(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20125D5071992-12-14014 December 1992 Proposed Tech Specs Re Deletion of AC Sources & Onsite Power Distribution Sys Requirements & Changing Frequency of Radiological Effluent Release Reporting Requirements ML20086K0981991-12-0505 December 1991 Proposed Tech Spec Section 6.5.1 Re Site Review Committee & 6.5.2 Re Independent Review Panel ML20079P3981991-10-31031 October 1991 Proposed Tech Specs 6.5.1 & 6.5.2 Re Site Review Committee & Independent Review Panel,Respectively ML20070H6191991-03-11011 March 1991 Proposed Tech Specs Removing License Condition 14 from License NPF-82 ML20070D4921991-02-26026 February 1991 Proposed Tech Specs Re Seismic Monitoring Instrumentation Surveillance Requirements,Radiation Monitoring Instrumentation & Administrative Controls ML20058E3051990-10-30030 October 1990 Proposed Tech Specs Replacing Pages 3/4 4-1 & 3/4 4-3 of Defueled Tech Specs ML20059G3701990-08-30030 August 1990 Revised Tech Specs Re Limiting Conditions for Fuel Handling Operation ML20056B5081990-08-21021 August 1990 Proposed Tech Specs,Deleting Section 6.2.3, Independent Safety Engineering Group (Iseg) & Associated Administrative Controls ML20058N5431990-08-10010 August 1990 Proposed Tech Specs Re Defueled SAR ML20044A8011990-06-28028 June 1990 Proposed Tech Specs Designating Long Island Power Authority as Plant Licensee Upon or After NRC Amends License to Nonoperating Status ML20006F4711990-02-20020 February 1990 Proposed Tech Specs Conforming to Guidance of Generic Ltr 89-01, Implementation of Programmatic Controls for Radiological Effluent Tech Specs in Administrative Controls Section of Tech Specs & Relocation of Procedural.... ML20005F2481990-01-0505 January 1990 Proposed Tech Specs Re Defueled Facility OL ML20246N9731989-07-13013 July 1989 Proposed Tech Specs Removing Inconsistency in Plant Procedural Change Approval Process ML20246E5891989-04-30030 April 1989 Technical Specifications for Shoreham Nuclear Power Station, Unit 1.Docket No. 50-322.(Long Island Lighting Company) SNRC-1509, Proposed Tech Spec Table 1.2, Operational Conditions1988-10-19019 October 1988 Proposed Tech Spec Table 1.2, Operational Conditions ML20151D7141988-07-15015 July 1988 Proposed Tech Specs Re Test Frequency of Emergency Diesel Generators ML20151D7421988-07-11011 July 1988 Proposed Tech Specs Clarifying Method of Demonstating Operability of Source Range Monitor Channels ML20154M6321988-05-24024 May 1988 Proposed Tech Specs,Changing Alarm/Trip Setpoint and Measurement Range of Main Control Room Vent Radiation Monitors ML20154H1471988-05-19019 May 1988 Proposed Tech Spec Pages 3/4 5-6 & 3/4 5-8,providing Clarification to Eliminate Possibility of Misinterpretation ML20236C4661987-10-14014 October 1987 Proposed Tech Specs,Correcting Tupos & Tech Spec Internal Inconsistencies Re Radiological Environ Monitoring & Designation of Number of Valves in Table 3.6.3-1 ML20238C4471987-09-0404 September 1987 Proposed Tech Spec Pages 1-2,3/4 1-1,3/4 1-2,3/4 1-6, 3/4 3-4,3/4 9-3 & 3/4 9-7,changing Definition of & Footnotes Re Core Alteration ML20206F8791987-04-10010 April 1987 Proposed Amended Tech Specs Re Surveillance Testing for B-10 Enrichment Level of Standby Liquid Control Sys Tank ML20210C7791987-02-0404 February 1987 Proposed Tech Specs,Implementing Design Change That Will Equip Standby Liquid Control Sys W/Slightly More than Twice Equivalent Control Capacity Required by 10CFR50.62(c)(4) ML20212J4751987-01-21021 January 1987 Proposed Tech Specs,Incorporating License Change Application 6 to Implement Design Change to Lower Reactor Vessel Water Level of MSIVs & Steam Line Drain Valves from Level 2 to Level 1 ML20207P9631987-01-12012 January 1987 Proposed Tech Specs Re Location of Meteorological Towers & Composition of Independent Safety Engineering Group ML20206P2741986-06-26026 June 1986 Proposed Tech Specs Re Semiannual Radioactive Effluent Release Rept & Review of Operations Committee Responsibilities ML20140A8101986-01-20020 January 1986 Proposed Tech Spec Correcting Error in Basis for Location of Milk Control Sample & Eliminating Sampling Analysis If No Waste Batch Released During Month ML20137Z2941985-12-0909 December 1985 Revised Tech Spec Table 3.3.7.9-1, Fire Detection Instrumentation ML20136B4451985-11-16016 November 1985 Proposed Tech Specs Increasing & Relocating Fire Detectors & Modifying Reactor Coolant Leakage Detection Sys Surveillance Requirement ML20138C8791985-10-21021 October 1985 Proposed Tech Specs Re Conversion of Reactor Bldg Standby Ventilation Sys low-range Noble Gas Radiation Monitor to Vent Stack low-range Nobel Gas Radiation Monitor ML20128M1371985-07-31031 July 1985 Technical Specifications for Shoreham Nuclear Power Station, Unit No. 1.Docket No. 50-322.(Long Island Lighting Company) SNRC-1181, Proposed Tech Spec 3.10.5 Suspending Provisions of Tech Spec 3.6.6.2 During Performance of Startup Test Program Until Reactor Has Operated for 120 EFPD1985-06-19019 June 1985 Proposed Tech Spec 3.10.5 Suspending Provisions of Tech Spec 3.6.6.2 During Performance of Startup Test Program Until Reactor Has Operated for 120 EFPD 1992-12-14
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20077L3581994-10-25025 October 1994 Proposed Confirmatory Survey Plan for Reactor Bldg,Shoreham Nuclear Power Station,Brookhaven,Ny ML20071Q2491994-07-31031 July 1994 Rev 3 to Shoreham Decommissioning Project Termination Survey Plan ML20063D0261993-12-31031 December 1993 Revised Rev 2 to Shoreham Decommissioning Project Termination Survey Plan ML20059K1061993-08-25025 August 1993 Proposed Confirmatory Survey Plan for Shoreham Nuclear Power Station Brookhaven,Ny ML20073E9171993-07-0707 July 1993 Rev 0 to Operations Plan for Marine Transportation of Fuel Shipment from Shoreham,Ny to Eddystone,Pa ML20063D0121993-04-30030 April 1993 Revised Rev 1 of Shoreham Decommissioning Project Termination Survey Plan ML20128P6781993-02-17017 February 1993 Rev 1 to 67X001.06, Termination Survey Release Record Content & Preparation ML20128P6981993-02-0909 February 1993 Rev 1 to 67X001.10, Termination Survey Design ML20128P6571993-02-0202 February 1993 Rev 0 to 67X001.02, Shoreham Decommissioning Project Termination Survey Procedure ML20128P6661993-01-29029 January 1993 Rev 0 to 67X001.03, Termination Survey Quality Control ML20128P7011993-01-19019 January 1993 Rev 0 to 67X001.12, Termination Survey Section Conduct of Operations ML20128P6941993-01-0808 January 1993 Rev 1 to 67X001.09, Termination Survey Background Assessment ML20128P6831993-01-0808 January 1993 Rev 0 to 67X001.07, Termination Survey Document Control & File Mgt ML20128P6751993-01-0707 January 1993 Rev 1 to 67X001.05, Termination Survey Data Receipt & Mgt ML20128P6701993-01-0606 January 1993 Rev 0 to 67X001.04, Termination Survey Unit Turnover & Control Procedure ML20127B8101993-01-0505 January 1993 Plan for Phased Decommissioning of Liquid Radwaste Sys ML20125D5071992-12-14014 December 1992 Proposed Tech Specs Re Deletion of AC Sources & Onsite Power Distribution Sys Requirements & Changing Frequency of Radiological Effluent Release Reporting Requirements ML20128P6881992-12-10010 December 1992 Rev 0 to 67X001.08, Survey Unit Classification Description ML20128P7211992-10-31031 October 1992 Rev 0 to Shoreham Decommissioning Project Termination Survey Plan ML20128P7151992-10-22022 October 1992 Rev 1 to PDXOM-01, Nuclear Organization Mgt Control Program for Decommissioning Termination Survey Program Description ML20128P6471992-10-0101 October 1992 Rev 0 to 67X001.01, Termination Survey History File Content & Preparation ML20094M7681992-03-27027 March 1992 Joint Contingency Plan of Long Island Lighting Company & Long Island Power Authority Required by NRC Order Approving Shoreham License Transfer-Feb 29, 1992 ML20086K0981991-12-0505 December 1991 Proposed Tech Spec Section 6.5.1 Re Site Review Committee & 6.5.2 Re Independent Review Panel ML20079N0681991-11-11011 November 1991 Excerpts from Shoreham Solid Waste Process Control Program ML20079P3981991-10-31031 October 1991 Proposed Tech Specs 6.5.1 & 6.5.2 Re Site Review Committee & Independent Review Panel,Respectively ML20090A8321991-08-0707 August 1991 Rev 18 to 4170002, Shoreham Nuclear Power Station Unit 1 Odcm ML20082K9491991-05-31031 May 1991 Shoreham Nuclear Power Station - Unit 1 Offsite Dose Calculation Manual ML20070H6191991-03-11011 March 1991 Proposed Tech Specs Removing License Condition 14 from License NPF-82 ML20070D4921991-02-26026 February 1991 Proposed Tech Specs Re Seismic Monitoring Instrumentation Surveillance Requirements,Radiation Monitoring Instrumentation & Administrative Controls ML20058E3051990-10-30030 October 1990 Proposed Tech Specs Replacing Pages 3/4 4-1 & 3/4 4-3 of Defueled Tech Specs ML20059G3701990-08-30030 August 1990 Revised Tech Specs Re Limiting Conditions for Fuel Handling Operation ML20056B5081990-08-21021 August 1990 Proposed Tech Specs,Deleting Section 6.2.3, Independent Safety Engineering Group (Iseg) & Associated Administrative Controls ML20058N5431990-08-10010 August 1990 Proposed Tech Specs Re Defueled SAR ML20044A8011990-06-28028 June 1990 Proposed Tech Specs Designating Long Island Power Authority as Plant Licensee Upon or After NRC Amends License to Nonoperating Status ML20006F4711990-02-20020 February 1990 Proposed Tech Specs Conforming to Guidance of Generic Ltr 89-01, Implementation of Programmatic Controls for Radiological Effluent Tech Specs in Administrative Controls Section of Tech Specs & Relocation of Procedural.... ML20006F4881990-02-20020 February 1990 Draft Odcm. ML20064A3381990-01-31031 January 1990 Rev 15 to 4170002, Odcm ML20005F2481990-01-0505 January 1990 Proposed Tech Specs Re Defueled Facility OL SNRC-1620, Suppl 15 to Startup Rept for Period 890501-08011989-08-15015 August 1989 Suppl 15 to Startup Rept for Period 890501-0801 ML20246N9731989-07-13013 July 1989 Proposed Tech Specs Removing Inconsistency in Plant Procedural Change Approval Process SNRC-1597, Suppl 14 to Startup Rept for Period 890201-05011989-05-0101 May 1989 Suppl 14 to Startup Rept for Period 890201-0501 ML20246E5891989-04-30030 April 1989 Technical Specifications for Shoreham Nuclear Power Station, Unit 1.Docket No. 50-322.(Long Island Lighting Company) ML20246N4871989-01-31031 January 1989 Rev 14 to Offsite Dose Calculation Manual SNRC-1513, Suppl 12 to Startup Rept for Period Aug-Nov 19881988-11-0909 November 1988 Suppl 12 to Startup Rept for Period Aug-Nov 1988 SNRC-1509, Proposed Tech Spec Table 1.2, Operational Conditions1988-10-19019 October 1988 Proposed Tech Spec Table 1.2, Operational Conditions ML20235U9341988-09-13013 September 1988 Rev 5 to Solid Waste Process Control Program SNRC-1484, Suppl 11 to Startup Rept for May-Aug 19881988-08-0303 August 1988 Suppl 11 to Startup Rept for May-Aug 1988 ML20151D7141988-07-15015 July 1988 Proposed Tech Specs Re Test Frequency of Emergency Diesel Generators ML20151D6081988-07-13013 July 1988 Rev 1 to Procedure 21.009.02, Technical Review of New or Revised Symptom Oriented Emergency Operating Procedures ML20151D4191988-07-13013 July 1988 Rev 1 to Plant Specific Technical Guideline 1, Introduction & Operator Precaution 1994-07-31
[Table view] |
Text
~ ,
.~.
SNRC-1451 Attachment 2 INSTRUMENTATION Page 1 of 2 SOURCE RANGE MONITORS LIMITING CONDITION FOR OPERATION 3.3.7.6 At least the following source range monitor channels shall be OPERABLE:
' a. In OPERATIONAL CONDITION 2*, three. '
- b. In OPERATIONAL CONDITION 3 and 4, two.
APPLICABILITY: OPERATIONAL CONDITIONS 2*, 3 and 4.
ACTION:
a.- In OPERATIONAL CONDITION 2* vith one of the above required source range monitor channels inoperable, restore at least 3 source range monitor channels to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN vithin the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. In OPERATIONAL CONDITION 3 or 4 vith one or more of the above required source range monitor channels inoperable, verify all insertable control rods to be inserted in the core and lock the reactor mode switch in the Shutdown Position within one hour.
SURVEILLANCE REQUIREMENTS 4.3.7.6 Each of the above required source range monitor channels shall be demonstrated OPERABLE by:
- a. Performance of as
- 1. CHANNEL CHECK at least once pert a) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in CONDITION 2*, and b) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in CONDITION 3 or 4.
- 2. CHANNEL CALIBRATION ** at least once per 18 months
- b. Performance of a CHANNEL FUNCTIONAL TEST:
- 1. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to moving the reactor mode switch from the Shutdovn po'sition, if not performed within the previous 7 days, and
- 2. At least once per 31 days.
- c. Verifying, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to withdrawal of control rods that
- 1. The SRM count rate is at least 3.0 cps # with the detector fully l inserted.
l
- Vith IRM's on range 2 or belov.
- Neutron detectors may be excluded from CHANNEL CALIBRATION.
f The count rate may be as lov as 0.7 cps if the signal to noise ratio is > 2.0.
SHORERAM - UNIT 1 3/4 3-75 3807250223 880711 PDR ADOCK 05000322 P PDC
C.. ._
3.: - -:
, 2,2 SNRC-1451 .l.~.
Attachment 2 Page 2 of 2 -
REFUELING OPERATIONS SURVEILLANCE REQUIREMENTS (Continued)
-w+,
- b. Performance of a CHANNEL FUNCTIONAL TEST:
- 1. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the start of CORE ALTERATIONS, and
- 2. At least once per 7 days. =
- c. Verifying that the channel count rate is at least 3.0 cps #: l
- 1. Prior to control rod withdrawal,
- 2. Prior to and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS, and
- 3. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- d. Verifying, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during, that the RPS circuitry "shorting links" have been removed '~'
during: . _ .
- 1. The time any control rod is withdrawn, if or
- 2. Shutdown margin demonstrations.
M P-W*
iThe count rate may be as lov as 0.7 cps if the signal to noise l ratio is >2.0.
- Not required for control rods removed per Specification 3.9.10.1 or 3.9.10.2 SHORERkt! - UNIT 1 3/4 9-4
._.