ML20196E803
From kanterella
ML20196E803 | |
Person / Time | |
---|---|
Site: | 05000124 |
Issue date: | 02/05/1988 |
From: | Smiley D VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB |
To: | Michaels T NRC |
Shared Package | |
ML20196E759 | List: |
References | |
NUDOCS 8803010301 | |
Download: ML20196E803 (3) | |
Similar Documents at 05000124 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20073B9901991-06-18018 June 1991
[Table view]Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245D3221989-04-24024 April 1989 Advises That No Record Retention Required for Former License R-62 ML20154Q3031988-05-24024 May 1988 Forwards Insp Rept 50-124/88-01 on 880404.No Violations or Deviations Noted ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20149H8101988-02-17017 February 1988 Informs That Reactor Bldg Can Be Released for Unrestricted Use Since Residual Contamination Levels for Reactor Bldg Comply W/Reg Guide 1.86,Table 1 in Response to 860717 License Termination Request ML20196E8031988-02-0505 February 1988 Provides Addl Clarification to Final Decommissioning Rept. Data from Resurvey of Suspect Blocks Confirm That Release Criteria Not Exceeded.Resurvey Encl ML20196D5151988-02-0303 February 1988 Forwards Orau 88/A-74, Confirmatory Radiological Survey of Argonaut Reactor Facility,Virginia Polytechnic Inst & State Univ,Blacksburg,Va, Final Rept.Facility Meets Guidelines for Terminating Operating Reactors ML20238C9981987-09-0303 September 1987 Forwards Amend to Final Rept Re Dismantlement & Disposition of Facility,Including Survey Maps Denoting Grids Surveyed & Survey Data on Ventilation Duct Work & Stack,In Response to Items Identified in Insp Rept 50-124/87-01 ML20237H6661987-08-0707 August 1987 Forwards Insp Rept 50-124/87-01 on 870727-29.No Violations or Deviations Noted ML20215D2151987-06-11011 June 1987 Informs That T Micheals Assigned as Project Manager for Facility Due to NRR Reorganization ML20206D5901987-04-0606 April 1987 Forwards Argonaut Reactor Facility Decommissioning Final Rept, Per 861029 Dismantlement & Disposition Order.Facility Now Meets Unrestricted Use Criteria.Termination of License Requested ML20211G1361986-10-29029 October 1986 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts,Finding of No Significant Environ Impact,Safety Evaluation & Environ Assessment ML20214F6671986-09-10010 September 1986 Notifies of 861029-30 Physical Protection Seminar in Cherry Hill,Nj to Discuss Results of 12-yr Implementation of 10CFR73 for Protection Against Radiological Sabotage. Preliminary Agenda Encl IR 05000124/19860011986-08-22022 August 1986 Forwards Insp Rept 50-124/86-01 on 860808.No Violation or Deviation Noted.Rept Withheld (Ref 10CFR2.790 & 73.21) ML20212M2891986-08-19019 August 1986 Forwards Notice of Proposed Issuance of Orders Authorizing Dismantling of Facility & Disposition of Component Parts & Terminating Facility License, for Publication Per 860717 Application ML20214K6051986-08-13013 August 1986 Provides Clarification Re Calibr of Instrumentation Utilized for Radiation Detection,Per 860717 Request for Order Authorizing Facility Dismantlement & Disposition & Termination of License R-62 ML20212N9271986-08-11011 August 1986 Forwards Sections I & II to Region II Incident Response Plan,Incorporating Lessons Learned from 1984 Full Field Exercise.Section III Withheld.W/O Encl ML20203G0071986-07-17017 July 1986 Requests Order Authorizing Facility Dismantling & Disposition to Terminate License R-62 & Publication of Fr Notice.Forwards Decommissioning Plan,Including Security Plan,Tech Specs & Environ Rept ML20206M1691986-06-20020 June 1986 Grants 860516 Request to Take Samples from Biological Shielding of Reactor to Determine Amount of above-limit & Exempt Quantities of Reinforced Concrete That Must Be Removed ML20140G7181986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20138G9801985-10-0808 October 1985 Responds to Ltr Re Removal of Unirradiated Highly Enriched U Fuel to Secure Facility.Fuel Will Be Shipped by Proto-Power Bisco to Doe.No Fuel Will Remain at Facility by 860101 ML20112E6161985-01-10010 January 1985 Forwards Revised Tech Specs,Reflecting 841022 Request for Possession Only License ML20140C0381984-05-0808 May 1984 Partial Response to FOIA Request for All Physical Security & Safeguards Insp Repts from 1979 to Present for Ucla,Univs of Washington & Florida,Virginia Polytechnic Inst & Iowa State Univ.Info Partially Withheld (Ref FOIA Exemption 4) IA-84-227, Partial Response to FOIA Request for All Physical Security & Safeguards Insp Repts from 1979 to Present for Ucla,Univs of Washington & Florida,Virginia Polytechnic Inst & Iowa State Univ.Info Partially Withheld (Ref FOIA Exemption 4)1984-05-0808 May 1984 Partial Response to FOIA Request for All Physical Security & Safeguards Insp Repts from 1979 to Present for Ucla,Univs of Washington & Florida,Virginia Polytechnic Inst & Iowa State Univ.Info Partially Withheld (Ref FOIA Exemption 4) ML20140C0351984-03-24024 March 1984 FOIA Request for All Physical & Safeguards Insp Repts from 1979 to Present at Ucla,Univ of Washington,Univ of Florida, Virginia Polytechnic Inst & Iowa State Univ ML20079G2681984-01-17017 January 1984 Responds to 831216 Generic Ltr 83-41 Re Fast Cold Starts of Diesel Generators.No Generators Used at Facility.No Response Required ML20083G0631983-12-14014 December 1983 Describes Actions to Rectify Violation of Operator Requalification program.Hot-functional Test Program Will Be Used to Familiarize Operators W/Console.All Procedures Will Be Reviewed.Actions Adequate Until Unit Restarted ML20085L1831983-09-27027 September 1983 Forwards Revs 1 & 2 to Physical Security Plan.Revs Withheld ML20069E7341983-03-17017 March 1983 Confirms That Proposal for Tech Spec Change Has Been Reviewed & Approved by Reactor Safety Committee ML20069E7171983-03-15015 March 1983 Forwards Remaining Tech Spec Changes for Amend to License R-62.Actual Connection & Testing Contingent on N-16 Calculations & Approved Test Procedures.Table Listing Summary of Specific Changes Encl ML20071C4081983-02-22022 February 1983 Forwards Annual Rept for VA Polytechnic Inst & State Univ Research Reactor,1982 ML20064M0161983-01-11011 January 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-124/82-01.Corrective Actions:Procedure Initiated for Reactor Audit & Review & SAR Will Be Submitted to Radiation Safety Committee Re Manual Control Rod Withdrawal ML20079J4131982-12-22022 December 1982 Forwards Confirmation by Reactor Safety Committee Chairman That Proposal for Tech Spec Change Reviewed & Approved ML20079J4171982-12-16016 December 1982 Forwards Application to Amend License R-62,revising Tech Specs to Delete Ultrasonic Flow Detector W/Paddle Wheel Detector w/1% Accuracy Min ML20066G4471982-11-0202 November 1982 Forwards Public Version of Revised Emergency Response Plan ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20038A6561981-11-0909 November 1981 Advises That Dr Pratner Will Replace AP Curtner as Reactor Supervisor on 811101 ML20010H2211981-08-25025 August 1981 Responds to NRC 810817 Ltr Re Violation Noted in IE Insp Rept 50-124/81-02.Corrective Actions:Interim Procedure Change Has Been Properly Documented & Approved According to Procedure VI.6 ML19341C5371981-02-25025 February 1981 Forwards Annual Operations Rept,Nuclear Research Reactor, VA Polytechnic Inst & State Univ,1980. ML20003C0371981-02-23023 February 1981 Forwards Final Reactor Operator Requalification Program, Revised to Include Deficient Items Identified in NRC 810212 Ltr,For Inclusion in Renewal Application for License R-62 ML19345B9971980-11-26026 November 1980 Forwards Security Plan & Application for Renewal of License R-62.W/o Encls ML19344E4431980-08-25025 August 1980 Forwards Complete Application for Class 104 License for Nuclear Research Reactor Facility.Prior Issuances Encl. Application Available in Central Files Only ML19330C3531980-08-0101 August 1980 Forwards Data Re Environ Radiation Dispersion,Per M Wohl Telcon Request ML19321A4781980-07-18018 July 1980 Forwards Proposed Tech Specs & Operator Requalification Program for Research Reactor Per License R-62 ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML19345E2541980-03-19019 March 1980 Forwards Univ Draft Emergency Plan ML19309A5301980-03-19019 March 1980 Forwards PSAR ML19309B6191980-03-19019 March 1980 Forwards Sept 1979 Draft Emergency Plan ML19296B4121980-02-13013 February 1980 Forwards Annual Operating Rept 1979 1991-06-18 Category:EDUCATIONAL INSTITUTION TO NRC MONTHYEARML20196E8031988-02-0505 February 1988
[Table view]Provides Addl Clarification to Final Decommissioning Rept. Data from Resurvey of Suspect Blocks Confirm That Release Criteria Not Exceeded.Resurvey Encl ML20238C9981987-09-0303 September 1987 Forwards Amend to Final Rept Re Dismantlement & Disposition of Facility,Including Survey Maps Denoting Grids Surveyed & Survey Data on Ventilation Duct Work & Stack,In Response to Items Identified in Insp Rept 50-124/87-01 ML20206D5901987-04-0606 April 1987 Forwards Argonaut Reactor Facility Decommissioning Final Rept, Per 861029 Dismantlement & Disposition Order.Facility Now Meets Unrestricted Use Criteria.Termination of License Requested ML20214K6051986-08-13013 August 1986 Provides Clarification Re Calibr of Instrumentation Utilized for Radiation Detection,Per 860717 Request for Order Authorizing Facility Dismantlement & Disposition & Termination of License R-62 ML20203G0071986-07-17017 July 1986 Requests Order Authorizing Facility Dismantling & Disposition to Terminate License R-62 & Publication of Fr Notice.Forwards Decommissioning Plan,Including Security Plan,Tech Specs & Environ Rept ML20138G9801985-10-0808 October 1985 Responds to Ltr Re Removal of Unirradiated Highly Enriched U Fuel to Secure Facility.Fuel Will Be Shipped by Proto-Power Bisco to Doe.No Fuel Will Remain at Facility by 860101 ML20112E6161985-01-10010 January 1985 Forwards Revised Tech Specs,Reflecting 841022 Request for Possession Only License ML20079G2681984-01-17017 January 1984 Responds to 831216 Generic Ltr 83-41 Re Fast Cold Starts of Diesel Generators.No Generators Used at Facility.No Response Required ML20083G0631983-12-14014 December 1983 Describes Actions to Rectify Violation of Operator Requalification program.Hot-functional Test Program Will Be Used to Familiarize Operators W/Console.All Procedures Will Be Reviewed.Actions Adequate Until Unit Restarted ML20085L1831983-09-27027 September 1983 Forwards Revs 1 & 2 to Physical Security Plan.Revs Withheld ML20069E7341983-03-17017 March 1983 Confirms That Proposal for Tech Spec Change Has Been Reviewed & Approved by Reactor Safety Committee ML20069E7171983-03-15015 March 1983 Forwards Remaining Tech Spec Changes for Amend to License R-62.Actual Connection & Testing Contingent on N-16 Calculations & Approved Test Procedures.Table Listing Summary of Specific Changes Encl ML20071C4081983-02-22022 February 1983 Forwards Annual Rept for VA Polytechnic Inst & State Univ Research Reactor,1982 ML20064M0161983-01-11011 January 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-124/82-01.Corrective Actions:Procedure Initiated for Reactor Audit & Review & SAR Will Be Submitted to Radiation Safety Committee Re Manual Control Rod Withdrawal ML20079J4131982-12-22022 December 1982 Forwards Confirmation by Reactor Safety Committee Chairman That Proposal for Tech Spec Change Reviewed & Approved ML20079J4171982-12-16016 December 1982 Forwards Application to Amend License R-62,revising Tech Specs to Delete Ultrasonic Flow Detector W/Paddle Wheel Detector w/1% Accuracy Min ML20066G4471982-11-0202 November 1982 Forwards Public Version of Revised Emergency Response Plan ML20038A6561981-11-0909 November 1981 Advises That Dr Pratner Will Replace AP Curtner as Reactor Supervisor on 811101 ML20010H2211981-08-25025 August 1981 Responds to NRC 810817 Ltr Re Violation Noted in IE Insp Rept 50-124/81-02.Corrective Actions:Interim Procedure Change Has Been Properly Documented & Approved According to Procedure VI.6 ML19341C5371981-02-25025 February 1981 Forwards Annual Operations Rept,Nuclear Research Reactor, VA Polytechnic Inst & State Univ,1980. ML20003C0371981-02-23023 February 1981 Forwards Final Reactor Operator Requalification Program, Revised to Include Deficient Items Identified in NRC 810212 Ltr,For Inclusion in Renewal Application for License R-62 ML19345B9971980-11-26026 November 1980 Forwards Security Plan & Application for Renewal of License R-62.W/o Encls ML19344E4431980-08-25025 August 1980 Forwards Complete Application for Class 104 License for Nuclear Research Reactor Facility.Prior Issuances Encl. Application Available in Central Files Only ML19330C3531980-08-0101 August 1980 Forwards Data Re Environ Radiation Dispersion,Per M Wohl Telcon Request ML19321A4781980-07-18018 July 1980 Forwards Proposed Tech Specs & Operator Requalification Program for Research Reactor Per License R-62 ML19345E2541980-03-19019 March 1980 Forwards Univ Draft Emergency Plan ML19309A5301980-03-19019 March 1980 Forwards PSAR ML19309B6191980-03-19019 March 1980 Forwards Sept 1979 Draft Emergency Plan ML19296B4121980-02-13013 February 1980 Forwards Annual Operating Rept 1979 ML19209D0961979-09-21021 September 1979 Responds to NRC 790730 Ltr Re Impact of Safeguards Upgrade Rule on Nuclear Reactor Facility.Provides Info on Size of Academic Staff,Student Enrollment & Economic Impact ML19208A3941979-09-0707 September 1979 Notifies That Rt Stone Will Take 2-yr Leave of Absence. Effective 790901,changes Will Be Made to Positions of Reactor Supervisor & Operators ML19269D3921979-04-18018 April 1979 Responds to NRC 790323 Ltr Re Violations Noted in IE Insp Rept 50-124/79-2.Correcctive Actions:All Procedures Being Rewritten & Monthly Reactor Operator Meetings Held 1988-02-05 Category:INCOMING CORRESPONDENCE MONTHYEARML20073B9901991-06-18018 June 1991
[Table view]Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20196E8031988-02-0505 February 1988 Provides Addl Clarification to Final Decommissioning Rept. Data from Resurvey of Suspect Blocks Confirm That Release Criteria Not Exceeded.Resurvey Encl ML20196D5151988-02-0303 February 1988 Forwards Orau 88/A-74, Confirmatory Radiological Survey of Argonaut Reactor Facility,Virginia Polytechnic Inst & State Univ,Blacksburg,Va, Final Rept.Facility Meets Guidelines for Terminating Operating Reactors ML20238C9981987-09-0303 September 1987 Forwards Amend to Final Rept Re Dismantlement & Disposition of Facility,Including Survey Maps Denoting Grids Surveyed & Survey Data on Ventilation Duct Work & Stack,In Response to Items Identified in Insp Rept 50-124/87-01 ML20206D5901987-04-0606 April 1987 Forwards Argonaut Reactor Facility Decommissioning Final Rept, Per 861029 Dismantlement & Disposition Order.Facility Now Meets Unrestricted Use Criteria.Termination of License Requested ML20214K6051986-08-13013 August 1986 Provides Clarification Re Calibr of Instrumentation Utilized for Radiation Detection,Per 860717 Request for Order Authorizing Facility Dismantlement & Disposition & Termination of License R-62 ML20203G0071986-07-17017 July 1986 Requests Order Authorizing Facility Dismantling & Disposition to Terminate License R-62 & Publication of Fr Notice.Forwards Decommissioning Plan,Including Security Plan,Tech Specs & Environ Rept ML20138G9801985-10-0808 October 1985 Responds to Ltr Re Removal of Unirradiated Highly Enriched U Fuel to Secure Facility.Fuel Will Be Shipped by Proto-Power Bisco to Doe.No Fuel Will Remain at Facility by 860101 ML20112E6161985-01-10010 January 1985 Forwards Revised Tech Specs,Reflecting 841022 Request for Possession Only License ML20140C0351984-03-24024 March 1984 FOIA Request for All Physical & Safeguards Insp Repts from 1979 to Present at Ucla,Univ of Washington,Univ of Florida, Virginia Polytechnic Inst & Iowa State Univ ML20079G2681984-01-17017 January 1984 Responds to 831216 Generic Ltr 83-41 Re Fast Cold Starts of Diesel Generators.No Generators Used at Facility.No Response Required ML20083G0631983-12-14014 December 1983 Describes Actions to Rectify Violation of Operator Requalification program.Hot-functional Test Program Will Be Used to Familiarize Operators W/Console.All Procedures Will Be Reviewed.Actions Adequate Until Unit Restarted ML20085L1831983-09-27027 September 1983 Forwards Revs 1 & 2 to Physical Security Plan.Revs Withheld ML20069E7341983-03-17017 March 1983 Confirms That Proposal for Tech Spec Change Has Been Reviewed & Approved by Reactor Safety Committee ML20069E7171983-03-15015 March 1983 Forwards Remaining Tech Spec Changes for Amend to License R-62.Actual Connection & Testing Contingent on N-16 Calculations & Approved Test Procedures.Table Listing Summary of Specific Changes Encl ML20071C4081983-02-22022 February 1983 Forwards Annual Rept for VA Polytechnic Inst & State Univ Research Reactor,1982 ML20064M0161983-01-11011 January 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-124/82-01.Corrective Actions:Procedure Initiated for Reactor Audit & Review & SAR Will Be Submitted to Radiation Safety Committee Re Manual Control Rod Withdrawal ML20079J4131982-12-22022 December 1982 Forwards Confirmation by Reactor Safety Committee Chairman That Proposal for Tech Spec Change Reviewed & Approved ML20079J4171982-12-16016 December 1982 Forwards Application to Amend License R-62,revising Tech Specs to Delete Ultrasonic Flow Detector W/Paddle Wheel Detector w/1% Accuracy Min ML20066G4471982-11-0202 November 1982 Forwards Public Version of Revised Emergency Response Plan ML20038A6561981-11-0909 November 1981 Advises That Dr Pratner Will Replace AP Curtner as Reactor Supervisor on 811101 ML20010H2211981-08-25025 August 1981 Responds to NRC 810817 Ltr Re Violation Noted in IE Insp Rept 50-124/81-02.Corrective Actions:Interim Procedure Change Has Been Properly Documented & Approved According to Procedure VI.6 ML19341C5371981-02-25025 February 1981 Forwards Annual Operations Rept,Nuclear Research Reactor, VA Polytechnic Inst & State Univ,1980. ML20003C0371981-02-23023 February 1981 Forwards Final Reactor Operator Requalification Program, Revised to Include Deficient Items Identified in NRC 810212 Ltr,For Inclusion in Renewal Application for License R-62 ML19345B9971980-11-26026 November 1980 Forwards Security Plan & Application for Renewal of License R-62.W/o Encls ML19344E4431980-08-25025 August 1980 Forwards Complete Application for Class 104 License for Nuclear Research Reactor Facility.Prior Issuances Encl. Application Available in Central Files Only ML19330C3531980-08-0101 August 1980 Forwards Data Re Environ Radiation Dispersion,Per M Wohl Telcon Request ML19321A4781980-07-18018 July 1980 Forwards Proposed Tech Specs & Operator Requalification Program for Research Reactor Per License R-62 ML19345E2541980-03-19019 March 1980 Forwards Univ Draft Emergency Plan ML19309A5301980-03-19019 March 1980 Forwards PSAR ML19309B6191980-03-19019 March 1980 Forwards Sept 1979 Draft Emergency Plan ML19296B4121980-02-13013 February 1980 Forwards Annual Operating Rept 1979 ML19209D0961979-09-21021 September 1979 Responds to NRC 790730 Ltr Re Impact of Safeguards Upgrade Rule on Nuclear Reactor Facility.Provides Info on Size of Academic Staff,Student Enrollment & Economic Impact ML19208A3941979-09-0707 September 1979 Notifies That Rt Stone Will Take 2-yr Leave of Absence. Effective 790901,changes Will Be Made to Positions of Reactor Supervisor & Operators ML19269D3921979-04-18018 April 1979 Responds to NRC 790323 Ltr Re Violations Noted in IE Insp Rept 50-124/79-2.Correcctive Actions:All Procedures Being Rewritten & Monthly Reactor Operator Meetings Held 1991-06-18 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20196E803&oldid=2979807"