MONTHYEARML24289A2052024-10-0909 October 2024 E-mail with Responses to Clarification Questions on Response to Request for Additional Information on the Phase 1 Final Status Survey Reports ML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22348A0322022-11-30030 November 2022 NRR E-mail Capture - Request to Resume Endangered Species Act Section 7 Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22348A0532022-11-30030 November 2022 NRC to National Marine Fisheries Service (Nmfs), Request to Resume Endangered Species Act Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22278A0182022-10-0404 October 2022 (SONGS) Unit 2 Reactor Head and Closure of Commitments Related to Peaceful Use of Foreign Technology- Acknowledge Receipt ML22265A2122022-09-22022 September 2022 Request for Additional Information for Exemption Request from 100m 72.106(B) Requirement, Docket Nos 50-206, 50-361, and 50-362 ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML22119A2422022-04-29029 April 2022 Riv FOLLOW-UP Response: Question About April 11 San Onofre Event ML22034A9962022-02-0202 February 2022 S. Morris Response to C. Langley-Questions About Moving Snf at San Onfre ML21280A1022021-12-0606 December 2021 NRC to NMFS, Supplement to Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21242A0602021-09-30030 September 2021 NRC to NMFS, Request to Initiate Consultation for SONGS Decommissioning ML21277A2342021-09-30030 September 2021 NMFS to NRC, Receipt of Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21117A3492021-03-30030 March 2021 March 30, 2021, Email from Public Watchdogs on Providing New Information to Its October 13, 2020, 2.206 Petition ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21068A2712021-03-0909 March 2021 Request for Additional Information Regarding Biological Opinion - SONGS- EPID L-2021-LLL-0006 ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20302A3252020-10-21021 October 2020 E-Mail: Acknowledgement of Receipt to the Petitioner Regarding SCE Use of Hi-Storm at SONGS ML20233A7342020-08-18018 August 2020 LTR-20-0313 David Victor, San Onofre Nuclear Generating Station (SONGS) Community Engagement Panel, Chair, Et Al., Letter Independent Spent Fuel Storage Installation Security at SONGS and Recent SONGS Community Engagement Panel Meeting on O ML20224A0172020-08-0707 August 2020 8-7-20 Corrected Hearing Time - Intervenor SCEs Acknowledgement of Oral Argument Notice (9th Cir.)(Case No. 20-70899) ML20224A0182020-08-0707 August 2020 8-7-20 Intervenor SCEs Acknowledgement of Oral Argument Notice (9th Cir.)(Case No. 20-70899) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20198M4522020-07-15015 July 2020 Supplement to Public Watchdogs 2.206 Petition ML20163A3402020-05-0505 May 2020 Email Transmission - Peaceful Use Commitments State Dept for SONGS Rx Heads and Steam Generators ML20120A0282020-04-28028 April 2020 4-28-20 Notice of Addition of James Adler as Attorney for NRC (9th Cir.)(Case No. 20-70899) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML20076A5742020-03-11011 March 2020 Response to A.Mcnally San Onofre Canisters (LTR-20-0003) ML20063M3092020-02-28028 February 2020 Public Watchdogs 10 CFR 2.206 Petition - Response from Petitioner to NRC E-mail Regarding Petition Screening Results, February 28, 2020 ML20062F5762020-02-28028 February 2020 Public Watchdogs 10 CFR 2.206 Petition - NRC E-mail to Petitioner Regarding Petition Screening Results February 28, 2020 ML20059M2292020-02-25025 February 2020 OEDO-20-00053 2.206 Petition - Flooding Likely to Create Radioactive Geysers at SONGS ML20049A0802020-02-14014 February 2020 Public Watchdogs 10 CFR 2.206 Petition - E-mail to Petitioner on Immediate Actions Request Determination February 14, 2020 ML20007E5342020-01-0606 January 2020 Oceansiders Initial Assessment & Public Meeting Response E-Mail ML20006D7012019-12-23023 December 2019 Public Watchdogs 10 CFR 2.206 Petition SONGS - Petitioner Request for Public Meeting and NRC Response - December 23, 2019 ML19354B6762019-12-20020 December 2019 2.206 Petition Initial Assessment Notification E-Mail ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19325C5902019-11-20020 November 2019 2.206 Petition Status Notification Email ML19326B2392019-11-18018 November 2019 Public Watchdogs 10 CFR 2.206 Petition SONGS - Screened-in and PRB November 18, 2019 ML19319B6262019-11-0808 November 2019 Oceansiders 2.206 Petition Immediate Action Response E-Mail ML19326A7122019-10-30030 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS Receipt of Exhibits October 30, 2019 ML19326A9692019-10-25025 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS Immediate Action Determination October 25, 2019 ML19326A3602019-10-23023 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS First E-mail to Petitioner October 23, 2019 ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19284B3232019-10-0808 October 2019 Response LTR-19-0351 Kalene Walker, E-mail Concerns About Critical Safety Problems with Holtec Nuclear Waste Storage System at San Onofre ML19344C7842019-09-0303 September 2019 Response from NEIMA Local Community Advisory Board Questionnaire 09-03-2019 RSCS 2024-10-09
[Table view] |
Text
From: Donna Gilmore To: Warnick, Greg
Subject:
[External_Sender] RE: RE: Holtec UMAX FSAR Revision 4 for San Onofre ISFSI ML21069A248 Date: Wednesday, March 10, 2021 8:38:58 AM Maybe my question wasn't clear. I'm not looking for NUHOMS documents. I'm looking for Holtec UMAX FSAR Rev. 4 document(s).
Region IV inspection of San Onofre states the inspection was done based the Holtec UMAX FSAR Revision 4.
How could your staff do that if they don't have the UMAX FSAR Revision 4 document or documents?
If anyone should be able to have ready and easy access to these documents, it should be your staff that used them to ensure compliance at San Onofre for the UMAX system.
Donna
Original message --------
From: "Warnick, Greg" <Greg.Warnick@nrc.gov>
Date: 3/10/21 5:10 AM (GMT-08:00)
To: Donna Gilmore <donnagilmore@gmail.com>
Subject:
RE: RE: Holtec UMAX FSAR Revision 4 for San Onofre ISFSI Please find my answers to your questions below:
Are all the information/changes to the FSAR in this document related to or evaluated for the NUHOMS 24PT1-DSC?
No. The FSAR revision you requested was for the Holtec UMAX system. The TN NUHOMS system has its own FSAR.
Are there any other FSAR related changes for FSAR Rev. 4 in this or any other documentation?
It is my understanding that a vendor or licensee submits FSAR revision changes every 2 years. Without searching all ADAMS submittals by Holtec I would be unable to verify the ML number submitted contains all of changes made in Revision 4. What I provided was the only submittal identified with a focused search of ADAMS for the Revision 4 with an associated date range. As you know, ADAMS is available on the NRCs public website for members of the public to obtain these types of documents. This is a search you can perform to locate what you are looking for. Our HQ office may be able to assist since they manage the licensing submittals for the agency.
Greg From: Donna Gilmore <donnagilmore@gmail.com>
Sent: Monday, March 08, 2021 2:38 PM To: Warnick, Greg <Greg.Warnick@nrc.gov>
Subject:
[External_Sender] RE: Holtec UMAX FSAR Revision 4 for San Onofre ISFSI Are all the information/changes to the FSAR in this document related to or evaluated for the NUHOMS 24PT1-DSC?
https://www.nrc.gov/docs/ML1722/ML17229B200.pdf Are there any other FSAR related changes for FSAR Rev. 4 in this or any other documentation?
Donna
Original message --------
From: "Warnick, Greg" <Greg.Warnick@nrc.gov>
Date: 3/8/21 11:08 AM (GMT-08:00)
To: Donna Gilmore <donnagilmore@gmail.com>
Subject:
RE: Hoktec UMAX FSAR Revision 4 for San Onofre ISFSI Hi Donna, The licensee does not submit the entire FSAR to the NRC when revisions occur.
They are required to send only the updated pages when the FSAR is revised. So, the non-proprietary Revision 4 update to the UMAX FSAR can be found with the following ML number in ADAMS (ML17229B200).
- Thanks, Greg Greg Warnick Chief, Reactor Inspection Branch NRC Region IV Ofc 817 200-1249 From: Donna Gilmore <donnagilmore@gmail.com>
Sent: Thursday, March 04, 2021 1:02 PM To: Warnick, Greg <Greg.Warnick@nrc.gov>
Subject:
[External_Sender] Hoktec UMAX FSAR Revision 4 for San Onofre ISFSI I see from this 2020 San Onofre ISFSI inspection report that San Onofre is now using the UMAX FSAR Revision 4 instead of Revision 3. Would you provide the ML number for FSAR Revision 4?
It would be helpful in the future if inspection reports included the ML numbers for the referenced documents.
- Thanks, Donna Gilmore SanOnofreSafety.org
San Onofre 2020 ISFSI Inspection Report https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20258A141 "The HI-STORM UMAX ISFSI portion was designed to hold 75 Holtec multi-purpose canisters (MPCs). The Holtec MPC-37 canister design can hold 37 pressurized water reactor fuel assemblies in accordance with UMAX CoC No. 72-1040, Amendment 2; HI-STORM UMAX FSAR, Revision 4; and the HI-STORM Flood and Wind (FW) FSAR, Revision 5. Dry cask storage operations had resumed in July 2019, after an 11-month safety stand-down in operations following an August 3, 2018, canister misalignment incident at the UMAX ISFSI. At the end of the inspection period, the licensee completed loading all 73 canisters into the UMAX ISFSI (the 73th canister was placed at the ISFSI on August 7, 2020). As of August 7, 2020, the licensee had removed all spent fuel from both Unit 2 and Unit 3 spent fuel pools. One Cavity Enclosure Container (CEC) will be left empty and one CEC contains a test canister with heating elements that will be used for aging management studies."