.a SNRC-1509 Attachment 2 Page 1 of 1 DEFINITIONS ,

TABLE 1.2 OPERATIONAL CONDITIONS MODE SWITCH AVERAGE REACTOR CONDITION POSITION COOLANT TEMPERATURE

1. POWER OPERATION Run Any temperature
2. STARTUP Startup/ Hot Standby Any temperature
3. HOT SHUTDOWN Shutdown # *** =200'F
4. COLD SHUTDOWN Shutdown f ## *** s200'F
5. REFUELING
  • Shutdown or Refuel ** f m140*F
  1. The reactor mode switch may be placed in the Pun or Startup/ Hot Standby position to test the switch interlock functions provided that the control rods are verified to remain fully inserted by a second licensed operator or other technically qualified member of the unit technical staff, ifThe reactor mode switch may be placed i, the Refuel position while a single control rod drive is being removed from the reactor pressure vessel por Specification 3.9.10.1.
  • Fuel in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.
    • See Special Test Exceptions 3.10.1 and 3.10.3.
      • The reactor mode switch may be placed in the Refuel position ,

while a single contral rod is being recoupled or exercised l provided that the one-rod-out interlock is OPERABLE.

sato270092 ssioto POR ADOCK O'300032?