Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20149H0301997-06-19019 June 1997 Comment Opposing Proposed Generic Communications Re Control Rod Insertion Problems ML20059C2351993-12-17017 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication ML20204G3081988-10-19019 October 1988 Order Imposing Civil Monetary Penalty in Amount of $50,000, Per 880506 Notice of Violation from Insp on 880301-17 ML20154K0301988-05-20020 May 1988 Transcript of 880520 Dicussion/Possible Vote in Rockville,Md Re Full Power OL for Facility.Pp 1-70.Related Info Encl ML20148G2161988-03-25025 March 1988 Decision.* Affirms Concluding Partial Initial Decision, LBP-87-14,25 NRC 461.Served on 880325 ML20149D8231988-02-0101 February 1988 Notice of Withdrawal.* Withdraws Appearance as Atty for Util in Proceeding,Effective 880201.Certificate of Svc Encl ML20236A8341987-10-21021 October 1987 Transcript of 871021 Proceedings in Bethesda,Md.Pp 1-100 ML20235K8741987-09-30030 September 1987 Notice of Oral Argument.* Oral Argument on Pending Appeal of Intervenors Bridget Little Rorem from Board 870519 Concluding Partial Initial Decision in Proceeding Will Be Heard on 871021.Served on 871002 ML20235H7121987-09-25025 September 1987 Memorandum & Order.* Intervenor Appeal from ASLB Rejection of late-filed Contention Dismissed & LBP-87-19 & LBP-87-22 Vacated on Grounds of Mootness Due to Util Withdrawing Amend Application.Served on 870928 ML20237L7461987-09-0303 September 1987 Order.* Oral Argument on Pending Appeal of Intervenors Bl Rorem Et Al from Licensing Board 870519 Concluding Partial Initial Decision in OL Proceeding Will Be Heard on 871021 in NRC Public Hearing Room.Served on 870903 ML20237L7721987-09-0101 September 1987 Reconstitution of Aslab.* Notice That Aslab Has Been Reconstituted for OL Proceeding.Board Will Consist of as Rosenthal,Wr Johnson & Ha Wilber.Served on 870902 ML20237L6931987-08-28028 August 1987 Decision.* Review of Licensing Board 870513 & 0706 Partial Initial Decisions Revealed No Error Necessitating Corrective Action.Result Reached by Licensing Board Re Decision LBP-87-13 Affirmed.Served on 870831 ML20237K0361987-08-11011 August 1987 NRC Staff Brief in Support of LBP-87-14.* Certificate of Svc Encl ML20236P1101987-07-31031 July 1987 Brief of Comm Ed.* Brief Filed Re Appeal by Bridget Little Rorem,Et Al from ASLB 870519 Concluding Partial Initial Decision.Appeal Shoud Be Denied & Decision Affirmed. Certificate of Svc Encl ML20236N9791987-07-31031 July 1987 NRC Staff Response to Aslab Order of 870721.* NRC Supports Deferral of Briefing of Intervenors Appeal Until Applicant Affirmation Re Withdrawal of License Amend Application Received.Bc Hunsader Encl.W/Certificate of Svc ML20236N8851987-07-31031 July 1987 Response to Intervenors Request for Deferral of Further Appellate Proceedings.* Forwards Util to NRC Withdrawing License Amend Applications Re Ownership.Pending Appeal Should Be Dismissed.Certificate of Svc Encl ML20235Y8711987-07-23023 July 1987 Appeal from Licensing Board Denial of Motion to Reopen Record.* Intervenors Rorem Appeal from Decision of Licensing Board of 870706 Denying Rorem Motion to Reopen Record for Purpose of Admitting Late Contention.W/Certificate of Svc ML20235Y9081987-07-21021 July 1987 Order.* Date for Filing Briefs Re Intervenor Appeal of Board 870706 Memorandum & Order Denying Motion for Reconsideration & Motion to Admit late-filed Contention Postponed Until Further Order by Board.Served on 870722 ML20234D0521987-07-0202 July 1987 Motion to Reopen Record to Admit late-filed Contention on Financial Qualifications.* Record Should Be Reopened Since Rule Barring case-by-case Financial Qualification Adjudication Not Applicable ML20235D6761987-07-0202 July 1987 Order.* Intervenors 870623 Motion That ASLB Reconsider 870610 Memorandum & Order Denying 870506 Motion to Reopen Record & 870701 Motion to Admit late-filed Contention Denied.Motion in Alternative Dismissed.Served on 870707 ML20234D0961987-07-0101 July 1987 Affidavit of DW Cassel.* Affidavit Re Intervenors Rorem,Et Al Motion to Reopen Record to Admit Late Filed Contention on Financial Qualification.Related Info Encl.W/Certificate of Svc & Svc List ML20216J8821987-07-0101 July 1987 Motion in Alternative Before Appeal Board.* Intervenors Hold That Jurisdiction Over 870701 Motion to Reopen Record to Admit Late Filed Contention on Financial Qualifications Remains W/Aslb.W/Svc List & Certificate of Svc ML20234D0361987-07-0101 July 1987 Opening Brief of intervenors-appellants Bridget Little Rorem,Et Al.* Board Majority Committed Errors of Fact & Law That Compel Reversal of 870519 Concluding Partial Initial Decision.Certificate of Svc Encl CLI-87-07, Order CLI-87-07.* ASLB Concluding Partial Initial Decision, Resolving All Contested Issues & Authorizing NRR to Issue Ol,Reviewed by Commission & Effective Immediately.Separate Views of Commissioner Asselstine Encl.Served on 8707011987-06-30030 June 1987 Order CLI-87-07.* ASLB Concluding Partial Initial Decision, Resolving All Contested Issues & Authorizing NRR to Issue Ol,Reviewed by Commission & Effective Immediately.Separate Views of Commissioner Asselstine Encl.Served on 870701 ML20235A7271987-06-30030 June 1987 Transcript of 870630 Discussion/Possible Vote in Washington, DC Re Full Power OL for Facility.Pp 1-70.Supporting Documentation Encl ML20216D1941987-06-22022 June 1987 Order.* Amend to 861107 Protective Order Which Resolved Dispute Between ASLB & Commission Ofc of Investigation Over Disclosure of Certain Investigatory Matls.Certificate of Svc Encl.Served on 870623 ML20215J8891987-06-19019 June 1987 Applicant Texas Utils Electric Co Petition for Directed Certification of Licensing Board Order of 870312.* Brief Supports Granting Petition to Vacate ASLB 870312 Order. Supporting Documentation & Certificate of Svc Encl ML20215D9241987-06-15015 June 1987 Memorandum on Licensing Board Jurisdiction.* Jurisdiction Over Intervenors 870506 Motion Retained Until Further Action of Licensing Board Due to Util 870528 Filing of Application for Amend to Ol.Served on 870616 ML20214W9601987-06-12012 June 1987 Transcript of 870612 Telcon in Washington,Dc.Pp 18,585- 18,596 ML20214W5031987-06-10010 June 1987 Memorandum & Order (Denying Intervenors Motion to Admit late-filed Contentions on Financial Qualifications).* Rorem, Et Al 870506 Motion Re Financial Qualifications of New co- Licensees Denied for Want of Jurisdiction.Served on 870611 ML20214W5491987-06-0909 June 1987 Notice of Reconstitution of Board.* Iw Smith,Chairman & Rf Cole & AD Callihan,Members.Served on 870610 ML20214W4911987-06-0909 June 1987 Order.* ASLB 870513 Partial Initial Decision Addressing Emergency Planning Issues Will Be Reviewed Sua Sponte & Will Not Be Deemed Final Until Further Order.No Appeal from Decision Received ML20214P0811987-06-0101 June 1987 Notice of Appeal.* Intervenor Bl Rorem,By Attys & in Accordance w/10CFR2.762,appeal ASLB 870519 Concluding Partial Initial Decision Re Plant Which Served on Parties on 870521.Notice of Appearance & Certificate of Svc Encl ML20214N0521987-05-28028 May 1987 Affidavit of Mj Wallace.* Affidavit of Mj Wallace Re Startup & Initial Criticality of Unit 1.W/Certificate of Svc ML20214N0471987-05-28028 May 1987 Affidavit of Jc Bukovski.* Affidavit of Jc Bukovski Re Delay in Startup,Testing & Commercial Operation of Unit 1 ML20214N0421987-05-28028 May 1987 Commonwealth Edison Co Comments to Commission on Immediate Effectiveness Issues.* Forwards Affidavits of Mj Wallace & Jc Bukovski.Requests Opportunity to Be Heard If Commission Contemplates Such Stay ML20214N4321987-05-26026 May 1987 NRC Staff Response to Motion to Admit late-filed Contention on Financial Qualifications.* Board Must Deny Motion to Admit late-filed Contention & Deny Request to Certify Question of Waiver to Commission.W/Certificate of Svc ML20214N3901987-05-22022 May 1987 Amend to Concluding Partial Initial Decision.* Amends 870519 Concluding Initial Decision to Delete Limited Authorization Granted NRR to Issue License for Low Power Testing,Due to Issuance of LBP-87-13 on 870513.Served on 870526 ML20214N0631987-05-19019 May 1987 Errata Correction.* Requests Pen & Ink Corrections to Minority Decision Pages Forwarded as Corrected Pages to Errata .Pages 73,74 & 75 Should Be Numbered as Pages 72,73 & 74,respectively.Served on 870529 ML20214N0851987-05-19019 May 1987 Errata.* Forwards Corrected Pages to Minority Opinion, Matters of Dissent.Served on 870528 ML20214G5141987-05-19019 May 1987 Response to Intervenor Motion Seeking to Reopen Record for Admission of New Contention.* Intervenor Filed Motion, Motion to Admit Late Filed Contention on Financial Qualifications. Affidavit & Certificate of Svc Encl ML20214N3431987-05-19019 May 1987 Errata to Concluding Partial Initial Decision (Ol).* Minor Editoral Corrections Listed.Served on 870528 ML20214G5921987-05-19019 May 1987 Concluding Partial Initial Decision (Ol).* Due to Violation Re Discouragement to Document Any Major Deficiency That Could Result in Lengthy Delay in Production,Civil Penalty Should Be Imposed on Comstock & Util.Served on 870521 ML20214G8701987-05-18018 May 1987 Notice of Reconstitution of Aslab.Gj Edles Chairman & WR Johnson & CN Kohl Members.Served on 870520 ML20213F9971987-05-13013 May 1987 Partial Initial Decision on Emergency Planning Issues.* ASLB Resolves All Outstanding Issues Re Offsite Emergency Favorably to Applicant Subj to Certain Info Being Included in Next Emergency Info Booklet.Served on 870514 ML20215K9991987-05-0606 May 1987 Motion to Admit late-filed Contention on Financial Qualifications.* Contention Based on Util 870406 Filing Re New Ownership & Financing for Facility.Affidavit & Certificate of Svc Encl ML20214F1991987-04-22022 April 1987 Applicant Exhibit A-188,consisting of Admitting Exhibit.Util Re General Ofc Records Audit,Lk Comstock Engineering Co,Inc 830110 Memo Re Audit Responses & 821101 General Insp Rept Re Torque Wrench Test Record Encl 1999-03-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20154K0301988-05-20020 May 1988 Transcript of 880520 Dicussion/Possible Vote in Rockville,Md Re Full Power OL for Facility.Pp 1-70.Related Info Encl ML20236A8341987-10-21021 October 1987 Transcript of 871021 Proceedings in Bethesda,Md.Pp 1-100 ML20235A7271987-06-30030 June 1987 Transcript of 870630 Discussion/Possible Vote in Washington, DC Re Full Power OL for Facility.Pp 1-70.Supporting Documentation Encl ML20214W9601987-06-12012 June 1987 Transcript of 870612 Telcon in Washington,Dc.Pp 18,585- 18,596 ML20215A1381986-12-0909 December 1986 Transcript of 861209 Telcon Hearing W/Applicant,Nrc & Intervenor.Pp 18,573-18,584 ML20214S4891986-12-0404 December 1986 Transcript of 861204 Telcon in Washington,Dc.Pp 18,462- 18,572 ML20214Q5981986-12-0303 December 1986 Transcript of 861203 Telcon in Washington,Dc.Pp 18,406- 18,461 ML20214M4281986-11-26026 November 1986 Transcript of 861126 Hearing in Chicago,Il.Pp 18,292-18,405 ML20214M4711986-11-25025 November 1986 Transcript of 861125 Hearing in Chicago,Il.Pp 18,009-18,291 ML20214M5501986-11-24024 November 1986 Transcript of 861124 Hearing in Chicago,Il.Pp 17,892-18,008 ML20214M4301986-11-21021 November 1986 Transcript of 861121 Hearing in Chicago,Il.Pp 17,782-17,891 ML20214G7721986-11-20020 November 1986 Transcript of 861120 Hearing in Chicago,Il.Pp 17,558-17,781. Supporting Documentation Encl ML20214M4621986-11-19019 November 1986 Transcript of 861119 Hearing in Chicago,Il.Pp 17,326-17,557 ML20207B4021986-11-18018 November 1986 Transcript of 861118 Hearing in Chicago,Il.Pp 17,202-17,325. Supporting Documentation Encl ML20214C7351986-11-17017 November 1986 Testimony of Rn Gardner Re Bl Rorem Subcontention 2.C Concerning Const Sample Reinsp Element of Const Assessment Program.Certificate of Svc Encl.Related Correspondence ML20214A0431986-11-13013 November 1986 Transcript of 861113 Hearing in Chicago,Il.Pp 17,067-17,201 ML20213G5581986-11-12012 November 1986 Transcript of 861112 Hearing in Chicago,Il.Pp 17,009-17,066 ML20213G5521986-11-0707 November 1986 Transcript of 861107 Hearing in Chicago,Il.Pp 16,913-17,008 ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20213D9741986-11-0606 November 1986 Transcript of 861106 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-307 Concerning Motion for Reformation in Plant.Pp 1-3 ML20211K4011986-11-0606 November 1986 Transcript of 861106 Hearing in Chicago,Il Re Testimony of LO Del George.Pp 16,710-16,912.Supporting Documentation Encl ML20213D5291986-11-0505 November 1986 Transcript of 861105 Hearing in Chicago,Il.Pp 16,661-16,709 ML20213C9891986-10-31031 October 1986 Transcript of 861031 Hearing in Chicago,Il.Pp 16,581-16,660. Supporting Documentation Encl ML20211H5081986-10-30030 October 1986 Transcript of 861030 Hearing in Chicago,Il.Pp 16,375-16,581 ML20211H4811986-10-30030 October 1986 Transcript of KT Kostal Rebuttal Testimony Re Rorem QA Subcontention 2 Concerning Harassment & Intimidation.Related Correspondence ML20211H5131986-10-29029 October 1986 Transcript of 861029 Hearing in Chicago,Il.Pp 16,182-16,374 ML20215M8991986-10-28028 October 1986 Transcript of 861028 Hearing in Chicago,Il.Pp 15,912- 16,181.Supporting Documentation Encl ML20211F6081986-10-27027 October 1986 Transcript of 861027 Hearing in Chicago,Il.Pp 15,802-15,911 ML20215M2811986-10-27027 October 1986 Rebuttal Testimony of J Hii Re Search for All Matl Receipt Repts Signed by J Seeders During 840808-17 & Response to Other Testimony Re Form 19 Checklist Signed by Dewald. Supporting Documentation Encl.Related Correspondence ML20197B4221986-10-24024 October 1986 Transcript of 861024 Hearing in Chicago,Il.Pp 15,696-15,801 ML20215H6581986-10-23023 October 1986 Testimony of at Simile Re Rorem/Archambeault Contention. Related Correspondence ML20215H7801986-10-23023 October 1986 Testimony of Jm Dominique Re Custody of Weld Test Coupons Used for Puckett 840822 Mock Weld Practical Test.Related Correspondence ML20215H6801986-10-23023 October 1986 Testimony of L Bossong Re Rorem/Archambeault Contention. Related Info Encl.W/Certificate of Svc & Svc List.Related Correspondence ML20215H8281986-10-23023 October 1986 Testimony of Pg Kosieniak Re Possession of Certain Weld Coupons Which Comstock Used for Testing QC Weld Inspectors. Related Correspondence ML20215H8501986-10-23023 October 1986 Testimony of If Dewald Re Mock Practical Test Taken by WO Puckett on 840822.Certificate of Svc Encl.Related Correspondence ML20215L6031986-10-23023 October 1986 Transcript of 861023 Hearing in Chicago,Il Re Testimony of TB Thorsell,Kt Kostal,Gf Marcus,Aj D'Antonio,Fd Forrest & TC Frazier.Pp 15,474-15,695 ML20215K7371986-10-22022 October 1986 Transcript of 861022 Hearing in Chicago,Il.Pp 15,271-15,473 ML20197B2521986-10-21021 October 1986 Transcript of 861021 Hearing in Chicago,Il.Pp 15,020-15,270 ML20211B9441986-10-17017 October 1986 Rebuttal Testimony of Dl Shamblin Re Involvement W/Comstock QC Dept,Puckett Termination,Seeders Transfer & Actions Taken to Address Comstock QC Inspector Concerns in Summer & Fall 1984.W/Certificate of Svc.Related Correspondence ML20197B2341986-10-17017 October 1986 Transcript of 861017 Hearing in Chicago,Il.Pp 14,913-15,019 ML20211D3471986-10-16016 October 1986 Transcript of 861016 Hearing in Chicago,Il Re Facilities.Pp 14,747-14,912 ML20211D9321986-10-16016 October 1986 Rebuttal Testimony of Cl Hulin Re Intervenor 850801 Allegations of Harassment & Intimidation of QC Inspectors. Certificate of Svc Encl.Related Correspondence ML20203P0921986-10-15015 October 1986 Transcript of 861015 Hearing in Chicago,Il.Pp 14,472-14,746 ML20211B4281986-10-10010 October 1986 Transcript of 861010 Hearing in Chicago,Il.Pp 14,354-14,471 ML20215F6721986-10-0909 October 1986 Transcript of 861009 Hearing in Chicago,Il.Pp 14,132-14,353. Supporting Documentation Encl ML20211A4341986-10-0808 October 1986 Transcript of 861008 Hearing in Chicago,Il Re Facility.Pp 13,859-14,131 ML20211A5971986-10-0707 October 1986 Transcript of 861007 Hearing in Chicago,Il.Pp 13,678-13,858 1999-03-02
[Table view] Category:DEPOSITIONS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20154K0301988-05-20020 May 1988 Transcript of 880520 Dicussion/Possible Vote in Rockville,Md Re Full Power OL for Facility.Pp 1-70.Related Info Encl ML20236A8341987-10-21021 October 1987 Transcript of 871021 Proceedings in Bethesda,Md.Pp 1-100 ML20235A7271987-06-30030 June 1987 Transcript of 870630 Discussion/Possible Vote in Washington, DC Re Full Power OL for Facility.Pp 1-70.Supporting Documentation Encl ML20214W9601987-06-12012 June 1987 Transcript of 870612 Telcon in Washington,Dc.Pp 18,585- 18,596 ML20215A1381986-12-0909 December 1986 Transcript of 861209 Telcon Hearing W/Applicant,Nrc & Intervenor.Pp 18,573-18,584 ML20214S4891986-12-0404 December 1986 Transcript of 861204 Telcon in Washington,Dc.Pp 18,462- 18,572 ML20214Q5981986-12-0303 December 1986 Transcript of 861203 Telcon in Washington,Dc.Pp 18,406- 18,461 ML20214M4281986-11-26026 November 1986 Transcript of 861126 Hearing in Chicago,Il.Pp 18,292-18,405 ML20214M4711986-11-25025 November 1986 Transcript of 861125 Hearing in Chicago,Il.Pp 18,009-18,291 ML20214M5501986-11-24024 November 1986 Transcript of 861124 Hearing in Chicago,Il.Pp 17,892-18,008 ML20214M4301986-11-21021 November 1986 Transcript of 861121 Hearing in Chicago,Il.Pp 17,782-17,891 ML20214G7721986-11-20020 November 1986 Transcript of 861120 Hearing in Chicago,Il.Pp 17,558-17,781. Supporting Documentation Encl ML20214M4621986-11-19019 November 1986 Transcript of 861119 Hearing in Chicago,Il.Pp 17,326-17,557 ML20207B4021986-11-18018 November 1986 Transcript of 861118 Hearing in Chicago,Il.Pp 17,202-17,325. Supporting Documentation Encl ML20214C7351986-11-17017 November 1986 Testimony of Rn Gardner Re Bl Rorem Subcontention 2.C Concerning Const Sample Reinsp Element of Const Assessment Program.Certificate of Svc Encl.Related Correspondence ML20214A0431986-11-13013 November 1986 Transcript of 861113 Hearing in Chicago,Il.Pp 17,067-17,201 ML20213G5581986-11-12012 November 1986 Transcript of 861112 Hearing in Chicago,Il.Pp 17,009-17,066 ML20213G5521986-11-0707 November 1986 Transcript of 861107 Hearing in Chicago,Il.Pp 16,913-17,008 ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20213D9741986-11-0606 November 1986 Transcript of 861106 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-307 Concerning Motion for Reformation in Plant.Pp 1-3 ML20211K4011986-11-0606 November 1986 Transcript of 861106 Hearing in Chicago,Il Re Testimony of LO Del George.Pp 16,710-16,912.Supporting Documentation Encl ML20213D5291986-11-0505 November 1986 Transcript of 861105 Hearing in Chicago,Il.Pp 16,661-16,709 ML20213C9891986-10-31031 October 1986 Transcript of 861031 Hearing in Chicago,Il.Pp 16,581-16,660. Supporting Documentation Encl ML20211H5081986-10-30030 October 1986 Transcript of 861030 Hearing in Chicago,Il.Pp 16,375-16,581 ML20211H4811986-10-30030 October 1986 Transcript of KT Kostal Rebuttal Testimony Re Rorem QA Subcontention 2 Concerning Harassment & Intimidation.Related Correspondence ML20211H5131986-10-29029 October 1986 Transcript of 861029 Hearing in Chicago,Il.Pp 16,182-16,374 ML20215M8991986-10-28028 October 1986 Transcript of 861028 Hearing in Chicago,Il.Pp 15,912- 16,181.Supporting Documentation Encl ML20211F6081986-10-27027 October 1986 Transcript of 861027 Hearing in Chicago,Il.Pp 15,802-15,911 ML20215M2811986-10-27027 October 1986 Rebuttal Testimony of J Hii Re Search for All Matl Receipt Repts Signed by J Seeders During 840808-17 & Response to Other Testimony Re Form 19 Checklist Signed by Dewald. Supporting Documentation Encl.Related Correspondence ML20197B4221986-10-24024 October 1986 Transcript of 861024 Hearing in Chicago,Il.Pp 15,696-15,801 ML20215H6581986-10-23023 October 1986 Testimony of at Simile Re Rorem/Archambeault Contention. Related Correspondence ML20215H7801986-10-23023 October 1986 Testimony of Jm Dominique Re Custody of Weld Test Coupons Used for Puckett 840822 Mock Weld Practical Test.Related Correspondence ML20215H6801986-10-23023 October 1986 Testimony of L Bossong Re Rorem/Archambeault Contention. Related Info Encl.W/Certificate of Svc & Svc List.Related Correspondence ML20215H8281986-10-23023 October 1986 Testimony of Pg Kosieniak Re Possession of Certain Weld Coupons Which Comstock Used for Testing QC Weld Inspectors. Related Correspondence ML20215H8501986-10-23023 October 1986 Testimony of If Dewald Re Mock Practical Test Taken by WO Puckett on 840822.Certificate of Svc Encl.Related Correspondence ML20215L6031986-10-23023 October 1986 Transcript of 861023 Hearing in Chicago,Il Re Testimony of TB Thorsell,Kt Kostal,Gf Marcus,Aj D'Antonio,Fd Forrest & TC Frazier.Pp 15,474-15,695 ML20215K7371986-10-22022 October 1986 Transcript of 861022 Hearing in Chicago,Il.Pp 15,271-15,473 ML20197B2521986-10-21021 October 1986 Transcript of 861021 Hearing in Chicago,Il.Pp 15,020-15,270 ML20211B9441986-10-17017 October 1986 Rebuttal Testimony of Dl Shamblin Re Involvement W/Comstock QC Dept,Puckett Termination,Seeders Transfer & Actions Taken to Address Comstock QC Inspector Concerns in Summer & Fall 1984.W/Certificate of Svc.Related Correspondence ML20197B2341986-10-17017 October 1986 Transcript of 861017 Hearing in Chicago,Il.Pp 14,913-15,019 ML20211D3471986-10-16016 October 1986 Transcript of 861016 Hearing in Chicago,Il Re Facilities.Pp 14,747-14,912 ML20211D9321986-10-16016 October 1986 Rebuttal Testimony of Cl Hulin Re Intervenor 850801 Allegations of Harassment & Intimidation of QC Inspectors. Certificate of Svc Encl.Related Correspondence ML20203P0921986-10-15015 October 1986 Transcript of 861015 Hearing in Chicago,Il.Pp 14,472-14,746 ML20211B4281986-10-10010 October 1986 Transcript of 861010 Hearing in Chicago,Il.Pp 14,354-14,471 ML20215F6721986-10-0909 October 1986 Transcript of 861009 Hearing in Chicago,Il.Pp 14,132-14,353. Supporting Documentation Encl ML20211A4341986-10-0808 October 1986 Transcript of 861008 Hearing in Chicago,Il Re Facility.Pp 13,859-14,131 ML20211A5971986-10-0707 October 1986 Transcript of 861007 Hearing in Chicago,Il.Pp 13,678-13,858 1999-03-02
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20154K0301988-05-20020 May 1988 Transcript of 880520 Dicussion/Possible Vote in Rockville,Md Re Full Power OL for Facility.Pp 1-70.Related Info Encl ML20236A8341987-10-21021 October 1987 Transcript of 871021 Proceedings in Bethesda,Md.Pp 1-100 ML20235A7271987-06-30030 June 1987 Transcript of 870630 Discussion/Possible Vote in Washington, DC Re Full Power OL for Facility.Pp 1-70.Supporting Documentation Encl ML20214W9601987-06-12012 June 1987 Transcript of 870612 Telcon in Washington,Dc.Pp 18,585- 18,596 ML20215A1381986-12-0909 December 1986 Transcript of 861209 Telcon Hearing W/Applicant,Nrc & Intervenor.Pp 18,573-18,584 ML20214S4891986-12-0404 December 1986 Transcript of 861204 Telcon in Washington,Dc.Pp 18,462- 18,572 ML20214Q5981986-12-0303 December 1986 Transcript of 861203 Telcon in Washington,Dc.Pp 18,406- 18,461 ML20214M4281986-11-26026 November 1986 Transcript of 861126 Hearing in Chicago,Il.Pp 18,292-18,405 ML20214M4711986-11-25025 November 1986 Transcript of 861125 Hearing in Chicago,Il.Pp 18,009-18,291 ML20214M5501986-11-24024 November 1986 Transcript of 861124 Hearing in Chicago,Il.Pp 17,892-18,008 ML20214M4301986-11-21021 November 1986 Transcript of 861121 Hearing in Chicago,Il.Pp 17,782-17,891 ML20214G7721986-11-20020 November 1986 Transcript of 861120 Hearing in Chicago,Il.Pp 17,558-17,781. Supporting Documentation Encl ML20214M4621986-11-19019 November 1986 Transcript of 861119 Hearing in Chicago,Il.Pp 17,326-17,557 ML20207B4021986-11-18018 November 1986 Transcript of 861118 Hearing in Chicago,Il.Pp 17,202-17,325. Supporting Documentation Encl ML20214C7351986-11-17017 November 1986 Testimony of Rn Gardner Re Bl Rorem Subcontention 2.C Concerning Const Sample Reinsp Element of Const Assessment Program.Certificate of Svc Encl.Related Correspondence ML20214A0431986-11-13013 November 1986 Transcript of 861113 Hearing in Chicago,Il.Pp 17,067-17,201 ML20213G5581986-11-12012 November 1986 Transcript of 861112 Hearing in Chicago,Il.Pp 17,009-17,066 ML20213G5521986-11-0707 November 1986 Transcript of 861107 Hearing in Chicago,Il.Pp 16,913-17,008 ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20213D9741986-11-0606 November 1986 Transcript of 861106 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-307 Concerning Motion for Reformation in Plant.Pp 1-3 ML20211K4011986-11-0606 November 1986 Transcript of 861106 Hearing in Chicago,Il Re Testimony of LO Del George.Pp 16,710-16,912.Supporting Documentation Encl ML20213D5291986-11-0505 November 1986 Transcript of 861105 Hearing in Chicago,Il.Pp 16,661-16,709 ML20213C9891986-10-31031 October 1986 Transcript of 861031 Hearing in Chicago,Il.Pp 16,581-16,660. Supporting Documentation Encl ML20211H5081986-10-30030 October 1986 Transcript of 861030 Hearing in Chicago,Il.Pp 16,375-16,581 ML20211H4811986-10-30030 October 1986 Transcript of KT Kostal Rebuttal Testimony Re Rorem QA Subcontention 2 Concerning Harassment & Intimidation.Related Correspondence ML20211H5131986-10-29029 October 1986 Transcript of 861029 Hearing in Chicago,Il.Pp 16,182-16,374 ML20215M8991986-10-28028 October 1986 Transcript of 861028 Hearing in Chicago,Il.Pp 15,912- 16,181.Supporting Documentation Encl ML20211F6081986-10-27027 October 1986 Transcript of 861027 Hearing in Chicago,Il.Pp 15,802-15,911 ML20215M2811986-10-27027 October 1986 Rebuttal Testimony of J Hii Re Search for All Matl Receipt Repts Signed by J Seeders During 840808-17 & Response to Other Testimony Re Form 19 Checklist Signed by Dewald. Supporting Documentation Encl.Related Correspondence ML20197B4221986-10-24024 October 1986 Transcript of 861024 Hearing in Chicago,Il.Pp 15,696-15,801 ML20215H6581986-10-23023 October 1986 Testimony of at Simile Re Rorem/Archambeault Contention. Related Correspondence ML20215H7801986-10-23023 October 1986 Testimony of Jm Dominique Re Custody of Weld Test Coupons Used for Puckett 840822 Mock Weld Practical Test.Related Correspondence ML20215H6801986-10-23023 October 1986 Testimony of L Bossong Re Rorem/Archambeault Contention. Related Info Encl.W/Certificate of Svc & Svc List.Related Correspondence ML20215H8281986-10-23023 October 1986 Testimony of Pg Kosieniak Re Possession of Certain Weld Coupons Which Comstock Used for Testing QC Weld Inspectors. Related Correspondence ML20215H8501986-10-23023 October 1986 Testimony of If Dewald Re Mock Practical Test Taken by WO Puckett on 840822.Certificate of Svc Encl.Related Correspondence ML20215L6031986-10-23023 October 1986 Transcript of 861023 Hearing in Chicago,Il Re Testimony of TB Thorsell,Kt Kostal,Gf Marcus,Aj D'Antonio,Fd Forrest & TC Frazier.Pp 15,474-15,695 ML20215K7371986-10-22022 October 1986 Transcript of 861022 Hearing in Chicago,Il.Pp 15,271-15,473 ML20197B2521986-10-21021 October 1986 Transcript of 861021 Hearing in Chicago,Il.Pp 15,020-15,270 ML20211B9441986-10-17017 October 1986 Rebuttal Testimony of Dl Shamblin Re Involvement W/Comstock QC Dept,Puckett Termination,Seeders Transfer & Actions Taken to Address Comstock QC Inspector Concerns in Summer & Fall 1984.W/Certificate of Svc.Related Correspondence ML20197B2341986-10-17017 October 1986 Transcript of 861017 Hearing in Chicago,Il.Pp 14,913-15,019 ML20211D3471986-10-16016 October 1986 Transcript of 861016 Hearing in Chicago,Il Re Facilities.Pp 14,747-14,912 ML20211D9321986-10-16016 October 1986 Rebuttal Testimony of Cl Hulin Re Intervenor 850801 Allegations of Harassment & Intimidation of QC Inspectors. Certificate of Svc Encl.Related Correspondence ML20203P0921986-10-15015 October 1986 Transcript of 861015 Hearing in Chicago,Il.Pp 14,472-14,746 ML20211B4281986-10-10010 October 1986 Transcript of 861010 Hearing in Chicago,Il.Pp 14,354-14,471 ML20215F6721986-10-0909 October 1986 Transcript of 861009 Hearing in Chicago,Il.Pp 14,132-14,353. Supporting Documentation Encl ML20211A4341986-10-0808 October 1986 Transcript of 861008 Hearing in Chicago,Il Re Facility.Pp 13,859-14,131 ML20211A5971986-10-0707 October 1986 Transcript of 861007 Hearing in Chicago,Il.Pp 13,678-13,858 1999-03-02
[Table view] |
Text
.. __ . _ _ _ _ _ _ _ .__ .___ . _ _ . . _ . _ _ . . _ _ .
,e j -
April 11, 1986 i gu.Ano CONNWM 00CMETED USNRC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION .gf ggg j4 pg;)$
j BEFORE THE ATOMIC SAFETY AND LICENSING BOARD 0FFICE OF ?:c .
00ChtipJ,.. t o,
- d#NC" 4 In the Matter of )
] )
l COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-456
) 50-457 j (Braidwood Station Units l'and 2) )
t TESTIMONY OF THOMAS B. THORSELL 4 (ON ROREM Q.A. SUBCONTENTION 8.B) j (Vulkene Wire) l Q.l. Please state your full name for the record.
i i A.l. Thomas B. Thorsell.
i Q.2. Who is your employer and what is your occupation? j 1
A.2. I am employed by Sargent & Lundy (S&L) as a Senior l
Electrical Project Engineer. My business address is l
i j 55 East Monroe Street, Chicago, Illinois 60603. I have been employed by S&L since June 1973. I am currently f assigned to commonwealth Edison Company's Braidwood Project.
i Q.3. What are your responsibilities with respect to the
! Braidwood Project?
I i
i A.3. As Senior Electrical Project Engineer for Braidwood, I am l
responsible for directing electrical engineers and j designers in the development of conceptual design, design i
! B604150386 860411 PDR ADOCK 05000456 T PDR
_ . _ _ _ _ . _ _ - _ _ - _ _ ..._. _ _._.-..__._.___.J
i l
l l of individual system components and preparation of procurement specifications. I evaluate the proposals of manufacturers, make purchase recommendations, and monitor l
the activities of manufacturers to ensure that l
1 manufacturers' drawings and finished components'are received on schedule. I work with the client, Commonwealth Edison Company, and with manufacturer and contractor representatives to assure that the electrical design, engineering, and construction of Braidwood l
incorporate the latest techniques. I also coordinate the work of the S&L electrical engineering department with that of other S&L departments and review specifications and drawings to ensure that all electrical work is correctly done.
1 Q.4. Please state your educational background and professional experience.
A.4. I have a Bachelor of Electrical Engineering and Master of Science in Electrical Engineering from the University of Minnesota. I am a' registered professional engineer in the State of Illinois.
I 1
In addition to the work described _in A.3, above, I have experience at S&L in the electrical design, engineering and analysis of steam-electric generating stations. This experience includes design and economic evaluation of i
o-i auxiliary power systems, review of electrical designs to assure compliance with various IEEE standards, including IEEE-323 and IEEE-383, and performance of a variety of studies covering grounding system design, power system reliability, power system expansion and distribution system protection. I have developed computer programs for l calculating power system reliability and for economic evaluation of power pool contracts between utility and l industrial generation.
Q.5. What is the purpose of your testimony?
A.S. My testimony explains the engineering evaluation performed by S&L to support the dispositioning of Commonwealth Edison's Nonconformance Report, NCR-707. S&L was requested by Commonwealth Edison to review NCR-707 and to i provide a recommendation regarding the disposition of the NCR. This NCR, which resulted from inspections conducted by the NRC's Construction Appraisal Team at Braidwood, questions the use of Vulkene wire in applications where switchboard wire qualified for harsh environments is required.
1 1
Q.6. What is Vulkene wire?
A.6. Vulkene wire is a brand name for an SIS type switchboard l
wire manufactured by the General Electric Company. SIS is l .
1 l
1 l, the' designation of a wire construction described in the 4
4 National Electric Code that is installed in switchboards.
l The National Electric Code requires switchboard wire to be i 1
flame retardant. Vulkene wire meets the Underwriters Laboratories Standard 44, " Rubber Insulated Wire and cables," requirements of the VW-1 (Vertical Wire) Flame
! Test.
A.7. What does the phrase " environmental qualification" mean?
A.7. Safety-related equipment installed in a nuclear power
'l plant like Braidwood must perform its intended function for the anticipated service conditions of the plant area in which it is installed. For electrical equipment, the service conditions include electrical characteristics, such as voltage, frequency and load; and environmental
]
- parameters, such as temperature, humidity, pressure and
) radiation exposure that are expected to be experienced as a result of normal operating conditions and postulated design basis accident conditions.
l l
l The service conditions, including environmental l
- parameters, experienced during normal operation are i
! accommodated during the design process of the electrical i equipment. Environmental qualification of electrical
) equipment located in harsh environments, that is, areas 3
l l
I where the environmental parameters change significantly l l
during postulated design basis accident conditions is )
demonstrated and documented by testing, operating experience or engineering analysis in accordance with '
applicable IEEE standards. Mr. Green's testimony explains the basis for determining harsh environmental areas for i the environmental qualification of switchboard wire used at Braidwood.
l Q.8. The NRC CAT inspection report suggests that switchboard wire for use at Braidwood should be qualified to ,
l IEEE-383-1974. Do you agree?
A.8. No. Switchboard wire is not required to be qualified to i IEEE-383-1974. IEEE-383-1974 is entitled " Standard for i
i Test of Class 1E Electric Cables, Field Splices, and Connections for Nuclear Power Generating Stations." The l requirements of this Standard are only mandatory for qualifying cables, field splices and connections.
IEEE-383-1974 may be used for switchboard wire qualification as a matter of discretion. However, i
Commonwealth Edison's commitment in its Braidwood FSAR '
limits the application of IEEE-383-1974 solely to cables, splices and connections.
l' Switchboard wire used in safety-related applications in harsh environments at Braidwood is qualified to
+
l l
l 1
. t.
IEEE-323-1974, which is entitled " Standard for Qualifying i Class lE Equipment for Nuclear Power Generating Stations."
The qualification of switchboard wire in accordance with IEEE-323-1974 meets the requirements of NRC's NUREG-0588, Rev. 1 and 10 CFR S 50.49.
Q.9. Is the Vulkene wire used at Braidwood environmentally qualified for all locations in the plant?
1 A.9. Vulkene wire used at Braidwood is acceptable for use for the service conditions experienced during normal 1
operation. Environmental qualification in accordance with IEEE-323-1974 has also been demonstrated and documented for some, but not all harsh environment applications.
Q.10. Please explain the basis for your determination that the Vulkene wire used at Braidwood meets the service conditions experienced during normal operation and, in addition, is environmentally qualified for some harsh environments.
A.10. The determination that Vulkene wire meets the service conditions experienced during normal operation is based on the fact that the wire meets the technical requirements ,
specified in CECO Standard EM-30105, " Switchboard Wire for Stations and Substations," which envelopes the service conditions experienced during normal operation.
I i
I l
- i The environmental qualification of Vulkene wire in harsh I environments is based on testing performed by Acton Environmental Testing Corporation. The tests were commissioned by Johnson Controls, Inc., as required by S&L, in conjunction with the qualification of HVAC control panels furnished by Johnson Controls to Braidwood. The ;
l
{
environmental parameters included in the test program enveloped the parameters for the environments in which the !
HVAC control panels were located. Vulkene wire has not been tested beyond these parameters for use at Braidwood. j i
i
\
The test results show that Vulkene wire is qualified for a temperature of 50*C, a relative humidity of 90% and a .
total integrated radiation exposure of 1 x 10 rads.
Therefore, the Vulkene wire used at Braidwood has been environmentally qualified in accordance with IEEE-323-1974 for use in these areas of the plant that may be exposed to environmental parameters up to and including a relative humidity of 90%, a temperature of 50'C and/or a total 7
integrated radiation exposure of 10 million (1 x 10 )
rads.
Q.11. Do you believe the test results are reliable?
A.11. Yes. Acton Environmental Testing Corporation's Quality Assurance Program has been reviewed and found to be an
s acceptable test facility by Commonwealth Edison's Quality Assurance Department.
In addition, before the Vulkene wire was tested, Sargent &
Lundy reviewed the Acton test procedure to ensure that the test would be conducted in accordance with the requirements of IEEE-323-1974. After the test was completed, the Acton test report was reviewed by S&L to ensure that the test had been performed in accordance with the reviewed test procedure. Test data was also reviewed to ensure that the available documentation supported the stated results. The review established that the test does support environmental qualification of the Vulkene wire for the parameters stated in A.9.
Q.12. Will plant locations at Braidwood experience harsh environmental conditions in excess of the parameters for which Vulkene wire is environmentally qualified?
A.12. Yes, some plant locations would exceed the temperature or radiation parameters for which Volkene wire is environmentally qualified as a result of either a loss of coolant accident or high energy line break accident. The plant locations include the the containment Building, Main Steam Piping Tunnel, Auxiliary Steam Piping Tunnel, and Safety Valve Rooms.
O O
Q.13. Could Vulkene wire have been improperly installed in those locations at Braidwood?
A.13. Yes. Some safety-related electrical equipment is located in the areas indicated in A.ll. and switchboard wire has been installed by the electrical contractor in some of
, this equipment. Since CECO had not determined where the vulkene was installed, S&L assumed, for purposes of dispositioning NCR 707, that Vulkene wire was installed in these locations.
I
- Q.14. Has S&L recommended any corrective action with respect to NCR-707?
A.14. Yes. S&L recommended that NCR-707 be dispositioned by examining the safety-related equipment for Vulkene wire located in plant areas subject to environments for which vulkene wire is not qualified. S&L recommended that any Vulkene wire so identified be replaced with qualified l l l wire, i Q.15. How were the specific locations identified in the plant where Vulkene wire may be improperly installed?
I A.15. These locations were identified by a review of Table 3.11-2 of the Braidwood FSAR. Table 3.11-2 lists each area in the plant and its assigned environmental zone.
The boundaries for the environmental zones identified in the table are defined on zone maps which are also included
.. . , , - . . - . - - ~ . - . .-. . ... . . - . -. - ...
0 I
l
\
- in Section 3.11 of the FSAR.. Environmental parameters l
! l l such as temperature, pressure, humidity and radiation are l l l also listed on Table 3.11-2 for all environmental zones
- within the plant. The values listed for each of'the !
l l parameters are maximum calculated values which may be ;
i i experienced within the zone during normal operating l
conditions as well as during or after a design basis l
accident. Thus, an examination of Table 3.11-2 and the zone maps permit the ready identification of specific '
locations where vulkene wire may have been improperly installed.
Q.16. How did you identify safety-related electrical equipment located in these harsh environmental zones where switchboard wire is installed?
A.16. The Braidwood environmental qualification list identifies all safety-related electrical equipment and identifies the l
environmental zone in which the equipment is located. l This list was examined to identify all safety-related equipment located in harsh environmental zones for which Vulkene wire is not qualified. The resulting list of safety-related equipment was the subject of the examination for Vulkene wire.
Q.17. Mr. Gieseker's testimony indicates that Vulkene wire rather than switchboard wire qualified for use in all
i plant areas at Braidwood was obtained because CECO's Engineering Department had not issued a purchase specification. What corrective action, if any, was taken with respect to this matter?
A.17. It was determined that the reason a purchase specification
\
for switchboard wire was not available was due to the fact that the requirement for the wire had been deleted from a specification covering a number of items and a specification for switchboard wire had never been reissued. S&L was directed by CECO's Engineering Department to review safety-related specifications to determine if any purchased items had been deleted in subsequent amendments to specifications without creating a specification for such items or relocating such items into another specification.
Q.18. What was the result of the review?
A.18. S&L reviewed 80 safety-related specifications in the l electrical (14) and mechanical (66) areas. It was determined that no other instances existed in which specified items were deleted from specifications and then not reissued. Based on finding no other instances, it was concluded that no further corrective action is required.
l l