| Q | CCA | Title |
---|
05000458/FIN-2012002-09 | 2012Q1 | | Failure to Properly Fabricate and Install the mid-Standard Turbine Shaft Brush |
05000458/FIN-2012002-08 | 2012Q1 | H.2 | Failure to Control Access to a High Radiation Area |
05000458/FIN-2012002-07 | 2012Q1 | H.8 | Failure to Perform a Radiation Survey |
05000458/FIN-2012002-06 | 2012Q1 | H.7 | Inadequate Maintenance Instructions for the Suppression Pool Cooling Isolation Valves |
05000458/FIN-2012002-05 | 2012Q1 | H.8 | Inadequate Relief Valve Configuration Control Results in a Reactor Downpower |
05000458/FIN-2012002-04 | 2012Q1 | H.7 | Failure to Appropriately Set Reactor Core Isolation Cooling Flow Controller High Output Limit |
05000458/FIN-2012002-03 | 2012Q1 | H.14 | Failure to Verify Assumptions used in Standby Equipment Room Temperature Analysis |
05000458/FIN-2012002-02 | 2012Q1 | H.8 | Failure to Appropriately Assess and Manage Risk for Internal Flooding Events |
05000458/FIN-2012002-01 | 2012Q1 | H.9 | Failure to Adequately Monitor the Performance of the Digital Radiation Monitoring System |
05000458/FIN-2012003-04 | 2012Q2 | | Failure to Properly Assemble Turbine Control Valve Push ROD-SPRING Housing Coupling |
05000458/FIN-2012003-03 | 2012Q2 | P.1 | High Pressure Core Spray Diesel Generator Bearing Lubrication Deficiencies |
05000458/FIN-2012003-02 | 2012Q2 | H.13 | Failure to Follow Severe Weather Operations Procedure |
05000458/FIN-2012003-01 | 2012Q2 | H.2 | Failure to Follow Procedure to Protect Sensitive Plant Areas |
05000458/FIN-2012003-05 | 2012Q2 | | Failure to Specify Manual Actions for Safety Relief Valve Operations During a Station Blackout Event |
05000458/FIN-2012004-01 | 2012Q3 | | Improper Hydrogen Igniter Breaker Trip Coil Setting |
05000458/FIN-2012004-02 | 2012Q3 | H.6 | Untimely Corrective Actions to Ensure Reliability of the 480 Vac Molded Case Circuit Breakers and Unitized Motor Starters |
05000458/FIN-2012004-03 | 2012Q3 | P.5 | Failure to Appropriately Tune the Reactor Core Isolation Cooling Turbine Speed Controller |
05000458/FIN-2012004-04 | 2012Q3 | H.5 | Inadequate Verification of Leading Edge Flow Meter Functionality |
05000458/FIN-2012009-01 | 2012Q3 | | Main Control Room Annunciator Control and Conduct of Operations |
05000458/FIN-2012009-02 | 2012Q3 | | Past Operability of the Reactor Core Isolation Cooling System |
05000458/FIN-2012009-03 | 2012Q3 | | Implementation of the Procedure for Infrequently Performed Tests or Evolutions |
05000458/FIN-2012009-04 | 2012Q3 | | Corrective Action Program Implementation for Prior Lockout Relay Failure in February 2011 |
05000458/FIN-2012009-05 | 2012Q3 | | Implementation of Vendor and Industry Recommended Relay Testing and Maintenance |
05000458/FIN-2012009-06 | 2012Q3 | | Implementation of the Station Cable Reliability Program |
05000458/FIN-2012009-07 | 2012Q3 | | Onsite Safety Review Committee Implementation |
05000458/FIN-2012009-08 | 2012Q3 | | Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation |
05000458/FIN-2012010-07 | 2012Q3 | H.13 | Loss of Onsite Safety Review Committee Independence |
05000458/FIN-2012010-06 | 2012Q3 | P.5 | Failure to Establish an Adequate Cable Reliability Program |
05000458/FIN-2012010-05 | 2012Q3 | | Failure to Est Lockout Relays in Accordance with Vendor Testing Practices |
05000458/FIN-2012010-04 | 2012Q3 | H.5 | Failue to Implement Effective Corrective Actions for Lockout Relay Failures |
05000458/FIN-2012010-08 | 2012Q3 | H.7 | Failure to Prevent Conflicts of Duty for Fire Brigade Members |
05000458/FIN-2012010-01 | 2012Q3 | | Failure to Correct Spurious Isolation of Reactor Core Isolation Cooling System |
05000458/FIN-2012010-03 | 2012Q3 | H.14 | Failure to Establish an Adequate Controlling Procedure for Stroking Safety Relief Valves at LOW Power |
05000458/FIN-2012010-02 | 2012Q3 | H.14 | Failure to Declare Reactor Core Isolation Cooling System Inoperable |
05000458/FIN-2012012-01 | 2012Q4 | H.8 | Failure to Identify and Correct a Condition Adverse to Quality |
05000458/FIN-2012012-02 | 2012Q4 | P.4 | Failure to Promptly Identify and Correct a Condition Adverse to Quality |
05000458/FIN-2012012-03 | 2012Q4 | | Failure to Maintain Design Control of the Feedwater Control System |
05000458/FIN-2012012-04 | 2012Q4 | P.2 | Failure to Correct an Identified Condition Adverse to Quality |
05000458/FIN-2012012-05 | 2012Q4 | P.2 | Failure to Correct the Maintenance Organizations Inadequate Procedure Use and Adherence |
05000458/FIN-2012403-02 | 2012Q4 | | Security |
05000458/FIN-2012403-01 | 2012Q4 | | Security |
05000458/FIN-2012005-04 | 2012Q4 | H.12 | Failure to Follow Procedure for Lifting Leads Results in Inoperability of Standby Service Water Fan |
05000458/FIN-2012005-03 | 2012Q4 | | Failure to Implement Effective Corrective Actions for Defects in Masterpact Breakers |
05000458/FIN-2012005-02 | 2012Q4 | P.2 | Inadequate Procedures for Lubrication of the Standby Liquid Control Pump Motor Bearings |
05000458/FIN-2012005-01 | 2012Q4 | | Failure to Maintain Design Control of the Control Building Chilled Water System |