Summary of 980129 Meeting W/Util to Discuss Licensee Interpretation of Allowance to Perform TS Required Shutdown Surveillance Testing While at Power.Oversize Drawings Encl
ML20217A026
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/18/1998
From: Westreich B
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20217A030 List:
References
NUDOCS 9803240206
Download: ML20217A026 (4)


Text

March ~ 18, 1998

\ LICENSEE: UNION ELECTRIC COMPANY g FACILITY: CALLAWAY PLANT, UNIT 1

SUBJECT:

MEETING WITH UNION ELECTRIC REGARDING PERFORMANCE OF TECHNICAL SPECIFICATION SHUTDOWN SURVEILLANCES PERFORMED AT POWER I

On January 29,1998, a meeting was held with Union Electric Company and the Nuclear Regulatory Commission (NRC) to discuss the licensee's interpretation of the allowance to perform technical specification required shutdown surveillance testing while at power. The meeting was held at the NRC offices in Rockville, Maryland. An attendance list is attached.

j The purpose of the meeting was to allow Union Electric to present information regarding actions they had taken following the discovery that certain circuits had not been tested while the plant was shutdown as required by technical specifications. Topics discussed included a summary of Union Electric's review of Generic Letter 96-01, examples of circuits that were overlooked during previous surveillance testing, and Union Electric's basis for performing the testing on-line once the missed surveillances were identified.

Original Signed By

, Barry C. Westreich, Project Manager Project Directorate IV-2 j Division of Reactor Projects ill/IV  :

Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:(w/atts 1 and 2) l Hard Copy l l > Docket (plus Union Electric materials)  !

- Attachments: 1. Meeting Agenda PUBLIC

]

, 2. List of Meeting Attendees PDIV-2 Reading '

BWestreich ,

cc w/encls: See next page OGC l

ACRS f

E-Mail (w/atts 1 and 2) f SCollins/FMiraglia (SJC1/FJM) JFoster I l BBoger (RPZ) TLe EAdensam (EGA1) BJohnson, RIV WBateman; ETomlinson EPeyton AMarinos l f , sq TTMartin (SLM3)

,, < ; DLange (DJL) 9803240206 900318 PGwynn, Region IV PDR ADOCK 0500 3 g rig 7 l r k nem w.2m bagogggy Document Name: CALSDTS. MET kD a y OFC JO4>2 PD4-2 NAM bdireich - Eh DATE 3//f / 98 -

3/l1/98 l OFFICIAL RECORD COPY C7f0L?'/OZe6

,\ a

' ~

cc w/encis:

Professional Nuclear Mr. Otto L. Maynard Consulting, Inc.

President and Chief Executive Officer

.19041 Raines Drive Wolf Creek Nuclear Operating Corporation -

Derwood, Maryland 20855 P.O. Box 411 Burlington, Kansas 66839 Gerald Chamoff, Esq.

Thomas A. Baxter, Esq. Mr. Dan I. Bolef, President Shaw, Pittman, Potts & Trowbridge.

Kay Drey, Representative i 2300 N. Street, N.W. . Board of Directors Coalition Washington, D.C. 20037 for the Environment.

6267 Delmar Boulevard Mr. H. D. Bono University City, Missouri 63130 Supervising Engineer Quality Assurance Regulatory Support Mr. Lee Fritz Union Electric Company Presiding Commissioner Post Office Box 620 Callaway County Court House Fulton, Missouri 65251 10 East Fifth Street Fulton, Missouri 65151 U.S. Nuclear Regulatory Commission Resident inspector Office Mr. Alan C. Passwater, Manager 8201 NRC Road Licensing and Fuels Steedman, Missouri 65077-1302 Union Electric Company Post Office Box 66149 Mr. J. V. Laux, Manager St. Louis, Missouri 63166-6149 Quality Assurance Union Electric Company Mr. Garry L. Randolph Post Office Box 620 Vice President and Chief Nuclear Officer Fulton, Missouri 65251 Union Electric Company Post Office Box 620 Manager- Electric Department Fulton, Missouri 65251 Missouri Public Service Commission 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400

' Arlington, Texas 76011-8064 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102

AGENDA MEETING: Nuclear Regulatory Commission / Union Electric Company

SUBJECT:

Tech Spec Required Shutdown Surveillance Testing DATE: Thursday, January 29,1998 e introduction e Generic Letter 96-01 Review Summary e Description of Examples

1) LSELS Inhibit Circuit i IR 50-483/97-15
2) Diesel Generator Trip Checks (Relay ESX) ,

IR 50-483/97-17 o Basis for Doing Partial Testing On-Line  !

  • Circuit Review
1) Sequencer Inhibit Circuit
2) Diesel Generator Trip Checks e Conclusion

s*.

ATTENDANCE LIST MEETING WITH UNION F1 ECTRIC COMPANY CAI I AWAY PLANT. UNIT 1 January 29,1998 i

UNION ELECTRIC COMPANY D. Miller M. Reidmeyer D. Shafer A. Passwater NRC B. Westreich B. Bateman J. Foster T.Le i E. Tomlinson A. Marinos B. Johnson, Region IV (Videoconference)

P. Gwynn, Region IV (Videoconference)

E. Merschoff, Region IV (Videoconference)  !

I

OVERSIZE DOCUMENT PAGE(S) PULLED SEE APERTURE CARD FILES

                                                  • f***'*******'****7*****f*********
                                  • fh********************************

ACCESSION NUMBERS OF OVERSIZE PAGES:

18632 ave 3 .

00y 047 602 00 1 OI/

0/2 l Olls J