ML20199G552

From kanterella
Revision as of 11:33, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 4 to AP-404, Loss of Decay Heat Removal & Rev 4 to AP-604, Waterbox Tube Failure
ML20199G552
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/13/1999
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199G556 List:
References
NUDOCS 9901220326
Download: ML20199G552 (1)


Text

_. ~ _ - ..- - . . - - - - . .__ . . .. .. - ,- .

'I i

Document Transmittal #: 110270 Date: 1/13/99 Tc: NRC (DC DESK) MAC: N/A Holder #: 1242 Destination:

Description:

Copy Totals i Document: Revision: il IC# Comment: INF CTL MST l

- APO404 04 MINOR CHANGE 1 0 0 AP0604 04 MINOR CHANGE 1 0 0 I

J 1

. I e

i 4

i I

instructions to the Addressee: Please verify the document (s) received agrees with the above  ;

information. Notify Document Control if changes are required to addressee information, or mark I the transmittal and return as indicated below . ,

Engmesmg managens are required by NEP-121 to determine if new, revised, or temporary changes to procedures affect job functions of their personnel. Managers will communicate change information ,

appropriately and provide documentation of any training conducted to the Engineering Training Coordinator.

3 Operations department must attach old document (s) or portions of document (s) superseded by the above 1 to this transmittal.

The signature indicates acknowdsogment of receipt of the above document (s) and that documents have been updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mall code:

SA2A

] Florida Power Corporation 4 Document Control, sA2A Crystal River Energy Complex 16760 W. Power Line St. d h20003 Crystal River, FL 34428-8708 Signature of Addressee: Date:

9901220326 990113 PDR ADOCK 05000302 P PDR