LR-N20-0077, Annual Report of Specific Activity Analysis - TS 6.9.1.5c

From kanterella
Revision as of 03:12, 7 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Report of Specific Activity Analysis - TS 6.9.1.5c
ML20339A423
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/04/2020
From: Sharbaugh D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N20-0077
Download: ML20339A423 (2)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 0PSEG NuclearLLC TS 6.9.1.5c LR-N20-0077 December 4, 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311

Subject:

Annual Report of Specific Activity Analysis - TS 6.9.1.5c PSEG Nuclear LLC (PSEG) submits this report in accordance with the requirements of Salem Units 1 and 2 Technical Specification (TS) 6.9.1.5c.

PSEG reports that for the period from January 1, 2019 until January 1, 2020, there were no instances when the primary coolant specific activity, of either unit, exceeded the TS limits of Dose Equivalent Iodine (DEi) s 1.0 microcuries/gram and s 100/E-bar microcuries/gram as stated in TS 3.4.8 for Salem Unit 1 and TS 3.4.9 for Salem Unit 2 respectively.

There are no commitments contained in this letter.

Should you have any questions regarding this submittal, please contact Mr. Thomas Cachaza at 856-339-5038.

Rj;J!'t? L David Sharbaugh Plant Manager Salem Generating* Station tjc

Page 2 LR-N20-0077 cc: Administrator, Region I, NRC NRC Senior Resident Inspector, Salem NRC Project Manager, Salem P. Mulligan, Chief, NJBNE L. Marabella, Corporate Commitment Tracking Coordinator T. Cachaza, Salem Commitment Tracking Coordinator