ML19309B619

From kanterella
Jump to navigation Jump to search
Forwards Sept 1979 Draft Emergency Plan
ML19309B619
Person / Time
Site: 05000124
Issue date: 03/19/1980
From: Parkinson T
VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB
To: Ramos S
Office of Nuclear Reactor Regulation
References
NUDOCS 8004040468
Download: ML19309B619 (1)


Text

{{#Wiki_filter:- a. ~ VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVE-A c-N Q 3.' Bladsburg, l'argink 24M N LcLtan.\\cT v AT:os.\\ s ALn:s L.tsoR Aron' March 19, 1960 Mr. S teve Ramos ~ Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Ramos:

Enclosed are two copies of the Preliminary Safety Analysis Report for the VPI & SU reactor (License R-62). This document was prepared for opera-tion at a maximum power level of 500 kw. The PSAR has been reviewed and approved by both the Reactor Safety Committee and the Radiation Safety Com-mittee. We would appreciate your reviewing the PSAR at your earliest convenience so that we can proceed with all the required construction work. Our tenta-tive schedule for construction is as follows: 9 April 1, 1980: Start installation of cooling tower May 1, 1980 Start installation of new heat exchanger June 1, 1980 : Start modification of primary coolant system Enclosed also are two preliminary copies of our Emergency Plan which has also been reviewed by the Reactor Safety Committee and the Radiation Safety Committee. Thanks for your cooperation. Sincerely yours, -3..? T. F. Parkinson, Director Nuclear Re n cor Laboratory TFP/fbl ec: A. P. Curtner, Reactor Supervisor R. H. Miller, Chairman, Reactor Safety Committee R. A. Teekell, Chairman, Radiation Safety Committee 0 9g \\\\ i i \\ l l h = goo 4o40%8 F

====*=s}}