Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station ColrML20197C501 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
09/04/1998 |
---|
From: |
BOSTON EDISON CO. |
---|
To: |
|
---|
References |
---|
NUDOCS 9809140044 |
Download: ML20197C501 (4) |
|
|
---|
Category:FUEL CYCLE RELOAD REPORTS
MONTHYEARML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20137S7341997-03-27027 March 1997 Rev 12A to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20133A8511996-12-0404 December 1996 PNPS Core Operating Limits Rept, Rev 11D ML20106G4871996-02-16016 February 1996 Rev 11C to Pilgrim Nuclear Power Station PNS Colr ML20086H0211995-06-0606 June 1995 Rev 11B, Pilgrim Nuclear Power Station PNPS Colr ML20086H0191995-04-19019 April 1995 Rev 11A to Pilgrim Nuclear Power Station PNPS Colr ML20092G9321995-02-28028 February 1995 Rev 0 to Suppl Reload Licensing Rept for Pilgrim Nuclear Power Station Reload 10 Cycle 11 ML20044G8631993-05-13013 May 1993 Rev 10A to Pilgrim Nuclear Power Station Colr,Cycle 10. ML20077J8401991-07-11011 July 1991 Rev 9A to, Pilgrim Nuclear Power Station Core Operating Limits Rept (Cycle 9) ML20028H7571990-12-26026 December 1990 Rev 8A to Pilgrim Nuclear Power Station Core Operating Limits Rept,Cycle 8. ML20062E9231990-11-0505 November 1990 Rev 0 to Pilgrim Nuclear Power Station Core Operating Limits Rept,Cycle 8 ML20062E3651990-09-30030 September 1990 Rev 1 to Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station Reload 7 Cycle 8 ML20028G8121990-08-20020 August 1990 Core Operating Limits Rept, Cycle 8. ML20214Q1471986-12-23023 December 1986 Rev 0 to GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station Reload 7 ML20093E2221984-03-31031 March 1984 Rev 0 to GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6 ML20083H9201983-10-31031 October 1983 GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6 ML20073A2341982-09-30030 September 1982 Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station Unit 1,Reload 5 ML19309D0141980-03-27027 March 1980 Suppl 1 to Supplemental Reload Licensing Submittal for Reload 4. ML19260C3661979-11-30030 November 1979 Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station Unit 1,Reload 4, Supporting Changes to App a of Tech Specs 1999-06-23
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
7 ;#5if '
NUCLEAR' ORGAN 1ZATION . - ' .
' , AqQR
~'
CONTROLLED DOCUMENT TRANSMITTAL NOTICE s DOCUMENT TITLE: MM TO: Y. $ YtJC fe & r ken y /c +6 e V on)m/SSIO M MAT 1 o 98- g23 d A 9
CONTROLLED COPY NO. '8d TRANSMITTAL NO. DATE 9#[
FOR DOCUMENT CONTROL USE ONLY
/P 1. The attached controlled document (s) are transmitted for your use. ,
Please insert / remove as indicated on the attached Change Instruction Notice. Please check Block 6, sign this form and return upon receipt.
/~7 2. The controlled document (s) listed on the attached Change I Instruction Notice have been retired from use. Please check !
Block 7, sign this form and return upon receipt.
/ 7 3. This is your notice. The document (s) indicated above were transmitted to you on .
Please check the l status of your controlled copy, sign this document and return. !
If you do not have these documents, check Block 5 and a new l copy will be issued. l l
/~7 4. Your name has been removed from the Distribution List of the !
controlled document listed above. Please check Block 7, sign this form and return it with the document to the Document Control Supervisor.
COPY HOLDER CHECK ONE
/ 7 5. I am not currently in possession of the above documents. Please issue another set to me.
/76. I have received from the sender the material and attachments as indicated above, and I have updated my controlled manual l accordingly.
/~7 7. I am returning the documents listed above. /
{
PLEASE SIGN AND RETURN TO: Controlled Document Clerk, MAIL STOP #19 NO ENVELOPE REQUIRED FOR INTERNAL COMPA2E MAIL e of I,
Boston Edison Company, Controlled Document Clerk 600 Rocky Hill Road, Support Building Plymouth, Massachusetts 02360
' [j f'. ( 1 b Date Signature of Holder Controlled Copy No.
t DR a P
CHANGE INSTRUCTION NOTICE (CIN) v ..g . 4y., ;a w,;- vy.,s3. q it,pg,),
Transmittcl Ha. : 98- $94 A Dr.to
/g/98- ,
Please update your copy of O d L A with th'e attachments to this transmittal as instructed below. -
REV. -
REV.
REMOVE AND DISCARD NO. INSERT NO ._
Ms Y /$D .59, N /5 C-V f nx u &^ V f
/26 nu r n c_
(/ f f (/
1 % - en t s n w b M J- &
cs~, s. & "r Fml1A
[
k
~~~ ~ ^
.*gge _
ye ,e ,
-4 ,j e . c.~ c. ;
+ - ,ygpp].perdhwiQg@s PILGRIM NUCLEAR POWER STATION o, PNPS CORE OPERATING LIMITS REPORT RTYPE: G4.02 LIST OF TABLES Number Title P_ase 3.2-1 LHGR Operating Limits 10 3.3-1, Sh. I of 2 MOC MCPR Operating Limits 20 3.3-1, Sh. 2 of 2 EOC MCPR Operating Limits 21 COLR REVISION 12C PAGE 4 OF 26
, 7;,;jgy;bQ
^ ^ - ~ ~ ^
paga , 4;- , ,
7 3,,,
PILGRIM NUCLEAR POWER STATION PNPS CORE OPERATING LIMITS REPORT RTYPE: G4.02
. LIST OF FIGURES Number Title P_ age 3.1-1 Maximum Average Planar Linear Heat Generation 11 Rate (MAP.LHGR) for Fuel Type BP8DQB323 3.1-2 Maximum Average Planar Linear Heat Generation 12 )
Rate (MAPLHGR) for Fuel Type BP8HXB355 ;
3.1-3 Maximum Average Planar Linear Heat Generation 13
)
Rate (MAPLHGR) for Fuel Type BP9 HUB 378 3.1-4 Maximum Average Planar Linear Heat Generation 14 Rate (MAPLHGR) for Fuel Type P9 DUB 408-6G5.0/7G4.0 3.1-5 Maximum Average Planar Linear Heat Generation 15 Rate (MAPLHGR) for Fuel Type P9 DUB 408-16GZ1 3.1-6 Flow-Dependent MAPLHGR Factor (MAPFACv) 16 3.1-7 Power-Dependent MAPHLGR Factor (MAPFACp) 17 I
3.3-1 Flow-Dependent MCPR Limits (MCPRr) 22 3.3-2 Power-Dependent MCPR Limits (MCPRp) 23 3.4-1 Power / Flow Operating Map 25 4.0-1 Reactor Vessel Core Loading Pattern 26 COLR REVISION 12C PAGE 5 OF 26