eendnerity) a X
Mutual agreement of the parties E
E. IMPORTANT: Contractor is not.
is required to sign this docurnent and return b
copees to the issuing office.
- 14. DESCRIPTION OF AMEi.simiENT/MODIFICATDON i Dy UCFesedless needense. testudene -' ~ ^^ thisempeet smoteur ashore Alpesteer,J The purpose of this modification is to revise task (e), which was incorporated into the above numbered contract by Modification No. 4.
Accordingly, the Comission accepts Teledyne Engineering Services' (TES) technical proposal dated January 13, 1986 No. PR-6690(c).
8604040482 860319 PDR CONTR NRC-03-85-067 PDR E
as prowteed hereen, all terme one eenelteene of the escassnent re8erenced la Otesse SA er 10A es leerstefore theneed, someins unchensed and in fesel force 15A. NAME AND TITLE OF SIGNER (Fype orprisst) 16A.NAME AND TITLE OF CONTRACTi>8G OFFICER (Type erprint)
Neu rsd 5'. AMWen/
Paul J. Edgeworth V.se t' drarAVu.ee ISS. CONTRACTOR /OPPEROR 15C.DATE 50GNED 148. 0 m STAT S OF ERICA 16C.OATE ssGNED
.1l/ f ale'.1g.s.e e OrRe.r>
jb//L I
f BY alsne e..en -,o a.R.,
~
~
.T A
,0 4.s Av. m.i Pe.$.T m..,.
t
'"maus 'o'naa vau=A='e
" -
- a* **A
j Modification No. 5 Contract No. NRC-03-85-067 Page 2 Verbal negotiations were held on March 4,1985 concerning the cost proposal between Mr. John Cragin, TES and Ms. Deborah Hawkins, Contract Administrator, NRC. The verbal negotiations are hereby finalized and incorporated into the contract by this modification. Therefore, the above-numbered contract is modified as follows:
1.
Section B - Supplies or Services and Prices / Costs, is revised as follows:
B.2 A., is deleted in its entirety and the following is substituted in lieu thereof:
"A.
Total Estimated Cos t........................... $1,007,125.00 Fixed Fee.......................................
100,711.00 '
Total Estimated Cost Plus Fixed Fee............. 1,107,836.00" 2.
Section C - Description / Specification / Work Statement, is revised as follows: Ref: Modification No. 4 C.I.2 entitled Scope of Work, as specified in Attachment A of Modification No. 4 is revised to increase the level-of-effort under Task 5(e). Accordingly, Task 5(e) Revised, shall' read-Task (e) of that RFP described the work requirements as follows:
Conduct an audit of the implementation of Comanche Peak, QA design review activities. This will include comparison of a sample of as-built installations with design configurations for all disciplines. This task
)
will run from March 12, 1986 through-September 30, 1986, and will require a maximum of 2 audits per month with a staff of 4 engineers per audit.
1 The engineering disciplines will be civil / structural, pipe support, mechanical systems and components, and electrical instrumentation and control. Audits will be conducted at the site in Glen Rose, Texas or at Gibbs and Hill offices in New York City and will last a maximum of 5 days per audit. The estimated level of effort is 320 staff days.
The December 11, 1985 NRC Request increases the level of effort for this task (e) by.5 staff years plus necessary travel expenses. Based on the TES understanding of the effort involved, TES has proposed herein on providing only a supplement of.3 staff years. This additional support is required to address the large number of detailed applicant responses to concerns about the Design Adequacy Program, the Construction Adequacy Program and the Issue Specific Action Plan. This additional effort will involve mechanical, electrical and instrumentation and control systems disciplines.
C.1.3 entitled Schedule and Level of Effort, is revised to extend the completion date of Task 5(e) from August 15, 1986 to September 30, 1986
Modification No. 5 Contract No. NRC-03-85-067 Page 3 Task 5(e)
Estimated Level of Effort, FY86 19 staff months Completion Date September 30, 1986 C.2 entitled Meetings and Travel is deleted in its entirety and the following is substituted in lieu thereof:
"C.2 Meetings and Travel 1.
Glen Rose, Texas -
2 trips, 5 people for 4 days 4 trips, 5 people for 5 day:
5 trips, 5 people for 5 days (Consultant) 5 trips,1 person for 5 days (Consultant) 2 trips, 3 people for 4 days 2.
Bethesda, Maryland - 8 trips, 3 people for 3 days 5 trips,1 person for 1 day 6 trips,1 person for 1 day 4 trips, 4 people for 2' days (Consultant) 2 trips,.3 people for 3 days 3.
Champaign, Illinois - 2 trips, 2 people for 2 days 4.
New York - 3 trips, 4 people for 3 days 5.
Cedar Rapids, Iowa to Bethesda - 3 trips, I person for 5 days 6.
Cedar Rapids, Iowa to San Francisco - 1 trip,1 person for 5 days 7.
Boston to Dallas, Texas - 3 trips, 3 persons for 4 days 8.
Boston to San Francisco - 2 trips, 5 people for 4 days 9.
Boston to New York - 3 trips, 4 people for 3 days 10.
Boston, Massachusetts - (Consultant) 2 trips, 3 people for 3 days" 3.
Section G - Contract Administration Data, Item G.I. entitled Consideration, Estimated Cost, Fixed Fee and Obligation, the following changes are made:
Paragraph 1 - Delete: $1,032,528.00 Insert: $1,107,836.00 Delete: $ 938,663.00 Insert: $1,007,125.00 Delete: $
93,865.00 Insert: $ 100,711.00
+
Modification No. 5 Contract No. NRC-03-85-067 Page 4 Section G.I. entitled Consideration, Estimated Cost, kixed Fee and Obligation, is revised as follows:
Paragraph 3 is deleted in its entirety and the following is substituted in lieu thereof:
"3.
The amount presently obligated by the Government with respect to this contract is $1,107,836.00.
It is anticipated that present funding will enable the contractor to perform through September 30, 1986."