Title | Failure to Implement Effective Corrective Actions for Defects in Masterpact Breakers |
Description | The inspectors reviewed a self-revealing, non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, for the failure to promptly correct a condition adverse to quality. Specifically, station personnel failed to implement repairs to the mechanism-operated contact linkages for safety-related breakers, ultimately resulting in the failure of standby gas treatment filtration train 1B to start on demand. This issue was entered into the licensees corrective action program as Condition Report CR-RBS-2012-005894. The failure to correct a condition adverse to quality is a performance deficiency. This performance deficiency is more-than-minor because it is associated with the systems, structures, and components and barrier performance attributes of the barrier integrity cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers (fuel cladding, reactor coolant system, and containment) protect the public from radionuclide releases caused by accidents or events. Specifically, the standby gas treatment exhaust filter train failed to start during a surveillance test because of a nonconforming mechanical linkage in the feeder breaker resulting in unavailability for standby gas train 1B. In accordance with NRC Inspection Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, and NRC Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process for Findings At Power, Exhibit 3, Section C, question 1, the finding screened as very low safety significance (Green), because the finding represented only a degradation of the radiological barrier function provided by the standby gas treatment system. No cross-cutting aspect was assigned to this finding because the NRC concluded the finding did not reflect current licensee performance |
Site: | River Bend |
---|---|
Report | IR 05000458/2012005 Section 1R22 |
Date counted | Dec 31, 2012 (2012Q4) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.22 |
Inspectors (proximate) | A Barrett J Laughlin G Larkin D Proulx |
INPO aspect | |
' | |