ML20203G050

From kanterella
Revision as of 11:45, 14 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept:On 971111,valid Failure of Sdg 21 Occurred. Caused by Failed Governor Speed Setting Potentiometer.Sdg 21 Governor Speed Setting Potentiometer Replaced
ML20203G050
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 12/11/1997
From: Masse R
HOUSTON LIGHTING & POWER CO.
To:
NRC
References
NOC-AE-000036, NOC-AE-36, NUDOCS 9712180021
Download: ML20203G050 (5)


Text