- 1. Coed 1 R AC T 40 CODE PAGE OF PAGLS 6
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1
l 4
- 2. AMEMOMEHT/ MODIFICATION NO,
- 3. EF FECTIVE DAT E
- 4. H EQUISIT60N/PVHCHASE REQ, NO, 5, PROJECT NO. (1/ opplicable)
Fourteen
//~)/g ')
RFPA SP0-85-067 6.1SSUEO oY
/ /
?. ADMINISTERED OY (1/ other than item 6) l U.S. Nuclear Regulatory Commission Division of Contracts Washington, D.C.
20555
- 8. N AME AND ADOHESS OF CON T RAC TOR (No.. street, coun ty, Sta te and Zlf Code)
(g) 9A. AMENOMENT OF SOLICITATION NO.
Teledyne Engineering Services 130 Second Avenue
'"- ^ (8#8 "8" ">
Waltham, Massachusetts 00254 10A, MOOlFICATION OF CONTR ACT/ ORDER NO,
~
X NRC-03-85-067 SoU. DAT 00 (SEE ITEM 13) l CODE l FACILITY CODE 6/10/85 11, THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered so'icitation is amended as set forth in item 14. The hout and date specified for receipt of Of fers is em tended, is not ex-tended.
Of fers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
l (a) By completino items 8 and 15. and s eturning copies of the amendment; (b) By Acknowledging receipt of this amendment on each copy of the of fer i
submitted; or (c) By separate letter or telegram which includes a raference to the schcitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN hEJECTION OF YOUR OF F ER. If by vertue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation anCf this amendment, and is received prior to the opening hour and date specified.
- 12. A. COUNT ING AN D APPROPHI AllON DAT A (1/ reg s ired)
AMounL FIN: 01338 B&R No.: 86-19-02 APPN Symbol: 31X0200.867 Obligated: $260,000.00
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTn ACT/ ORDER NO. AS DESCRIBED IN ITEM 14.
A, T HIS C H ANGE OH DE H IS ISSUE D PUHSU AN I TO. (S pe ct / au rwrity)
g T H ACT OR DE H NO. IN 4 T E M 10 A.
H. THE AHOVE NUMUE HED CONTH ACT/OROC H IS MOctFtED TO RE rLECT THE ADMINIST R ATIVC CHANGES (such as changes in paying office, oppropraalan date, e tc j SET r O R T H IN IT E M 14, PU R SU AN1 TO T HE AUT HORITY Or FAR 43103(td.
I'., T til5 SUPPL E MEN T A L AG Hf L M L N T IS E NT E R E D 1r fl O pus <5U A N T TO AUTHOHITY OF:
X Changes Clause No. 52-243-2, mutual agreement of the parties, and proposal dtd 7/23/87 M O O r H a m r a u w..,,,,,
2,n a.m,. ru w I
E IMPORT ANT; Contractor b n not.
'> required to 99n as docurnent and retuTn
_,,_ copas to 1ny,s U;ng o,,,cc 2
} a. DESC HIPTlON OF AM\\ NOMEN T MOOW lC A1lO'4 rOrgann:cd by UCY uction headings. encludmg sohentataanican tract sno bject matter where feasn bW )
i The purpose of this modification is to provide additional funds, revise the estimated level of effort for four tasks within the contract, add an additional task, and to extend the period of performance. Accordingly, this contract is modified as follows:
i 1.
In Subsection G.1 Consideration and Obligation, Paragraph No. 2 is deleted in its entirety and the following ParagrapTi No. 2 Ts substituted in lieu thereof:
i "2.
The amount presently obligated with respect to thi,s contract is increased by
$260,000.00 from $1,254,836.00 to $1,514,836.00 The Contracting Officer may issue orders for. work up to the amount presently obligated. This obligation Eucpt ' s pro vided herein,'all term's and'condillons of the cocument referenceo in item 9A on l'OA, as, heretofore changed, remains unchanged and in f uH force a
and ef fect, NT RACTIN9 OFFeCE6 (Type or, print)-
t$A. N,AME AND TITLE OF SIGNER (Type or print),
16Alf IdT hOfdf.
' ;. L dO AN
- 47;N
, ~.
DWMt> E LWOtes PRAubNY
[Elois0.Wiggin's l
o.
CONTRP.CTOL OF rEROR l' LSC, DA'f L SIG N ED Jta.
T S T.A ES OF AMER)CA'
, 16C.QATb SIGNED lR. h Y
h I ' LQht, ey w
r'
?:
s,i,q,
.($Qtnature of person puthorUed to, eign).,
nature, oyo'ntractint X.lfficer). s, '
s
.o, i* O WAoM Oh08280019 870814 iog '
- ' STANDARD f0RM30'(n[v/10 83)
Prescau>eoy CSA 3
.PAEVIOttS EO PDR CONTR C{ R) 53.24 3
FAR a
NRC-03-85-067 PDR t
NRC-03-85-067 Modification No.14 Page 2 of 4 amount may be unilaterally increased from time to time by the Contracting Officer by written modification to this contract. The obligation amount shall, at no time, exceed the contract ceiling as specified in Paragraph 1 above.
When and if the amount (s) paid and i
payable to the Contractor hereunder shall equal the obiigation i
amount, the Contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this contract.
Any work undertaken by the Contractor in excess of the obligation l
amouht specified above is done so at the Contractor's sole risk."
This increased obligation in no way increases the total contract i
ceiling which shall remain at $2,191,432.40.
2.
In subsection C.1.3. Work Requirements, the estimated level of effort for the following four tasks are revised:
a.
Task 4(d). The estimated level of effort is reduced oy 28 staff weeks from 30 staff weeks to 2 staff weeks.
b.
Task 5(e).
The estimated level of effort is reduced by 28 staff weeks from 40 staff weeks to 12 staff weeks.
t c.
Task 8(h).
The estimated level of effort is reduced by 46 staff weeks from 140 staff weeks to 94 staff weeks.
d.
Task 13. The estimated level of effort is reduced by 4 staff weeks from 16 staff weeks to 12 staf f weeks.
3.
In Subsection C.1.3, Work Requirements, the following new task area is added:
" Task 14 - Review Comanche Peak Corrective Action Program (CAP).
Conduct reviews and audits of design activities associated with selected portions of the CAP.
For each design area, a review will be performed of the applicable Generic Technical Issue Report, selected Design Validation Packages, and Project Status Reports.
Reviews and audits will be conducted at the site in Glen Rose, Texas, at the Stone & Webster Engineering Corporation offices in Cherry Hill, New Jersey, Houston, Texas, and New York, New York, at the Ebasco offices in New York, New York, and at the Impell offices in Walnut Creek, California.
The Contractor will summarize findings in a Technical Evaluation Report for each design area of review. ASLB hearing support will be provided for HVAC review.
Estimated Level of Effort = 106 man-weeks."
NRC-03-85-067 Modification No. 14 Page 3 of 4 The total estimated level of effort remains unchanged at 300 staff weeks for performance of work under this modification.
4.
The Period of Performance in Subsection C.I.4 entitled, Level of Effort and Period of Performance is extended from September 30, 1987 to August 31, 1988.
5.
Subsection C.2 entitled, Meetings and Travel is revised to reflect the estimated travel for all task orders issued during FY 1987:
a.
Bethesda, Maryland 36 trips x 1 person x 2 days =
72 man days J
13 trips x1 person x 3 days =
39 man days
{
total 49 trips 111 man days b.
Glen Rose, Texas 160 man days 16 trips x 2 people x 5 days
=
40 man days 4 trips x 2 people x 5 days
=
42 man days 7 trips x 2 people x 3 days
=
12 man days, F
2 trips x 2 people x 3 days
=
32 man days 2 trips x 2 people x 8 days
=
total 33 trips 286 man days c.
New York /New Jersey 30 man days 3 trips x 2 people x 5 days
=
d.
New York, New York 10 man days 1 trips x 2 persons x 5 days
=
30 man days 5 trips x 2 persons x 3 days
=
total 6 trips 40 man days e.
Cherry Hill, New Jersey 6 man days 1 trip x 2 persons x 3 days
=.
f.
Houston, Texas 6 man days 1 trips x 2 persons x 3 days
=
e
)
t a
NRC-03-85-067 Modification No. 14 Page 4 of 4 g.
Dallas, Texas l
60 man days 4 trips x 3 people x 5 days
=
h.
Walnut Creek, California 16 man days 2 trips x 2 persons x 4 days
=
i.
San Francisco, California 30 man days 3 trips x 2 people x 5 days
=
All other terms and conditions of this contract remain the same.