|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217C1311999-10-0808 October 1999 Safety Evaluation Supporting Amend 153 to License DPR-3 ML20211J3361999-08-27027 August 1999 Safety Evaluation Supporting Amend 152 to License DPR-3 ML20207F9491999-03-0505 March 1999 Safety Evaluation Supporting Amend 151 to License DPR-3 ML20202H5871999-02-0303 February 1999 Safety Evaluation Supporting Amend 150 to License DPR-3 ML20249A7901998-06-17017 June 1998 Safety Evaluation Supporting Amend 149 to License DPR-3 ML20237F1671993-02-19019 February 1993 Safety Evaluation Supporting Amend 147 to License DPR-3 ML20058F2201990-11-0202 November 1990 Safety Evaluation Accepting Util Response to Generic Ltr 83-28 Re post-trip Review - Data & Info Capability ML20058C4061990-10-22022 October 1990 Safety Evaluation Supporting Amend 137 to License DPR-3 ML20059G2411990-09-0606 September 1990 Safety Evaluation Supporting Amend 135 to License DPR-3 ML20058L6651990-08-0202 August 1990 Safety Evaluation Supporting Amend 134 to License DPR-3 ML20058L0321990-08-0202 August 1990 Safety Evaluation Supporting Amend 133 to License DPR-3 ML20055C8601990-06-18018 June 1990 Safety Evaluation Supporting Amend 132 to License DPR-3 ML20248H7391989-10-0303 October 1989 Safety Evaluation Not Accepting Procedure Generating Program for Plant.Program Should Be Revised to Reflect Items Described in Section 2 of Rept.Revision Need Not Be Submitted to NRC ML20247F1431989-09-0707 September 1989 Safety Evaluation Supporting Amend 124 to License DPR-3 ML20247E6831989-08-31031 August 1989 Safety Evaluation Supporting Amend 123 to License DPR-3 ML20246F2771989-07-11011 July 1989 Safety Evaluation Supporting Mods to ECCS Evaluation Model, Including Changes to FLECHT-based Reflood Heat Transfer Correlation,Steam Cooling Model & post-critical Heat Flux Heat Transfer Model ML20195D6701988-11-0101 November 1988 Safety Evaluation Supporting Amend 120 to License DPR-3 ML20205G1961988-10-25025 October 1988 Safety Evaluation Supporting Amend 119 to License DPR-3 ML20204G4871988-10-17017 October 1988 Safety Evaluation Supporting Amend 118 to License DPR-3 ML20205C4061988-10-14014 October 1988 Safety Evaluation Supporting Amend 117 to License DPR-3 ML20207L7051988-10-12012 October 1988 Safety Evaluation Supporting Amend 116 to License DPR-3 ML20207E8151988-08-0505 August 1988 Safety Evaluation Supporting Amend 115 to License DPR-3 ML20151M4911988-07-29029 July 1988 Safety Evaluation Supporting Amend 114 to License DPR-3 ML20151K3801988-07-25025 July 1988 Safety Evaluation Supporting Amend 113 to License DPR-3 ML20151K8571988-07-19019 July 1988 Safety Evaluation Supporting Amend 112 to License DPR-3 ML20153A8661988-06-29029 June 1988 Safety Evaluation Accepting Util Proposed Reflood Steam Cooling Model ML20196K2741988-06-28028 June 1988 Safety Evaluation Supporting Amend 111 to License DPR-3 ML20195K1501988-06-17017 June 1988 Safety Evaluation Supporting Amend 110 to License DPR-3 ML20195C5851988-06-13013 June 1988 Safety Evaluation Supporting Amend 109 to License DPR-3 ML20155K5141988-06-0909 June 1988 Safety Evaluation Supporting Amend 108 to License DPR-3 ML20154J7661988-05-18018 May 1988 Safety Evaluation Supporting Amend 107 to License DPR-3 ML20216J4081987-06-26026 June 1987 Safety Evaluation Supporting Amend 106 to License DPR-3 ML20216C1111987-06-18018 June 1987 Safety Evaluation Granting Three of Seven Requests Submitted by Util for Relief from Inservice Insp & Testing Requirements.Four Requests Withdrawn,Per 870122,0410 & 0507 Ltrs ML20215C5881987-06-0404 June 1987 Safety Evaluation Supporting Util 860505,870402,& 0506 Submittals Re Seismic Reevaluation of Plant.Concludes That Foundation Soils Under Reactor & Under Vapor Container Have Adequate Strength to Support Seismic Load from Earthquake ML20213G9161987-05-13013 May 1987 Safety Evaluation Supporting Amend 105 to License DPR-3 NUREG-0825, Safety Evaluation Supporting Util 840709,1231 & 851024 Repts Re Evaluation of Plant for Wind & Tornado Events as Requested in Integrated Plant Safety Assessment Rept, Sections 4.5 & 4.8.Risk from Wind/Tornado Events Assessed1987-05-13013 May 1987 Safety Evaluation Supporting Util 840709,1231 & 851024 Repts Re Evaluation of Plant for Wind & Tornado Events as Requested in Integrated Plant Safety Assessment Rept, Sections 4.5 & 4.8.Risk from Wind/Tornado Events Assessed ML20213D9671987-05-0707 May 1987 Safety Evaluation Supporting Amend 104 to License DPR-3 ML20207S6231987-03-10010 March 1987 Safety Evaluation Supporting Util 860122,0812,1028 & 870204 Submittals Re Fracture Toughness Requirements for Protection Against PTS Events ML20211N5881987-02-19019 February 1987 Safety Evaluation Re First Level Undervoltage Protection Testing.Testing Unnecessary ML20211L3951987-02-17017 February 1987 Safety Evaluation Supporting Amend 103 to License DPR-3 Re Max Nominal Enrichment of Fuel ML20207N8811987-01-0707 January 1987 Safety Evaluation Supporting Amend 102 to License DPR-3 ML20207N4261987-01-0606 January 1987 Safety Evaluation Supporting Amend 101 to License DPR-3 ML20207J9451986-12-30030 December 1986 SER Accepting Util 831105 & 850709 Responses to Generic Ltr 83-28,Item 2.1 (Part 2), Vendor Interface Program - Reactor Trip Sys Components ML20215E1201986-12-0909 December 1986 Safety Evaluation Supporting Util 830419 & 0830,840119, 851022 & 860930 Responses Re Conformance to Reg Guide 1.97. Plant Design Acceptable W/Exception of Neutron Flux Variable ML20214X3391986-12-0101 December 1986 Safety Evaluation Supporting Amend 100 to License DPR-3 ML20214J8521986-11-18018 November 1986 Sser Accepting SPDS Contingent Upon Resolution of Concerns Re Maint & Improvement of Placement & Visual Access of Containment Isolation Panel & Minor Human Factors Engineering Concerns ML20215E6471986-10-0202 October 1986 Safety Evaluation Supporting Util Requests for Exemption from Specific Requirements in App R to 10CFR50.Existing Fire Protection Provides Level of Protection Equivalent to Technical Requirements of App R ML20210S1791986-09-23023 September 1986 Safety Evaluation Supporting Amend 99 to License DPR-3 ML20212Q1151986-08-27027 August 1986 Safety Evaluation Supporting Util 830412 Proposal to Provide Integrated Safe Shutdown Sys Which Could Be Used for Safe Shutdown in Event of Fire at Facility ML20212N0161986-08-20020 August 1986 Safety Evaluation Supporting Amend 98 to License DPR-3 1999-08-27
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217C1311999-10-0808 October 1999 Safety Evaluation Supporting Amend 153 to License DPR-3 ML20211J5111999-08-31031 August 1999 Rev 29 to Yankee Decommissioning QA Program ML20211J3361999-08-27027 August 1999 Safety Evaluation Supporting Amend 152 to License DPR-3 ML20209D5391999-06-22022 June 1999 Rev 29 to Yaec Decommissioning QA Program ML20207F9491999-03-0505 March 1999 Safety Evaluation Supporting Amend 151 to License DPR-3 ML20202H5871999-02-0303 February 1999 Safety Evaluation Supporting Amend 150 to License DPR-3 ML20154P9691998-10-16016 October 1998 Rev 28 to Yankee Atomic Electric Co Decommissioning QA Program ML20249A7901998-06-17017 June 1998 Safety Evaluation Supporting Amend 149 to License DPR-3 ML20216C4581998-02-27027 February 1998 Response to NRC Demand for Info (NRC OI Rept 1-95-050) ML20203L1931998-02-25025 February 1998 Duke Energy Corp,Duke Engineering & Svcs,Inc,Yankee Atomic Small Break LOCA Technical Review Rept ML20203L2451998-02-23023 February 1998 Assessment Rept of Engineering & Technical Work Process Utilized at De&S Bolton Ofc ML20203L1621998-02-18018 February 1998 Rept of Root Cause Assessment Review ML20203L2691998-02-16016 February 1998 Duke Engineering & Svcs Assessment Process Review Rept ML20199B4601998-01-20020 January 1998 Special Rept:On 980105,meteorological Monnitoring Instrumentation for Air Temp Delta T Inoperable for More than 7 Days.Caused by Breakdown in Wiring Between Junction Box at 199 Foot Level.Wiring Replaced ML20203J3001997-12-31031 December 1997 Ynps 1997 Annual Rept ML20217N0981997-08-21021 August 1997 LER 97-S02-00:on 970725,discovered Uncontrolled Safeguards Documents.Caused by Personnel Error.Matls Retrieved & Stored in Safeguards Repositories ML20210H0991997-08-0707 August 1997 LER 97-S01-00:on 970709,potential Compromise of Safeguards Info Occurred.Caused by Human error.Stand-alone Personal Computer & Printer Not Connected to Network,Have Been Located within Text Graphics Svc Dept ML20149K7781997-07-24024 July 1997 Special Rept:On 970520 & 0714,air Temp Delta T Channel Indicated Temp Difference Between Top & Bottom of Meteorological Tower.Caused by Reversed Input Wiring to Channel.Restored Air Temp Delta T Channel Operability ML20141E4671997-05-30030 May 1997 Rev 28 to Operational QA Program ML20135C8461996-12-31031 December 1996 Yankee Nuclear Power Station 1996 Annual Rept ML20132G6771996-12-20020 December 1996 Rev 27 to YOQAP-I-A, Operational QA Program ML20058N4771993-12-20020 December 1993 Rev 0.0 to Yankee Nuclear Power Station Decommissioning Plan ML20059K8491993-12-15015 December 1993 Clarifications to Pages 2,41,43 & 44 of 44 in Section I, Organization of YOQAP-I-A,Rev 24, Operational QA Program ML20059C5011993-10-29029 October 1993 Special Rept:On 931019,meteorological Instrumentation Channel for Delta T Declared Inoperable.Caused by Ceased Aspirator Motor Located at Top of Tower.Motor Replaced ML20056H1741993-06-10010 June 1993 Preliminary Assessment of Potential Human Exposures to Routine Tritium Emissions from Yankee Atomic Electric Co Nuclear Power Facility Located Near Rowe,Ma ML20237F1671993-02-19019 February 1993 Safety Evaluation Supporting Amend 147 to License DPR-3 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20198D2481992-05-13013 May 1992 Yankee Nuclear Power Station Certified Fuel Handler Initial Certification Program ML20198D2541992-05-13013 May 1992 Yankee Nuclear Power Station Certified Fuel Handler Recertification Program ML20062H1981990-11-30030 November 1990 Plant Specific Fast Neutron Exposure Evaluations for First 20 Operating Fuel Cycles of Yankee Rowe Reactor ML20058H2841990-11-0303 November 1990 Special Rept:On 901101,control Rod 24 Found Disconnected from Drive Shaft.Drive Shaft Latching Will Be Initiated ML20058F2201990-11-0202 November 1990 Safety Evaluation Accepting Util Response to Generic Ltr 83-28 Re post-trip Review - Data & Info Capability ML20062E8331990-10-31031 October 1990 Monthly Operating Rept for Oct 1990 for Yankee Atomic Power Station ML20058G1471990-10-31031 October 1990 Vol 2 to Star Methodology Application for PWRs Control Rod Ejection Main Steam Line Break ML20058C4061990-10-22022 October 1990 Safety Evaluation Supporting Amend 137 to License DPR-3 ML20062B6751990-09-30030 September 1990 Monthly Operating Rept for Yankee Atomic Power Station for Sept 1990 ML20059G2411990-09-0606 September 1990 Safety Evaluation Supporting Amend 135 to License DPR-3 ML20059E3071990-08-31031 August 1990 Safety Assessment of Yaec 1735, Reactor Pressure Vessel Evaluation Rept for Yankee Nuclear Power Station. Detailed Plan of Action W/Listed Elements Requested within 60 Days After Restart to Demonstrate Ability to Operate Longer ML20059E8001990-08-31031 August 1990 Monthly Operating Rept for Aug 1990 for Yankee Atomic Power Station ML20058P7841990-08-14014 August 1990 Part 21 Rept Re Misapplication of Fluorolube FS-5 Oil in Main Steam Line Pressure Gauges.All Four Indicators Replaced W/Spare Gauges Which Utilize High Temp Silicone Oil ML20058N6581990-08-13013 August 1990 Special Rept Re Diesel Fire Pump & Tank Inoperable for Greater than Seven Days for Draining,Cleaning & Insp.During Period Redundant Pumping Capacity Available Via Two Remaining Electric Driven Fire Pumps ML20058L6651990-08-0202 August 1990 Safety Evaluation Supporting Amend 134 to License DPR-3 ML20058L0321990-08-0202 August 1990 Safety Evaluation Supporting Amend 133 to License DPR-3 ML20056A1961990-08-0101 August 1990 Special Rept:Two Fire Pumps Inoperable at Same Time.Caused by Necessity to Accomplish Surveillance to Verify Capability to Start Pump on Emergency Diesel Generator 3 & Planned 18-month Insp of Diesel Per Tech Specs ML20055G6801990-07-31031 July 1990 Yankee Plant Small Break LOCA Analysis ML20055E1591990-07-31031 July 1990 Reactor Pressure Vessel Evaluation Rept ML20055G7011990-07-31031 July 1990 Yankee Nuclear Power Station Core 21 Performance Analysis ML20055J3221990-07-25025 July 1990 Decommissioning Funding Assurance Rept & Certification ML20055G7051990-07-19019 July 1990 Rev 0 to Yankee Cycle 21 Core Operating Limits Rept ML20055F6751990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Yankee Atomic Power Station 1999-08-31
[Table view] |
Text
,
10NGg
, 4 o, UNITED STATES y }, NUCLEAR REGULATORY COMMISSION g E WASHINGTON, D. C 20555 g /SAFETYEVALUATIONBYTHEOFFICEOFNUCLEARRpCTORREGULATION
- $hPPORTINGAMENDMENTN0. 110 TO FACILITY CPERATING LICENSE N0. OpR-3
_ YANKEE ATOMIC ELECTRIC COMPANY YANKEE NUCLEAR p0WER STATION DOCKET NO.50-029 I INTRODUCTION Ry letter dated December 23, 1987 Yankee Atomic Electric Company (YAEC) or the licensee requested modifications to the Yankee Nuclear Power Station Technical Specifications (TS) governing control rod position indication. The changes 1 were requested to provide needed operational flexibility in the (TS), to )
eliminate an outdated reference to three-loop operation and to delete a reference to moveable incore detectors.
The licensee proposed to change the tolerance in TS 3.1.3.2. for the control rod position indication system from 3 inches to 8 inches. Primary control !
rod position indicators consist of variable intensity Light Emitting Diodes 1 (LED)at3inchintervals. Each LED monitors a field of 3 inches of rod I inotion. Since the interval and the allowable tolerance are the same, a single l inoperable LED can cause the operator to perform unneeded control rod position adjustments. Expanding the tolerance to 8 inches would reduce the need for control red motion because an 8 inch interval is monitored by more than two LEDs; thus, control rod manipulation would not be forced unless three LEDs in a single row fail, j
EVALUATION !
The original 3-inch limit in the Technical Specifications reflected a design !
feature of the primary indication system and not the allowable operational j tolerance. There was no basis for requiring this extra conservatism, i.e. ;
less than 8 inches. !
Standard Technical Specifications (STS), on which the Yankee T.S. are patterned, call for identical operational tolerances for two closely associated specifications; Technical Specification 3.1.3.1 which governs control rod position and Technical Specification 3.1.3.2 which governs position indication. Accordingly, this change incorporates the criteria from Yankee Technical Specification 3.1.3.1 into Specification 3.1.3.2 and brings these two Specifications into agreement.
The actual tolerance in STS 3.1.3.1 and STS 3.1.3.2 is 12 steps. However, Yankee control rod position indications are read in inches rather than steps. l Therefore, 8 inches, which is approximately the step-to-inch conversion in the l standard Westinghouse design, was adopted and currently applies to Technical l Specification 3.1.3.1. This change incorporates the same criteria into YNPS l Technical Specification 3.1.3.2. 1 I
8806290356 DR 080617 ADOCK 05000029 PDR l
1
?
Finally, as is currently stated in the basis to YNPS Technical Specificaticts,
"... control rod misalignment up to 8 inches from every other control rod in its group and for all control rod groups within their insertion limits, the hot chonnel factors will be well within the design limits."
Based on the above, we conclude that the change frorn 3 inches to 8 inches in TS 3.1.3.2 is acceptable.
The second change eliminates a reference to three-loop operation which was overlooked in NRC Amendment 88. The third change is a change to the wording for monitoring control rod location from "moveable incore detectors" to "incore detectors." With the recent insta116tiori of some fixed incore detectors, a fixed cetector may be the preferred choice for monitoring control rod location if it is the detector closest to the affected rod. The licensee subraltted data showing fixed detector signals versus time for control rod movement. It was evident from this data that the fixed incore detectors should be used to detect rod movement when these detectors are closest to the affected rod.
Based on the obove, we conclude the second and third changes are acceptable.
ENVIRONMENTAL CONSIDERATION An Environmental Assessment for this proposed action was published in the Federal Recister on June 17, 1988, (53 FR 22752). Therein, it war determined ihat tee 56p6sid changes will r,ot have a significant environmental impact because they will not increase the probability or consequences of accidents, alter the effluents which may be released offsite or significantly increase occupational radiation exposure.
CONCLUSION The stdff has concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense end security or to che health and safety of the public.
M90WLEDGEMENT Principal Contributors: Margaret Chatterton, SRXB Morton B. Fairtile Dated: June 17, 1988 l
l 4