ML20202E429

From kanterella
Revision as of 22:57, 1 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Rev 14 to Fnp,Units 1 & 2 Updated FSAR Which Contains All Changes Necessary to Reflect Info & Analyses Submitted to Commission by Util or Prepared by Util,Per Commission Requirement from 951105 to 970604
ML20202E429
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/02/1997
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202E434 List: ... further results
References
NUDOCS 9712080035
Download: ML20202E429 (2)


Text

. . . .

Dave Morey Southern Nuclear ,

Opereirg Company p , %ce Present

-* Farley Preject F.0.Ex1295

?

Bam.t.gham. Alabama 35201 Tel 20$ M2 5131 SOUTHERN mi December 2, 1997 COMPANY Energy to Smr uurWorld

10 CFR 50 Docket Numbers: 50 348 50 364 U.S. Nuclear Re ,Jatory Comm'.asion ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant (FNP)

Revision 14 To The Updated FSAR And 10 CFR 50.59 Repori ladies and Gentlemen:

In accordance with the requirements of 10 CFR 50.71(e), Southe n Nue' ear Operating Company (SNC) hereby <ubmits Revision 14 to the FNP, Units I and 2, Updated FSAR. This s..br..ittal contains all the changes necessary to renect infonnation and analyses submitted to the Commission by SNC or prepared by SNC pursuant to Commission requirement from November 5,1995 to June 4, 1997 (i.e., from one day aner the end of the 13th Unit I scheduled refueling o itage to the end of the%

14th Unit I scheduled refueling outage). The Updated FSAR has been revised to include the effccis of the following: all changes made in FNP or procedures as described in the FS AR, all safety evaluations performed by SNC either in support of requested license amendments or in support of conclusions that changes did not involve an unreviewed safcty question, and all analyses of new safety issues performed by or on behalf of SNC at Commission request. As required, rhis submittal is provided on a replacement-page basis, and is accompanied by an effective page list that identifies the current pages of the FSAR following page replacement. Pursuant to 10 CFR 50.4(b)(6), the origmal and 10 copies are being submitted to the Commission's Document Control Desk, a copy is being submitted to the NRC Region 11 office, and a copy is being submitted to the NRC Resident inspector at FNP.

in accordance with the requirements of 10 CFR 50.59(b)(2), SNC hereby submits the 50.59 Report containing a brief description of any changes, tests, or experiments, including a summary of the safety evaluation of each. Puisuant to 10 CFR 50.4(b)(l), the original is being submitted to the Commission's Document Control Desk, a copy is being submitted to the KRC Region 11 ofrice, and a z

copy is being submitted to the NRC Resident inspector at FNP.

Attached for your information are two sets of the current project drawings referenced in the FNP Updated FSAR, Revision 14. Please ensure one set of these project drawings is forwarded to the FNP 3

local Public Document Room. Two sets of project drawings are also being sent to the NRR Project r

Manager for FNP.

US0001 s, gs gglglglgggg; 9712090035 971202 b ADOCK 05000348

{DR PDR 1 t"SN

.S. Nuclear Regulatory Commission Page 2 If there ere any questions, or if additional information is needed, please advise.

Respectfully submitted, SOUTilERN NUCLEAR OPERATING COMPANY h ][W Dave Morey DRC1fsar-r14. doc ec for the cover .etter:

U.S. Nuclear Reculatory Commission. Washincton. DC Mr. J. I. Zimmerman, NRR Project Manager U.S. Nuclear Reculatory Commission. Recion 11 Mr. L. A. Reyes, Region 11 Administrator Mr. T. M. Ross, FNP Senior Resideat inspector ce for the 10 CFR 50.59 Report (Enclosure 1):

U.S. Nuclear Reculatory Commission. Washincton. DC Mr. J.1. Zimmerman, NRR Project Manager U.S. Nuclear Reculatory Commission. Recion 11 Mr. L. A. Reyes, Region 11 Administrator Mr. T. M. Ross, FNP Senior Resident inspector ec for FNP FSAR Revision 14 (Enclosure 2):

U.S, Nuclear Reculatory Commission. Washincton. DC Document Control Desk (10 complete packages)

U.S. Nuclear Reculatory Commission. Recior _.y Mr. L. A. Reyes, Region 11 Administrator (I complete package)

Mr. T. M. Ross, FNP Senior Resident inspector (1 complete package) cc for Project Drawings (Enclosure 3):

U.S. Nuclear Reculatory commission. Washincton. DC ,

Mr. J. I. Zimmerman, NRR Project Manager (w/2)

Enclosures

1. 10 CFR 50.59 Report
2. FNP FSAR Revision 14
3. Project Drawings Referenced in FNP Updated FSAR, Revision 14

- _ _ _ _ _ _ _ _ _ - - - _ _ _ . . . . _ _ .