IR 05000458/2012404

From kanterella
Jump to navigation Jump to search
IR 05000458-12-404, on 06/07/2012, River Bend Station, NRC Security
ML12270A475
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/24/2012
From: Hay M
Plant Support Branch-1
To: Olson E
Entergy Operations
References
IR-12-404
Download: ML12270A475 (3)


Text

UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON ber 24, 2012

SUBJECT:

RIVER BEND STATION - NRC SECURITY INSPECTION REPORT 05000458/2012404

Dear Mr. Olson:

On June 07, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your River Bend Station facility. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were telephonically discussed on September 13, 2012, with Mr. J. Roberts, Director, Nuclear Safety Assurance, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No NRC-identified or self-revealing findings were identified during this inspection.

However, a licensee-identified violation which was determined to be of very low security significance is listed in this report. The NRC is treating the violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the River Bend Station In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-458 License No.: NPF-47 Nonpublic Enclosure:

NRC Inspection Report 05000458/2012404 w/Attachment: Supplemental Information cc w/enclosure:

Michael V. Priebe Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/508 P.O. Box 56 Avila Beach, CA 93424 cc w/o enclosure by Electronic Distribution