PNO-III-88-052, on 880528,water Hammer in RWCU Sys Damaged Fitting on 5/8 Inch Instrument Line & Caused Leak of Steam & Water Into RWCU Sys Pump Room.Caused by Water Hammer. Instrument Line Repaired

From kanterella
Revision as of 17:12, 23 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-III-88-052:on 880528,water Hammer in RWCU Sys Damaged Fitting on 5/8 Inch Instrument Line & Caused Leak of Steam & Water Into RWCU Sys Pump Room.Caused by Water Hammer. Instrument Line Repaired
ML20197E180
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/01/1988
From: Cooper R, Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-88-052, PNO-III-88-52, NUDOCS 8806080112
Download: ML20197E180 (2)


,

PRELIMlhARY N0llFICATION OF EVENI OR UNUSUAL OCCURRENCE--PNO-!P 88-52 Date June 1,1988 g Ihis preliminary notification constitutes EARLY notice of events of POSSIBLE safety N or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date.

Facility: Detroit Edison Company -Licensee Emergency Classification:

Fermi 2 Notification of an Unusual Event Newport, MI 48166 Alert Site Area Emergency Docket No. 50-341 General Eriergency X Not Applicable

Subject:

LEAK FROM REACTOR WATER CLEANUP SYSTEM AND RESULTING CONTAMINATION About 3:15 a.m.-(EDT) on May 28, 1988, a water hammer in the reactor water cleanup system damaged a fitting on a 5/8 inch instrument line and caused a leak of steam and water into the reactor water cleanup system pump room. The water hammer occurred when the system was restored to service following a routine surveillance test. Reactor operators promptly shut off the flow into the system, but water and steam continued to spray through the fitting for about 15 minutes until pressure in the line dropped. The licensee's examination showed that the compression fitting had separated as a result of the pressure caused by the water hammer.

Additionally, there was evidence that the fitting may have been damaged by personnel working in the area, and/or may not have been properly made up with full engagement.

The reactor building was evacuated following the incident. The clothing of three workers in the area of the leak was contaminated, but there was no evidence of any internal deposition of radioactivity.

The unit was at 50 percent power. The incident did not affect plant operations. The licensee subsequently repaired the failed instrument line and took the unit to 76 percent power for planned testing.

Initial radiological surveys did not show any significant airborne radioactivity in the reactor building. Workers performing repair and decontamination work did not initially wear respirators.

As the water evaporated, however, there were increased levels of airborne contamination. The licensee reported that there was generalized removable contamination of the first four floors of the reactor building in excess of 1,000 disintegrations per minute (dpm) per 100 square centimeters. the contamination level in the area surrounding the leak was in excess of 100,000 dpm. Three workers were exposed to airborne contamination, but nasal smears and whole body counts showed the exposures to be minimal.

8806080112 880601 PDR I&E PNO-III-88-052 DCD r DISTRIBUTION:

! WFN 1 NMBB Phillips ELW WFN 1 l

Chairman Zech AE00 NRR (FIA NMSS l

l Comm. Roberts Comm. Carr ARM E00 01 SLITP Mail To:

d M X

Comm. Rogers PA Resident Inspector Offices DCS (Original)

SEcY OGC Resident Inspector D0T (Trans. Only) o\

OBD-H CA FAX TO: Nicholson Lane Regions GPA INPO/ON8 RES Region I ACRS NSAC / KO Region II PDR Licensee / A.*d o Region IV HQS.OperationsOfficer/J/#- Region V Region III

._ _ ww_ggy _

. PRE 4.IMINARY NOTIFfCATION 0F_ EVENT OR UNUSUAL OCCURRENCE--PNO-Ill-88-52 Date June 1, 1988 Decontamination work is continuing. According to the licensee, there has been no evidence of any. radioactive releases to the environment associated with this incident.

Region III (Chicago) has sent two radiation specialists to review the licensee's handling of the radiological aspect of this incident. The resident inspector has been following the repair activities and the licensee's evaluation of the cause of the incident.

The State of Michigan will be notified.

Region III received notification of this ',ncident from the Headquarters Operation Center about 5:30 a.m. on May 28, 1988. This i , formation is current as of 8 a.m. , June 1,1988.

p%

Cooper U).%

CONIACT: pR. Knop H S 388-5578 FTS 388-5547

(

l-l l

\

4