Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARRBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection RBG-44150, Special Rept:On 970717,automatic Trip Occurred During Div I EDG Surveillance Test.Caused by Slow Response of Jacket Water Low Pressure Sensor.New Pressure Switch Shop Tested & Installed1997-08-14014 August 1997 Special Rept:On 970717,automatic Trip Occurred During Div I EDG Surveillance Test.Caused by Slow Response of Jacket Water Low Pressure Sensor.New Pressure Switch Shop Tested & Installed RBG-44111, Special Rept:On 970625,LPMS Were Declared Inoperable.Cause Attributed to Excessive Background Signal Variations.Plan Was Developed to Investigate Noise Problem & to Restore Operability of Each Channel1997-08-0404 August 1997 Special Rept:On 970625,LPMS Were Declared Inoperable.Cause Attributed to Excessive Background Signal Variations.Plan Was Developed to Investigate Noise Problem & to Restore Operability of Each Channel RBG-42922, Special Rept:On 951205,failure of Div 1 DG Air Admission Valves Occurred During Maint Runs.Caused by Mechanical Malfunction.All Admission Valve Pistons/Cap Assemblies Replaced1996-05-16016 May 1996 Special Rept:On 951205,failure of Div 1 DG Air Admission Valves Occurred During Maint Runs.Caused by Mechanical Malfunction.All Admission Valve Pistons/Cap Assemblies Replaced RBG-42340, Special Rept:On 951204,Division I H Analyzer Discharge Piping Containment Penetration Check Valve Failed,Causing Containment Penetration to Be Isolated Rendering H Analyzer Inoperable1996-01-17017 January 1996 Special Rept:On 951204,Division I H Analyzer Discharge Piping Containment Penetration Check Valve Failed,Causing Containment Penetration to Be Isolated Rendering H Analyzer Inoperable RBG-42305, Interim Special Rept:On 951212,during Two Prestart Air Roll Attempts,Div I EDG Failed to Reach Satisfactory Rotational Speed.Suspected Cause of Unsuccessful Air Rolls Believed to Be Mechanical Malfunction of 4 Air Admission Valve1995-12-19019 December 1995 Interim Special Rept:On 951212,during Two Prestart Air Roll Attempts,Div I EDG Failed to Reach Satisfactory Rotational Speed.Suspected Cause of Unsuccessful Air Rolls Believed to Be Mechanical Malfunction of 4 Air Admission Valve RBG-42241, Special Rept:On 950912,EDG Failed to Start During Test. Caused by Machining Errors Caused by Mfg Resulted in Binding Between Piston & Bore1995-12-12012 December 1995 Special Rept:On 950912,EDG Failed to Start During Test. Caused by Machining Errors Caused by Mfg Resulted in Binding Between Piston & Bore RBG-42259, Special Rept:On 951109,EDG Unit Tripped on Invalid High Lube Oil.Failure Determined to Be Isolated Failure & Switch Replaced1995-12-0707 December 1995 Special Rept:On 951109,EDG Unit Tripped on Invalid High Lube Oil.Failure Determined to Be Isolated Failure & Switch Replaced RBG-42170, Suppl to Special Rept Re Invalid Failure of Div II EDG When Diesel Room Standby Ventilation Fan Failed to auto-start During Monthly Operability Test.Replacement EDG Ventilation Fan Breaker Installed & Verified Operable1995-11-16016 November 1995 Suppl to Special Rept Re Invalid Failure of Div II EDG When Diesel Room Standby Ventilation Fan Failed to auto-start During Monthly Operability Test.Replacement EDG Ventilation Fan Breaker Installed & Verified Operable RBG-41990, Final Special Rept:On 950119,Div II EDG Experienced Invalid Failure Due to Failure of Fan Supply Breaker to Close. Replacement Breaker Installed & Verified Operable & Bell Alarm Feature on Current Spare Breaker Will Be Replaced1995-09-22022 September 1995 Final Special Rept:On 950119,Div II EDG Experienced Invalid Failure Due to Failure of Fan Supply Breaker to Close. Replacement Breaker Installed & Verified Operable & Bell Alarm Feature on Current Spare Breaker Will Be Replaced RBG-41936, Interim Special Rept:On 950816,EDG Failed to Start During Monthly Operability Surveillance Due to Failure of Div II Starting Air Block & Vent Valve.Forward Block & Vent Valve Replaced & Surveillance Test Successfully Completed1995-09-12012 September 1995 Interim Special Rept:On 950816,EDG Failed to Start During Monthly Operability Surveillance Due to Failure of Div II Starting Air Block & Vent Valve.Forward Block & Vent Valve Replaced & Surveillance Test Successfully Completed RBG-41827, Special Rept Suppl:On 950119,Div II EDG Experienced Invalid Failure When Diesel Room Standby Ventilation Fan Failed to auto-start During Monthly Operability Test.Util Will Provide Suppl Rept Containing Results of Evaluation by 9509221995-08-14014 August 1995 Special Rept Suppl:On 950119,Div II EDG Experienced Invalid Failure When Diesel Room Standby Ventilation Fan Failed to auto-start During Monthly Operability Test.Util Will Provide Suppl Rept Containing Results of Evaluation by 950922 RBG-41601, Special Rept:On 950510,Div II EDG Incurred Valid Failure During Performance of Normal Monthly Surveillance Due to Fault in Voltage Regulator.Voltage Regulator Replaced1995-06-0808 June 1995 Special Rept:On 950510,Div II EDG Incurred Valid Failure During Performance of Normal Monthly Surveillance Due to Fault in Voltage Regulator.Voltage Regulator Replaced ML20081B3591995-03-0707 March 1995 Suppl Special Rept:On 941221,failure of Div II EDG Exhaust Bolts Occurred.Caused by Bending & Cycling Fatigue. Investigation Concluded Design Adequate.Gasket Replaced & Joint Properly Reassembled RBG-41197, Special Rept:On 950119,Div II EDG Experienced Invalid Failure When Diesel Room Standby Ventilation Fan Breaker Failed During Monthly Div II EDG Operability Test.Ge Type AKR-30 Breaker Returned to Vendor for Detailed Evaluation1995-02-14014 February 1995 Special Rept:On 950119,Div II EDG Experienced Invalid Failure When Diesel Room Standby Ventilation Fan Breaker Failed During Monthly Div II EDG Operability Test.Ge Type AKR-30 Breaker Returned to Vendor for Detailed Evaluation RBG-41166, Special Rept:On 941221,an Increase in EDG Exhaust Noise Noticed.Caused by Two Broken Bolts on Exhaust Manifold.Test Terminated & Four New Bolts Installed1995-01-20020 January 1995 Special Rept:On 941221,an Increase in EDG Exhaust Noise Noticed.Caused by Two Broken Bolts on Exhaust Manifold.Test Terminated & Four New Bolts Installed RBG-40865, Ro:On 940908,reactor Scram Occurred & NOUE Declared.Noue Subsequently Terminated on 940909.Initial Notification of States of La & Ms & Five Local Govts within 10-mile EPZ Completed & NRC Incident Response Ctr Notified1994-09-0909 September 1994 Ro:On 940908,reactor Scram Occurred & NOUE Declared.Noue Subsequently Terminated on 940909.Initial Notification of States of La & Ms & Five Local Govts within 10-mile EPZ Completed & NRC Incident Response Ctr Notified RBG-40632, Special Rept:On 940508,valid Start Failure Occurred on Div II Standby Diesel Generator.Caused by Exciter Shutdown Relay Not Reset.Credible Failure Modes Relate to Exciter Shutdown Relay Being Improperly Set in Latched Position for Start1994-06-0707 June 1994 Special Rept:On 940508,valid Start Failure Occurred on Div II Standby Diesel Generator.Caused by Exciter Shutdown Relay Not Reset.Credible Failure Modes Relate to Exciter Shutdown Relay Being Improperly Set in Latched Position for Start RBG-40484, Special Rept:On 940328,Channel 7 of Loose Part Detection Sys Declared Inoperable Due to Invalid Loose Part.Filter Adjusted to Reduce Channel Sensitivity of Background Noise Frequencies While Maintaining Ability to Detect Loose Parts1994-04-0808 April 1994 Special Rept:On 940328,Channel 7 of Loose Part Detection Sys Declared Inoperable Due to Invalid Loose Part.Filter Adjusted to Reduce Channel Sensitivity of Background Noise Frequencies While Maintaining Ability to Detect Loose Parts RBG-38879, Special Rept:On 930715,invalid Failure on Div II Standby DG Occurred Due to Trip Signal.New Switch Bench Calibrated1993-08-16016 August 1993 Special Rept:On 930715,invalid Failure on Div II Standby DG Occurred Due to Trip Signal.New Switch Bench Calibrated RBG-37720, Special Rept:On 921013,Div I EDG Automatically Shutdown During Regular Monthly Surveillance Test.Caused by Failure of Shutdown Control Valve P-4.Valve Replaced & Surveillance Test Completed Approx 12 H After Valid Failure1992-11-10010 November 1992 Special Rept:On 921013,Div I EDG Automatically Shutdown During Regular Monthly Surveillance Test.Caused by Failure of Shutdown Control Valve P-4.Valve Replaced & Surveillance Test Completed Approx 12 H After Valid Failure RBG-37-685, Suppl 1 to Special Rept:On 920901,abnormal Traces Observed on Primary & Secondary 150-ft Wind Direction Analog Chart Recorders.Caused by Aged/Weathered Cable.All Cables Running Between Instruments & Boom Junction Boxes Replaced1992-11-0505 November 1992 Suppl 1 to Special Rept:On 920901,abnormal Traces Observed on Primary & Secondary 150-ft Wind Direction Analog Chart Recorders.Caused by Aged/Weathered Cable.All Cables Running Between Instruments & Boom Junction Boxes Replaced RBG-37499, Suppl 2 to 910910 & 0930 Special Repts:On 901201 & 0712, Light Providing Failure Indication Illuminated on Loose Parts Monitoring,Channel 8 Module Illuminated,Indicating Low Background Noise.Caused by Softline Cable Degradation1992-09-18018 September 1992 Suppl 2 to 910910 & 0930 Special Repts:On 901201 & 0712, Light Providing Failure Indication Illuminated on Loose Parts Monitoring,Channel 8 Module Illuminated,Indicating Low Background Noise.Caused by Softline Cable Degradation RBG-37498, Special Rept:On 920901,abnormal Traces Observed on Primary & Secondary 150-ft Wind Direction Analog Chart Recorders. Possibly Caused by Natural Aging/Weathering During Hurricane Andrew.Meteorological Tower Instrumentation to Be Replaced1992-09-18018 September 1992 Special Rept:On 920901,abnormal Traces Observed on Primary & Secondary 150-ft Wind Direction Analog Chart Recorders. Possibly Caused by Natural Aging/Weathering During Hurricane Andrew.Meteorological Tower Instrumentation to Be Replaced RBG-37403, Notification of Unusual Event:On 920826,w/reactor Shut Down,Escalating Severe Weather Conditions from Hurricane Andrew Resulted in Wind Speeds Gusting to 60-65 Miles Per Hour.States of Ms & La & Local Govts Notified1992-08-28028 August 1992 Notification of Unusual Event:On 920826,w/reactor Shut Down,Escalating Severe Weather Conditions from Hurricane Andrew Resulted in Wind Speeds Gusting to 60-65 Miles Per Hour.States of Ms & La & Local Govts Notified RBG-37303, Suppl to 920701 Special Rept:On 920522,control Panel 1ERSNBI102 Could Not Be Adjusted to within Tolerances Specified.Caused by Internal Component Failure.Component Replaced & Seismic Instrumentation Restored1992-08-0303 August 1992 Suppl to 920701 Special Rept:On 920522,control Panel 1ERSNBI102 Could Not Be Adjusted to within Tolerances Specified.Caused by Internal Component Failure.Component Replaced & Seismic Instrumentation Restored RBG-37145, Special Rept:On 920622,meteorological Tower Aspirator Fault Light Found Lit During Routine Surveillance.Caused by Roosting Bird.Addl Repairs to 30 Foot Flow Switch Ongoing & Util Is Investigating Methods to Remove Roosting Bird1992-07-10010 July 1992 Special Rept:On 920622,meteorological Tower Aspirator Fault Light Found Lit During Routine Surveillance.Caused by Roosting Bird.Addl Repairs to 30 Foot Flow Switch Ongoing & Util Is Investigating Methods to Remove Roosting Bird RBG-37131, Special Rept:On 920707,employee Sustained Back Injury in Drywell & Transported to Hospital.Surveys of Injured Individual,Ambulance & Ambulance Driver Found No Contamination.States of La & Ms Notified1992-07-0808 July 1992 Special Rept:On 920707,employee Sustained Back Injury in Drywell & Transported to Hospital.Surveys of Injured Individual,Ambulance & Ambulance Driver Found No Contamination.States of La & Ms Notified RBG-37103, Special Rept:On 920522,determined That Control Panel 1ERS-NBI102 (Voltage Regulator/Timing Oscillator Board) Could Not Be Adjusted to within Specified Tolerances.Cause Not Determined.Supplemental Rept to Be Submitted by 9208031992-07-0101 July 1992 Special Rept:On 920522,determined That Control Panel 1ERS-NBI102 (Voltage Regulator/Timing Oscillator Board) Could Not Be Adjusted to within Specified Tolerances.Cause Not Determined.Supplemental Rept to Be Submitted by 920803 RBG-37043, Ro:On 920618,employee Injured While Working in Drywell. Complete Survey of Individual for Contamination Not Possible Prior to Transport of Individual to Hosp1992-06-19019 June 1992 Ro:On 920618,employee Injured While Working in Drywell. Complete Survey of Individual for Contamination Not Possible Prior to Transport of Individual to Hosp RBG-36986, Notification of Unusual Event:On 920612,employee Working in Contaminated Area Collapsed from Apparent Heat Exhaustion. Individual Transported to Hosp.No Evidence of Contamination Found in Hosp,Ambulance,Equipment or Personnel1992-06-15015 June 1992 Notification of Unusual Event:On 920612,employee Working in Contaminated Area Collapsed from Apparent Heat Exhaustion. Individual Transported to Hosp.No Evidence of Contamination Found in Hosp,Ambulance,Equipment or Personnel RBG-36858, Ro:On 920519,employee Sustained Injury in Steam Tunnel. Surveys Confirmed That Employees Protective Clothing Was Contaminated.Employee,Hospital,Ambulance,Associated Equipment & Personnel Were Surveyed Negative1992-05-20020 May 1992 Ro:On 920519,employee Sustained Injury in Steam Tunnel. Surveys Confirmed That Employees Protective Clothing Was Contaminated.Employee,Hospital,Ambulance,Associated Equipment & Personnel Were Surveyed Negative RBG-36852, Special Rept:On 920517,employee Sustained Head Injury in Drywell.Employee Considered Contaminated Because Area Was Contaminated.Subsequent Surveys of Injured Employee Found No Contamination1992-05-18018 May 1992 Special Rept:On 920517,employee Sustained Head Injury in Drywell.Employee Considered Contaminated Because Area Was Contaminated.Subsequent Surveys of Injured Employee Found No Contamination RBG-36705, Special Rept:Seismic Triaxial Response Spectrum Recorder Inoperable from 911216-920312.Caused by Lack of Familiarity W/Calibr of Equipment.Recorder Repaired by Replacing Missing Parts or Completely Replacing Individual Acceleromters1992-04-0606 April 1992 Special Rept:Seismic Triaxial Response Spectrum Recorder Inoperable from 911216-920312.Caused by Lack of Familiarity W/Calibr of Equipment.Recorder Repaired by Replacing Missing Parts or Completely Replacing Individual Acceleromters ML20092H5661992-02-13013 February 1992 Informational Rept:On 910228,hydraulic Control Unit 36-21 Found Leaking & Crack Discovered in Short,Horizontal Segment of Charging Water Piping.Caused by Fluid Transient.Reactor Scram History Developed RBG-36-097, Special Rept:On 911112,trip Occurred on DG 1EGS*EG1A During Performance of Regular Monthly Surveillance Test Procedure. Caused by Defective Low Pressure Lube Oil Pressure Switch. Defective Pressure Switch EGO*PS2A Was Replaced1991-12-10010 December 1991 Special Rept:On 911112,trip Occurred on DG 1EGS*EG1A During Performance of Regular Monthly Surveillance Test Procedure. Caused by Defective Low Pressure Lube Oil Pressure Switch. Defective Pressure Switch EGO*PS2A Was Replaced RBG-36010, Special Rept:On 911030,invalid Failure Occurred on Div III HPCS DG 1E22*EGS001 Due to Operator Error.Operations Personnel Shall Schedule Training to Ensure That Operations Personnel Understand Need for Proper Communications1991-11-25025 November 1991 Special Rept:On 911030,invalid Failure Occurred on Div III HPCS DG 1E22*EGS001 Due to Operator Error.Operations Personnel Shall Schedule Training to Ensure That Operations Personnel Understand Need for Proper Communications RBG-35-704, Suppl 1 to Special Rept:On 901201,failure Indication Received That Loose Parts Monitoring Channel 8 Detector Module Inoperable.Initially Reported on 910110.Caused by Degraded Softline Cable.Mod Scheduled in Mar 19921991-09-30030 September 1991 Suppl 1 to Special Rept:On 901201,failure Indication Received That Loose Parts Monitoring Channel 8 Detector Module Inoperable.Initially Reported on 910110.Caused by Degraded Softline Cable.Mod Scheduled in Mar 1992 RBG-35-501, Special Rept:On 910805,non-valid Failure of Div II Diesel Generator Occurred.Caused by Vibration Switch Malfunction. Switch Removed & Sent to Cooper Industries Enterprise Div for Insp1991-08-30030 August 1991 Special Rept:On 910805,non-valid Failure of Div II Diesel Generator Occurred.Caused by Vibration Switch Malfunction. Switch Removed & Sent to Cooper Industries Enterprise Div for Insp RBG-35-407, Special Rept:On 910716,meteorological Tower Temp Sensors & Meteorological Microcomputer Inoperable for More than 7 Days.Surveillance Test Procedure STP-554-4209 Revised to Require That Data Be Provided by One Collection Sys1991-08-0202 August 1991 Special Rept:On 910716,meteorological Tower Temp Sensors & Meteorological Microcomputer Inoperable for More than 7 Days.Surveillance Test Procedure STP-554-4209 Revised to Require That Data Be Provided by One Collection Sys RBG-35199, Special Rept:On 910409,initial Start Time for Voltage Exceeded Tech Spec 10 Max During Div III Diesel Generator Operability Test.Caused by Field Flash Relay Time Delay & Air Start Motors.Air Start Motors Replaced1991-06-0606 June 1991 Special Rept:On 910409,initial Start Time for Voltage Exceeded Tech Spec 10 Max During Div III Diesel Generator Operability Test.Caused by Field Flash Relay Time Delay & Air Start Motors.Air Start Motors Replaced RBG-34-970, Special Rept:On 910409,start Time of Div III Emergency Diesel Generator Exceeded Tech Spec Start Time of 10 S. Caused by Field Flash Relay Time Delay & Faulty Air Start Motors.Time Delay Adjusted & Motors Overhauled1991-05-0909 May 1991 Special Rept:On 910409,start Time of Div III Emergency Diesel Generator Exceeded Tech Spec Start Time of 10 S. Caused by Field Flash Relay Time Delay & Faulty Air Start Motors.Time Delay Adjusted & Motors Overhauled RBG-34-651, Special Rept:On 910220,valid Failure of Div I Diesel Generator at Plant Occurred.Caused by Valve Failure.Cleaning & Replacement of Internal Parts on Temp Control Valve Satisfactorily Restored1991-03-22022 March 1991 Special Rept:On 910220,valid Failure of Div I Diesel Generator at Plant Occurred.Caused by Valve Failure.Cleaning & Replacement of Internal Parts on Temp Control Valve Satisfactorily Restored RBG-34-559, Rev 1 to Ro:On 900905,discovered Cracked Turbocharger Axial Strut Support Plate on South End of Diesel Mfg by Transamerica Delaval,Inc.Caused by Improper fit-up Between Plate & Pipe Strut.Support Plate Redesigned & Installed1991-03-0101 March 1991 Rev 1 to Ro:On 900905,discovered Cracked Turbocharger Axial Strut Support Plate on South End of Diesel Mfg by Transamerica Delaval,Inc.Caused by Improper fit-up Between Plate & Pipe Strut.Support Plate Redesigned & Installed RBG-34-499, Revised Ro:From 901005-06,two 42X Relays in Div 1 Standby Cooling Tower Fans Experienced Failures,Rendering Fans Inoperable.Caused by Cracked Coils on Relays & Low Coil Resistance.Relays Replaced & Ventilation Sys Redesigned1991-02-15015 February 1991 Revised Ro:From 901005-06,two 42X Relays in Div 1 Standby Cooling Tower Fans Experienced Failures,Rendering Fans Inoperable.Caused by Cracked Coils on Relays & Low Coil Resistance.Relays Replaced & Ventilation Sys Redesigned RBG-34290, Special Rept:On 901201,loose Parts Monitoring Channel 8 Detector Module Illuminated,Indicating Channel Low Background Noise.Caused by Fault within Cable.Failed Portion of Channel Will Be Repaired or Replaced1991-01-10010 January 1991 Special Rept:On 901201,loose Parts Monitoring Channel 8 Detector Module Illuminated,Indicating Channel Low Background Noise.Caused by Fault within Cable.Failed Portion of Channel Will Be Repaired or Replaced RBG-34193, Ro:On 901011,in-line Continuous Recording Conductivity Monitor for Reactor Coolant Sys Inoperable & on 901111, Continuous Recording Conductivity Monitor Inoperable for Total of 31 Days & Remained Until 901201,total of 51 Days1990-12-20020 December 1990 Ro:On 901011,in-line Continuous Recording Conductivity Monitor for Reactor Coolant Sys Inoperable & on 901111, Continuous Recording Conductivity Monitor Inoperable for Total of 31 Days & Remained Until 901201,total of 51 Days RBG-34135, Special Rept:On 901109,Div III HPCS Diesel Generator Failed to Energize Emergency Buses within 10 Following Diesel Generator Start.Caused by Voltage Permissive Preventing Breaker Closure.Mod Request Initiated1990-12-10010 December 1990 Special Rept:On 901109,Div III HPCS Diesel Generator Failed to Energize Emergency Buses within 10 Following Diesel Generator Start.Caused by Voltage Permissive Preventing Breaker Closure.Mod Request Initiated RBG-34047, Special Rept:On 901021,invalid Failure of Div II Diesel Generator Occurred.Caused by Operator Error.Occurrence Discussed in Shift Briefings1990-11-20020 November 1990 Special Rept:On 901021,invalid Failure of Div II Diesel Generator Occurred.Caused by Operator Error.Occurrence Discussed in Shift Briefings RBG-33961, Informational Rept:During 901005-06,two 42X Relays in Div I Standby Cooling Tower Fans Experienced Failures Resulting in Loss of Control Room Indication.Caused by Overheating.Relays Replaced W/New J10 Relays.Addl Actions Will Follow Analys1990-11-0707 November 1990 Informational Rept:During 901005-06,two 42X Relays in Div I Standby Cooling Tower Fans Experienced Failures Resulting in Loss of Control Room Indication.Caused by Overheating.Relays Replaced W/New J10 Relays.Addl Actions Will Follow Analysi 1999-08-06
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARRBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With ML20206A2111999-04-21021 April 1999 Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205D5481999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With ML20198K2701998-12-22022 December 1998 Rev 1 to RBS Cycle 8 Colr RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20155H3491998-11-0303 November 1998 Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML20151S5421998-09-0303 September 1998 Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for River Bend Station RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 ML20249A6431998-06-12012 June 1998 SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 ML20203L6631998-02-11011 February 1998 Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 19971997-12-31031 December 1997 Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 ML20203H9891997-12-12012 December 1997 Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies ML20202E9941997-12-0101 December 1997 ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007) ML20199K9741997-11-30030 November 1997 Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 ML20202F0191997-11-28028 November 1997 Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee 1999-09-09
[Table view] |