Forwards Status Rept on Std Plant Design Technical Reviews
ML20195B613
Person / Time
Site: 05000000, 05000605, 05000601
Issue date: 10/26/1988
From: Chris Miller
Office of Nuclear Reactor Regulation
To: Congel F, Grimes B, Shao L
Office of Nuclear Reactor Regulation
References
PROJECT-669A, PROJECT-675A, PROJECT-676A NUDOCS 8811020096
Download: ML20195B613 (17)


Text

_ _ _

4

/ .  %, UNITED STATES

! , NUCLEAR REGULATORY COMMISSION

  • WASHINGTON, D. C. 20HS October 26, 1988 t Docket No. 50-601 and 50-605 ProjectNos. 669, 675, and 676 MEMORANDUM FOR: L. Shao, Director Divir. ion of Engineering and System Technology, NRR B. Grimes, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation NRR R. W. Houston, Director Division of Safety Issue Resolution, RES B. Sheron, Director ,

Division of Systems Research, RES FROM: Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate '

Division of Reactor Projects III, !Y, '

Y and Special Projects, NRR

SUBJECT:

STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS i Attached is the October status report con: erring the current rovirw milestones

' for each of the standard plant projects (EPRI, ABWR, RESAft SP/90, and CE System 80+).

Note the "Due Date" column reflects dates established in the January 25, 1938 "Revised Prograin Plan for Standard Plant Reviews" or dates fer which modifica.

tion was agreed to by PDSNP and the review branch.

CONTACT:

1 T. Kenyon, NRR/PDSNP 492-1120 [

i i ranua%1 A

.g.

e The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.

1

,..6 .s. ...{ i, [. N D.h -

Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects NRR

Enclosure:

As stated cc: T. Murley J. Sniezek F. Miraglia l D. Crutchfield L. Rubenstein J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham J. Zwolinski S. Weiss W. Regan, Jr.

J. Murphy G. Bagchi S. Newberry

October 26, 1988

-2 i

The colur.n "Expected Input Date" reflects input from appropriate technical l branch managerent. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this meno.

/s/

Charles L. Miller, Director Standardization and Non-Power Reactor Projett Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR

Enclosure:

As stated cc: T. Purley J. Sniezek F. Miraglia D. Crutchfield t.. Rubenstein J. Richardson C. Y. Cheng L. B. Marsh C. ftcCracken A. Thadani J. Joyce J. Itauk F. Rosa J. Craig M. W. Hedges B. Grires R. Erickson D. Matthews R. Barrett L. Cunningham J. Zowlinski S. Weiss W. Regan, Jr.

J. Murphy G. Bagchi S. Newberry DISTRIEUTION:

Docket File EHylton NRC PDR DScaletti P95hP Reading Trenyon CVissing hLeng hy (/d Chiller LRubenstein \

FDSNP[L AD:PDShP EHylpon:cw Chiller 10/4/88 10/ /88

~ ~

Date October 26 1988 REVIEW STATUS REPORT ON ~

WESTI EPOUSE RSAR SP/9_0 PDA REVIDI 1 Expected Division / Due Input Branch Reviewer Mocales Subject

  • Milestone Date Date Cat.** Comments 4

DEST /EMTB Johnson 1, 4, 5, 648, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4 Complete i 10 to P.M. 5/5/88 l DEST /EMEB Rajan/ Brassier *** 1, 4, 5, 7 Mechanical Engineering Draft SER 10/31/88 10/31/88 2 DSER in typing to P.M.

DEST /ESGB ' Staley 3 Hydrology Draft SER 3/31/88 3/30/88 4 Complete to P.M.

i i Giese-Koch 3 Geology & Seismology Draft SER 3/31/88 3/30/88 4 Complete to P.M.

4 Chan 7 Civil Engineering Draft SER 4/29/88 4/28/88 4 Complete to P.M.

  • See Septem6er 29,1987 meno for complete listing of review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
      • Brasener providing assistance

~

^

l . .

l Date: October 26,1988 ,

l . .

REVIEW STATUS REPORT ON .

PDA KI. VIEW (Cont.)

Expected Division / Duc Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Commients l

DEST /ECEB Wing 1, 6&8, ID, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4 Couplete Notley 13 Fire Protection Draft SER 7/15/88 9/01/88 4 Complete to P.M.

DEST /SICB Burrows 9, 13, 15 Instrumentation & Draft SER 3/31/88 4/07/88 4 Cosplete Controls to P.M.

DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/13/88 4 Complete to P.M.

DEST /SPLB Shum(lead) 1, 10, 13 Containment Systems Draft SER 6/21/88 6/21/88 4 Complete to P.M.

Shum (lead) 688, 10, 12, 13 HVAC Systems, Waste Draft SLR 6/21/88 6/21/88 4 Complete Management, Steam & to P.M.

Power Conversion

  • See Septem6er 29,1987 meno for complete listing of review assigemaats
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

Date: Octooer 26,1988 ,"

REVIEW STATUS REPORT Op PDA KtVIEW (cont.)

Expected Divisten/ Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments l

DEST /SPLB Shum(lead) 4, 6&8, 7, 13 Plant Systems Draft SER 6/21/88 G/21/AR 4 Complete l

(cont.) to P.M.

DEST /SPLB Tinkler IE PRA Review DSER 11/14/88 11/14/88 2 re: PRA l DEST /SRXB Liang 1, 4, 5, 658 Reactor Systems Draft SER 6/28/88 6/28/88 4 Complete 9, 10, 11, 12 to P.M.

DEST /SRXB Liang 16 PRA Review DSER 11/14/88 11/14/88 3 Reviewers l re: PRA providing l Assistance to SPLB DRIS/RSGB Mendelsohn 2 Physical Security Draft SER 3/31/88 3/22/88 4 Complete to P.M.

DLPQ/LQAB Spraal 13 Quality Assurance Draft SER 4/29/88 4/06/88 4 Complete l to F.M.

l

  • See September 29, 1987 seno for complete listing of review assignments

"* Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

l -

t Date: October 26, IE8 [

l REVIEW STATUS REPORT ON l ~

  • l WESHRGNUU5E EL5AR SP/90 PDA METIEW l (Cont.)

Expected Input l Division / Due Brcnch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments

! DLPQ/LHFB Lapinski 15 Control Room / Human Graft SER 3/31/88 5/05/88 4 Complete

! Factors Engineering to P.M.

DREP/PRPB Spickler 1, 3, 4, S. Radiological Accident Draft SER 8/01/88 8/12/88 4 Complete 6&8, 9, 10 Analysis to P.M.

Skopec 12 Process & Effluent Draft SER 7/15/88 7/13/88 4 Complete l

Radiological to P.M.

Monitoring 1 Sampling Systems t

DREP/PRAB Margulies 16 PRA Review DSER 11/14/88 11/14/88 3 l re: PRA l RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 7/15/88 7/15/88 4 Complete l Study - back end SER to j P.M.

  • See Septester 29, 1987 meno for complete listf- review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete r

~,.,

~

Date: October 2ti.1988 REVIEW STATUS REPORT ON GE AFWR FDA/DC Rt. VIEW Expected Division / SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Ca t.* Cosmients DEST /SPLB Chandrasekaran 9 Plant Systems RAIs to 9/30/85 4 P.M.

j DEST /SPLb Chandrasekaran 11 Plant Systems RAIs to 9/30/88 2 P.M.

, DEST /SRXB Thomas 5, 6, 15 Reactor Systems RAIs to 10/01/88 10/01/88 4 a revised P.M. schedule has been developed so as not to i slip the SER issue date J (3/30/89) DEST has agreed to the proposed schedule DEST /SELB Lazevnick 8, 9 Power Systems RAls to 9/30/88  ? 2 P.M.

DEST /ECEB Witt 7,8,9,11,12,13 Chemical Engineering RAIs To 9/30/88 8/14/88 4 14, & 17 P.M.

DRIS/RSGB Mendelsohn 13 Safeguards RAIs to 9/30/88 4 P.M.

DLPQ;iOAB Sprual 17 QA RAIs to - - 3 P.N.

  • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

Date: October 26, 1988 ,

REVIEW STATUS REPORT ON GE ABI5t '

FDA/DC n VIEW (Cont.)

Expected Division / SRP Due Input Branch Reviewe - Chapter Subject Milestone Date Date Cat.* Comments DREP/PRPB Brown 15 Radiation Protection Draft 7/31/88 9/30/88 2 8/19/88 mens SER committing to to 9/30/88 SER input DREP/PRP8 Pederse.1 12 Radiation Pr7tection RAI to 9/30/88 10/29/83 4 P.M.

DEST /EMEB Rajan 4, 5, 6, 15 Mechanical Englneering Draft 7/31/88 9/29/88 4 (Code Cases) SER DEST /EMEB Rajan 1, 2, 3 Mechanical Engineering RAls to 6/30/88 9/13/88  :

1 P.M.

  • Category definitions:
1. AD or above sttention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

' ,=.

~

Date: October 26,1988 REVIEW STATUS REPORT ON .

CE 5Y5ILM 80+

Ct551.E-DC REVIEW ,

Expected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Cossents l DEST /EMTB M. Hum 4 Rev 8 R? actor PAI 07/10/88 10/13/88 4 DEST /EMTB M. Hum 5 Rev B Reactor Coolant System RAI 07/10/88 10/13/88 4 DEST /EMEB J. Rajan 5 Rev C Reactor Cooling System RAI 09/30/68 09/30/88 No Comments DEST /SRIB L.Kopp 5 Rev C Reactor Cooling System RAI 09/30/88 09/30/88 2 l

l DEST /EMTB M. Hum 5 Rev C Reactor Coolant System RAI 09/30/88 10/13/88 4 DEST /SPLB J. Raval 5 Rev C Reactor Coolant System RAI 09/30/88 09/30/88 4 DEST /ECEB ' F. Witt 5 Rev C Reactor Coolant System RAI 09/30/88 10/26/68 3 l DEST /SPLB J. Raval 6 Rev C Engineered Safety Features PAI 09/30/88 09/30/88 4 l

l DEST /ECEB F. Witt 6 Rev C Engineered Safety Features RAI 09/30/88 10/26/88 3 DEST /EMTB M.11um 6 Rev 'J Engineered Safety Features RAI 09/30/88 10/13/88 4 DEST /SPLB J. Raval 10 Rev C Steam & Power Conversion RAI 09/30/88 09/30/88 4 System DEST /ECEB F. Witt 10 Rev C Steam & Power Conversion RAI 09/30/88 10/26/88 3 System

  • Category definition:
1. AD or above attention requested
2. Bran ( Chief attention requested
3. On schedule
4. Complete

Date: October 26, 1988 ,

REVIEW STATUS REPORT ON CE SYSTEM 60+

CESSAR-DC RtWIEW '

(Cont'd)

Expected Division / Due Input Brrcch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /EMTB M. Hum 10 Rev C Steam & Power Conversion RAI 09/30/88 10/13/88 4 System RES/DRAA/ E. Che111ah Base Line Sase Line PRA Comments 10/30/88 10/30/88 3 PRAB PRA l

DEST /ESGB N. Ror.ney 2 REY D Site Characteristics RAI 12/30/88 12/30/88 3 j DREP/PREB R. Van Niel 2 PEV D Site Characteristics RAI 12/30/88 12/30/88 3 DEST /ESGB N. Romney 2 REV D Structures Components RAI 12/30/88 12/30/08 3 DEST /EMEB J. Rajan 3 REV D Structures, Components RAI 12/30/88 12/30/88 3 DEST /EMTB H. Hum 3 PEV D Structures, Components RAI 12/30/88 10/17/88 4 DEST /SPLB J. Raval 3 REV D Structures, Components RAI 12/30/88 12/30/88 3 DEST /SRDB L. Kopp 4 REV D Reactor RAI 12/30/88 12/30/88 3 DEST /EMTB M. Hum 4 REV D Reactor RAI 12/30/88 10/17/88 4 DEST /EMEB J. Rajan 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 3 o Category definition:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

~

Date: October 26,1988 REVIEW STATUS REPORT ON CE 3Y31tn 50+

CE353NICRTfDi (cont'd)

Espected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SRX8 L. Kopp 5 REY D Reactor Coolant System RAI 12/30/88 12/30/88 3 DEST /EMT8 M. Hun 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 4 DEST / SPL8 J. Raval 5 REV D Reactor Crolant System RAI 12/30/88 12/30/88 3 DEST /SPL8 F. Witt 5 REY D Reactor Coolant System RAI 12/30/8" J/30/88 3

8. Mendelsohn 5 REY D Reactor Coolant System RAI 12/30/88 12/30/88 3 DREP/RGS8 J. Raval 6 REY D Engineered Safety RAI 12/30/88 12/30/88 3 DEST /SPL8 '

Features L. Kopp 6 REV D Engineered Safety RAI 12/30/88 12/30/88 3 DEST /SRIB Features DEST /ECE8 F. Witt 6 REY D Engineered Safety RAI 12/30/88 12/30/88 3 Features l

l

  • Category definition:
1. AD or above attention regsested
2. Branch Chief attention requested
3. On schedule
4. Complete

Date: October 26,1988 ,

REVIEW STATUS REPORT ON -

CE SY5ILM 80+

CEI5XIF-UC'ETTEW *

(Cont'd)

Expected Division / Due input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /ENTB M. Hum 6 REY D Engineered Safety RAI 12/30/88 12/30/88 4 Features DEST /SICB J. Stewart 7 REV D Instrumentation & R4I 12/30/88 12/30/88 3 Controls DLPQ/LHFB G. Lapinski 7 REV D Instrumentation & RAI 12/30/88 12/30/88 3 Controls DLPQ/LHFB G. Lapinski 18 REV D Human Factors Engineering RAI 12/30/88 12/30/88 3

  • Category defiettion:
1. AD or above attention rysted
2. Branch Chief attention raluested
3. On schedule
4. Complete

~

Date: October 26, 1988 ,

REVIEW STATUS REPORT ON .

SYSItn 80 ct55AF-F

~

KtTIEW Expected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SRIB C. 1.iang TAC 66400, ASPSS ISSUE Final SER open open 3 Wating res-to P.M. ponse from CE on RAI DEST /EMEB J. Rajan TAC 66401 Steam Gen. Tube Vibration RAIs to oper. open 3 Waiting res-P.M. posse frem CE on RAI DEST /EM'8 W. Wickman TAC 66401, Steam Gen. Tube Vibration RAls to open open 3 Waiting res-P.M. ponse from CE on RAI DREP/PRPB 1. Spickler tan. 66400 ASPSS ISSUE (SFT Rupture) Final SER open open 3 Waiting res-to SRIB/PM ponse from CE on RAI l

l

  • Category definition:

l 1. AD or above attention requested l 2. Branch Chief attention requested l 3. On schedule

4. Coglete
    • Close out issue

Date: October 26,1988 ,

REVIEW STATUS REPORT ON CE 5T5ItR 80+

CE N AEFTUFICTAFERS Expected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Ca t.* Comments RES/SAIB C. Ferrell Topic Paper Set 10 ARSAP Issues RAI 06/15/88 09/16/88 4 Comments No. I provided CE at meeting 6/21/88 RES/SAIB C. Ferrell, et al Topic Paper Set 6 ARSAP Issues RAI 06/30/88 08/30/PA 1 No. 2 RES/SAIR C. Ferrell, et al Topic Paper Set 3 ARSAP Issues RAI 10/30/88 10/30/88 3 No. 3 RES/SAIB C. Ferrell, et al Topic Paper Set 1 ARSAP !ssue RAI 11/9/88 11/9/88 3 No. 4 l

l

  • Category definition:
1. AD or above attention requested
2. Branch Chief si.*ention requested
3. On schedule
4. Complete

Date: October 26,1988 REVIEW STATUS REPORT ON EPRI'5 ALuit utguisuutun D0a91ENT ,

Ezpected Division / Due Insut Branch Revleuer Chapter Subject

  • Milestone Date Date Ca t.* Comments DEST /EMER Rajan 5 Eng. Safety Systems DSER to 10/28/88 " 2 P.M.

l l

DEST /ENTS Tsao 5 Eng. Safety Systems DSER to N/A 4 Reviewer will l P.M. have no 1spet DEST /51CB Stewart 5 Eng. Safety Systems DSER to 10/28/88** 2 P.M.

DEST /SELB Lazevnick 5 Eng. Safety Systems DSER to 10/28/98 3 P.M.

DEST /SPLB Shun 5 Eng. Safety Systems DSER to 10/28/88** 2 P.M.

l DEST /SRX8 Schwenk 5 Eng. Safety Systems DSER to 10/28/fl8** 3 7/8/88 DSER P.M. Input necd revision

  • Category Definition:
1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete
    • Due date revised to reflect receipt of additional information dated 08/16/88 and ACRS schedule

~

t Date: October 26, 1988 r

REYIEW STATUS REPORT ON

~ '

EPRI'5 ALUR RtqulNU4t.N15 DOGNOIT -

(Cont.)

Expected Division / Due Input Branch Reviewer Chapter Sub,)ect* Milestone Date Date Cat.* Ceauents l

l DREP/RPB Martin 5 Eng. Safety Systems DSER to N/A 4 l P.M.

DEST /ECEB Parczewsti 5 Eng. Safety Sysi. ems DSER to 10/28/88** 4 P.M.

DREP/RAB Kelly 5 Eng. Safety Systems DSER to N/A 4 P.M.

DRIS/RSGB ' Mendelsohn 5 Eng. Safety Systems DSER to N/A 4 P.M.

DEST /ESGB Rinaldi 5 Eng. Safety Systems DSER to N/A 4 P.M.

Dt.PQ/LHF8 Correia 5 Eng. Safety Systems DSER to N/A 4 P.M.

Note: Aapter 6 '8vilding Arangements" review begins 11/17/88.

  • Category Definition:
1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete
    • Due date revised to reflect receipt of additional information dated 08/16/.*3 and ACRS schedule