ML20246N973
| ML20246N973 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 07/13/1989 |
| From: | LONG ISLAND LIGHTING CO. |
| To: | |
| Shared Package | |
| ML20246N960 | List: |
| References | |
| NUDOCS 8907200076 | |
| Download: ML20246N973 (1) | |
Text
,
's ;..
ADMINISTRATIVE CONTROLS h~ U,'
n "6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established.. implemented, and maintained covering the activities referenced below:
The applicable procedures recommended in Appendix A of. Regulatory a.
L Guide 1.33, Revision 2, February 1978.
b.
The applicable procedures required to ieplement the requirements of NUREG-0737.
c.
Refueling operations.
d.
Surveillance and test activities of safety-related equipment, e.
. Security Plan implementation, f.
Emergency Plan implementation.
-g.
Fire Protection Program implementation.
h.
PROCESS CONTROL PROGRAM implementation.
i.
OFFSITE DOSE CALCULATION MANUAL implementation, j.
Quality Assurance. Program for effluent and environmental monitoring.
6.8.2 Each procedure of Specification 6.8.1, and changes.thereto, shall be reviewed by the ROCc;_d the!' b.: ag = ed By ine "!ent 82 - = 4 rior to implementation.
The Plent Manager shall approve Station Y$5Tistrative prc:edures, Security Plan implementing procedures and Emergency plan implementing procedures prior to. implementation.' Other procedures of A+
Specification 6.8.1 shall be approved by the appropriate plant Division Manager or by the Plant Manager prior to implementation.
Each Plant Division
+
Hanager shall be responsible for a designated set of procedures.
These procedures shall be reviewed periodically as set forth in administrative procedures.
6.8.3 Temporary changes to procedures of Specification 6.8.1 may be made provided:
The intent of the original procedure is not altered; a.
b.
The change is. approved by two members of the unit management staff, at least one of whom holds a Senior Reactor Operator's license on the unit affected; and The change is documented, reviewed by the ROC, and approved by the c.
PTant Manager within 14 days of implementation.
6.8.4 The following programs shall be established, implemented, and maintained:
a.
Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the Core Spra.y High Pressure Coolant Injection, Residual Heat Removal, Reactor Core Isolation Cooling, Hydrogen Recombiners, Reactor Water Cleanup, Coolant Sampling, Reactor Building Equipment Drain, Reactor Building Floor Drain, and Reactor Building Standby Ventilation System, Instrumentation Lines and Post Accident Monitoring System.
SHOREHAM - UNIT 1 6-13 1
8907200076 890713 PDR ADOCK 05000322 P
PDC n